An international comparative assessment of construction cost overruns for electricity infrastructure
Open accessAbstract
Earlier this year, we assessed the construction costs affiliated with 401 electricity infrastructure projects worldwide. We found that these projects collectively involved $820 billion worth of investment, and represented more than 325,000 MW of installed capacity and 8500 km of transmission lines. Taken together, these projects incurred $388 billion in cost overruns, equivalent to a mean cost escalation of $968 million per project, or a 66.3 percent overrun per project. In this article, we extend upon that earlier analysis to explain how hydroelectric dams, nuclear reactors, wind farms, solar facilities, fossil fueled thermal plants, and transmission lines pose distinct construction risks. We highlight that electricity infrastructure is prone to cost overrun issues almost independently of technology or location, that hydroelectric dams and nuclear reactors have the greatest amount and frequency of cost overruns, even when normalized to overrun per installed MW, and that solar and wind projects seem to present the least construction risk. Consequently, investors, electric utilities, public officials, and energy analysts need to rethink and reevaluate the methodologies they use to predict construction timetables and calculate budgets.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Prospect Theory: An Analysis of Decision under Risk
Kahneman, D., & Tversky, A. (1979) · Econometrica · doi:10.2307/1914185 · Cited by 48,524
Cited by
Bataille, C., Åhman, M., Neuhoff, K., Nilsson, L. J., Fischedick, M., Lechtenböhmer, S., Solano-Rodriquez, B., Denis-Ryan, A., Stiebert, S., Waisman, H., et al. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.03.107 · Cited by 680
Simulation versus Optimisation: Theoretical Positions in Energy System Modelling
Lund, H., Arler, F., Østergaard, P., Hvelplund, F., Connolly, D., Mathiesen, B., & Karnøe, P. (2017) · Energies · doi:10.3390/en10070840 · Cited by 259
A strategy to improve expert technology forecasts
Savage, T., Davis, A., Fischhoff, B., & Morgan, M. G. (2021) · Proceedings of the National Academy of Sciences · doi:10.1073/pnas.2021558118 · Cited by 24
Metadata
- Authors
- Sovacool, B. K., Gilbert, A., & Nugent, D.
- Venue
- Energy Research & Social Science
- Publisher
- Elsevier BV
- Published
- 2014-09
- Volume
- 3
- Pages
- 152-160
- ISSN
- 2214-6296 (ISSN-L)
- OpenAlex
- W2060013843
- Cited by
- 185
- References
- 1
- FWCI
- 12.73
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: An international comparative assessment of construction cost overruns for electricity infrastructure. https://app.cochat.ai/papers/10.1016/j.erss.2014.07.016
- The paper
- Sovacool, B. K., Gilbert, A., & Nugent, D. (2014). An international comparative assessment of construction cost overruns for electricity infrastructure. Energy Research & Social Science. https://doi.org/10.1016/j.erss.2014.07.016
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.