Hybrid flow shop scheduling considering machine electricity consumption cost
The DOI matches its Crossref record; 23 of the 23 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A fast and elitist multiobjective genetic algorithm: NSGA-II
Deb, K., Pratap, A., Agarwal, S., & Meyarivan, T. (2002) · IEEE Transactions on Evolutionary Computation · doi:10.1109/4235.996017 · Cited by 50,053
Ant system: optimization by a colony of cooperating agents
Dorigo, M., Maniezzo, V., & Colorni, A. (1996) · IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics) · doi:10.1109/3477.484436 · Cited by 12,067
Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. R. (1979) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70356-x · Cited by 5,854
Inspiration for optimization from social insect behaviour
Bonabeau, E., Dorigo, M., & Theraulaz, G. (2000) · Nature · doi:10.1038/35017500 · Cited by 912
The hybrid flow shop scheduling problem
Ruiz, R., & Vázquez-Rodríguez, J. A. (2010) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.09.024 · Cited by 854
The ant system applied to the quadratic assignment problem
Maniezzo, V., & Colorni, A. (1999) · IEEE Transactions on Knowledge and Data Engineering · doi:10.1109/69.806935 · Cited by 744
An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
Xia, W., & Wu, Z. (2005) · Computers & Industrial Engineering · doi:10.1016/j.cie.2005.01.018 · Cited by 681
Operational methods for minimization of energy consumption of manufacturing equipment
Mouzon, G., Yildirim, M. B., & Twomey, J. (2007) · International Journal of Production Research · doi:10.1080/00207540701450013 · Cited by 597
A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
Fang, K., Uhan, N., Zhao, F., & Sutherland, J. W. (2011) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2011.08.004 · Cited by 552
Palmer, D. S. (1965) · Journal of the Operational Research Society · doi:10.1057/jors.1965.8 · Cited by 547
Cited by
Ren, S., Zhang, Y., Liu, Y., Sakao, T., Huisingh, D., & Almeida, C. M. V. B. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.11.025 · Cited by 525
Energy-efficient scheduling in manufacturing companies: A review and research framework
Gahm, C., Denz, F., Dirr, M., & Tuma, A. (2016) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.07.017 · Cited by 474
Zhang, R., & Chiong, R. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.09.097 · Cited by 344
Li, J.-Q., Sang, H.-Y., Han, Y.-Y., Wang, C.-G., & Gao, K.-Z. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.004 · Cited by 295
Lu, C., Gao, L., Li, X., Pan, Q., & Wang, Q. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.01.011 · Cited by 292
Self-citationGreen scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption
Mansouri, S. A., Aktas, E., & Besikci, U. (2016) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.08.064 · Cited by 289
A Knowledge-Based Cooperative Algorithm for Energy-Efficient Scheduling of Distributed Flow-Shop
Wang, J.-J., & Wang, L. (2020) · IEEE Transactions on Systems, Man, and Cybernetics: Systems · doi:10.1109/tsmc.2017.2788879 · Cited by 279
Carbon-efficient scheduling of flow shops by multi-objective optimization
Ding, J.-Y., Song, S., & Wu, C. (2016) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.05.019 · Cited by 264
Ding, J.-Y., Song, S., Zhang, R., Chiong, R., & Wu, C. (2016) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2015.2495328 · Cited by 195
“The column generation heuristic is also extended to solve a multi-objective scheduling problem that aims to simultaneously minimize the makespan and TEC under TOU tariffs.”
MethodLei, D., Zheng, Y., & Guo, X. (2017) · International Journal of Production Research · doi:10.1080/00207543.2016.1262082 · Cited by 174
“Luo et al. (2013) provided an ant colony optimisation for hybrid flow shop scheduling with the consideration on electricity consumption cost.”
BackgroundLu, C., Gao, L., Pan, Q., Li, X., & Zheng, J. (2019) · Applied Soft Computing · doi:10.1016/j.asoc.2018.11.043 · Cited by 169
Self-citationIntegrating sustainability into production scheduling in hybrid flow-shop environments
Mokhtari-Moghadam, A., Pourhejazy, P., & Gupta, D. (2023) · Environmental Science and Pollution Research · doi:10.1007/s11356-023-26986-3 · Cited by 18
Bertolini, M., Leali, F., Mezzogori, D., & Renzi, C. (2023) · Sustainability · doi:10.3390/su15086884 · Cited by 2
Metadata
- Authors
- Luo, H., Du, B., Huang, G. Q., Chen, H., & Li, X.
- Venue
- International Journal of Production Economics
- Publisher
- Elsevier BV
- Published
- 2013-12
- Volume
- 146
- Issue
- 2
- Pages
- 423-439
- ISSN
- 0925-5273 (ISSN-L)
- OpenAlex
- W2139242502
- Cited by
- 381
- References
- 23
- FWCI
- 48.76
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.