Student or educator? Sign up with your school email and get 6 months of Pro free.
CoChat
Cited by 242

The DOI matches its Crossref record.

Optimal daily generation scheduling of large hydro–photovoltaic hybrid power plants

Ming, Bo, Liu, Pan, Cheng, Lei, Zhou, Yanlai, Wang, Xianxun · 2018 · Energy Conversion and Management

Abstract

Abstract Joint operation of large-scale renewable energy sources (e.g., hydro and solar) has become a trend in modern power systems, and more operators of existing hydropower reservoir systems are adopting it. This study aimed to improve guidance for the daily generation scheduling of a large hydro–photovoltaic (PV) power plant. First, a robust optimization model that accounts for uncertain PV power generation was formulated, in which the delivered power output of the hybrid system and hydro unit status are robust decision variables. To deal with the complexity of the model solution, a three-layer nested framework was proposed to solve the generation scheduling problem in a hierarchical structure. In the outer layer, a direct search algorithm optimizes the delivered power output of the system, aiming to maximize energy production while satisfying specified load characteristics. In the middle and inner layers, a cuckoo search algorithm and dynamic programming technique optimize the hydro unit status and load dispatch strategies, respectively, with the objective of minimizing water consumption. Finally, a decision interval on delivered power output of the system was derived by relaxing the load characteristic constraint. Results for a case study using China’s Longyangxia hydro–PV power plant indicated that the robust optimization model and the three-layer nested approach could provide effective power generation plans for the hybrid system within a reasonable time. Compared with actual operation, the power generation plans could increase energy production of the hybrid system by 1.9% while decreasing total online time of the hydro units by 9.7%. Therefore, the proposed method could improve guidance for the hydro–PV power plant’s generation scheduling. In practice, conjunctive use of the power generation plan and the decision interval could also inform flexible decision-making for plant operations management.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.enconman.2018.06.001

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 242

Metadata

Authors
Ming, B., Liu, P., Cheng, L., Zhou, Y., & Wang, X.
Venue
Energy Conversion and Management
Publisher
Elsevier BV
Published
2018-09
Volume
171
Pages
528-540
ISSN
0196-8904 (ISSN-L)
OpenAlex
W2807764341
Cited by
242
References
0
FWCI
9.69
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Optimal daily generation scheduling of large hydro–photovoltaic hybrid power plants. https://app.cochat.ai/papers/10.1016/j.enconman.2018.06.001
The paper
Ming, B., Liu, P., Cheng, L., Zhou, Y., & Wang, X. (2018). Optimal daily generation scheduling of large hydro–photovoltaic hybrid power plants. Energy Conversion and Management. https://doi.org/10.1016/j.enconman.2018.06.001

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.