The DOI matches its Crossref record; 16 of the 16 references it cites were found in a registry or an index.
Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Simulation Modeling and Analysis.
Schervish, M. J., Law, A. M., & Kelton, W. D. (1983) · Journal of the American Statistical Association · doi:10.2307/2288169 · Cited by 8,697
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
Production and Operations Analysis
Nahmias, S. (1992) · Cited by 1,213
Toyota Production System: An Integrated Approach to Just-In-Time
Monden, Y. (1993) · Cited by 957
The Benefits of Lean Manufacturing
Melton, T. (2005) · Chemical Engineering Research and Design · doi:10.1205/cherd.04351 · Cited by 571
Lean manufacturing—tools, techniques, and how to use them
(2001) · Journal of Manufacturing Systems · doi:10.1016/s0278-6125(01)80022-4 · Cited by 330
Simulation Modeling and Analysis
Deal, R. B., Law, A. M., & Kelton, W. D. (1994) · Technometrics · doi:10.2307/1269971 · Cited by 309
Measurement of overall equipment effectiveness as a basis for TPM activities
Ljungberg, Õ. (1998) · International Journal of Operations & Production Management · doi:10.1108/01443579810206334 · Cited by 289
Detty, R. B., & Yingling, J. C. (2000) · International Journal of Production Research · doi:10.1080/002075400189509 · Cited by 274
Toyota production system: An integrated approach to Just-In-Time
Yazdani, B. (1995) · Computer Integrated Manufacturing Systems · doi:10.1016/0951-5240(95)90010-1 · Cited by 253
Cited by
Lean manufacturing: literature review and research issues
Bhamu, J., & Singh Sangwan, K. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-08-2012-0315 · Cited by 983
The evolution and future of manufacturing: A review
Esmaeilian, B., Behdad, S., & Wang, B. (2016) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2016.03.001 · Cited by 686
The impact of lean methods and tools on the operational performance of manufacturing organisations
Belekoukias, I., Garza-Reyes, J. A., & Kumar, V. (2014) · International Journal of Production Research · doi:10.1080/00207543.2014.903348 · Cited by 474
Tortorella, G. L., Giglio, R., & van Dun, D. H. (2019) · International Journal of Operations & Production Management · doi:10.1108/ijopm-01-2019-0005 · Cited by 444
Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study
Rahani, A. R., & al-Ashraf, M. (2012) · Procedia Engineering · doi:10.1016/j.proeng.2012.07.375 · Cited by 295
Metadata
- Authors
- Abdulmalek, F. A., & Rajgopal, J.
- Venue
- International Journal of Production Economics
- Publisher
- Elsevier BV
- Published
- 2007-05
- Volume
- 107
- Issue
- 1
- Pages
- 223-236
- ISSN
- 0925-5273 (ISSN-L)
- OpenAlex
- W1972444232
- Cited by
- 1,046
- References
- 16
- FWCI
- 20.08
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study. https://app.cochat.ai/papers/10.1016/j.ijpe.2006.09.009
- The paper
- Abdulmalek, F. A., & Rajgopal, J. (2007). Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study. International Journal of Production Economics. https://doi.org/10.1016/j.ijpe.2006.09.009
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.