Cited by 43Wind Energy Research and DevelopmentElectric Power System OptimizationIntegrated Energy Systems Optimization

A techno-economic and spatial analysis for the optimal planning of wind energy in Kythira island, Greece

Xydis, George·2013·International Journal of Production Economics

Integrity signals

Registry

Crossref · 10.1016/j.ijpe.2013.02.013

Cites

28 of 28 references verified0 citation errors · 0 not checkable

Statistics

Recomputing p-values needs the paper’s full text.

Claims the paper makes

We couldn’t retrieve this paper’s full text, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Cites

Flagged first, then by citations

3 of the 31 references couldn’t be matched to a known paper.

Cited by

Sorted by citations

Authors
Xydis, G.
Affiliations
Technical University of Denmark (DK)
Corresponding author
Xydis, George
Venue
International Journal of Production Economics
Publisher
Elsevier BV
Published
2013-12
Volume
146
Issue
2
Pages
440-452
ISSN
0925-5273 (ISSN-L)
OpenAlex
W2067151616
Cited by
43
References
31
Citations by year
2026: 1 · 2024: 2 · 2022: 3 · 2021: 3 · 2020: 8 · 2019: 4 · 2018: 3 · 2017: 5 · 2016: 7 · 2015: 4 · 2014: 1 · 2013: 1
FWCI
6.60
Type
journal article
Language
en
Open access
closed
Locations
  • International Journal of Production Economics (publishedVersion)
  • RePEc: Research Papers in Economics (submittedVersion)
  • Technical University of Denmark, DTU Orbit (Technical University of Denmark, DTU) (submittedVersion)
Topics
  • Physical Sciences › Engineering › Aerospace Engineering › Wind Energy Research and Development
  • Physical Sciences › Engineering › Electrical and Electronic Engineering › Electric Power System Optimization
  • Physical Sciences › Engineering › Electrical and Electronic Engineering › Integrated Energy Systems Optimization
Keywords
wind energy, wind farm siting, techno-economic analysis, renewable energy planning, investment cost optimization, energy security, environmental constraints, green development, government subsidies, spatial analysis

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review