The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study
Open accessAbstract
Click ‘Lean” approach has been applied more than frequent in many manufacturing management floors over these few decades. Started in the automotive industry, sequential improvement initiatives were implemented to enhance the manufacturing practice changes. The team described a case where Lean Production (LP) principles were adapted for the process sector of an automotive part manufacturing plant. Value Stream Mapping (VSM) is one of the key lean tools used to identify the opportunities for various lean techniques. The contrast of the before and after the LP initiatives in determine managers potential benefits such as reduced production lead-time and lower work-in-process inventory. As VSM involves in all of the process steps, both value added and non-value added, are analyzed and using VSM as a visual tool to help see the hidden waste and sources of waste. A Current State Map is drawn to document how things actually operated on the production floor. Then, a Future State Map is developed to design a lean process flow through the elimination of the root causes of waste and through process improvements. An Implementation Plan then outline details of the steps needed to support the LP objectives. This paper demonstrates the VSM techniques and discusses the application in an LP initiative on a product (Front disc, D45T) case study.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Abdulmalek, F. A., & Rajgopal, J. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.09.009 · Cited by 1,046
Value stream mapping: A distribution industry application
Hines, P., Rich, N., & Esain, A. (1999) · Benchmarking: An International Journal · doi:10.1108/14635779910258157 · Cited by 196
The Application of Value Stream Mapping Based Lean Production System
Chen, L., & Meng, B. (2010) · International Journal of Business and Management · doi:10.5539/ijbm.v5n6p203 · Cited by 69
Cited by
Abu, F., Gholami, H., Mat Saman, M. Z., Zakuan, N., & Streimikiene, D. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.06.279 · Cited by 197
Lacerda, A. P., Xambre, A. R., & Alvelos, H. M. (2016) · International Journal of Production Research · doi:10.1080/00207543.2015.1055349 · Cited by 162
Khaba, S., & Bhar, C. (2018) · International Journal of Quality & Reliability Management · doi:10.1108/ijqrm-02-2017-0024 · Cited by 33
Metadata
- Authors
- Rahani, A. R., & al-Ashraf, M.
- Venue
- Procedia Engineering
- Publisher
- Elsevier BV
- Published
- 2012
- Volume
- 41
- Pages
- 1727-1734
- ISSN
- 1877-7058 (ISSN-L)
- OpenAlex
- W2067449447
- Cited by
- 295
- References
- 3
- FWCI
- 22.23
- Type
- conference paper
- Language
- en
- Open access
- diamond
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study. https://app.cochat.ai/papers/10.1016/j.proeng.2012.07.375
- The paper
- Rahani, A. R., & al-Ashraf, M. (2012). Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study. Procedia Engineering. https://doi.org/10.1016/j.proeng.2012.07.375
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.