Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework
The DOI matches its Crossref record; 41 of the 41 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1984) · Cited by 81,983
Case study research: design and methods
Phelan, S. (2011) · Evaluation & Research in Education · doi:10.1080/09500790.2011.582317 · Cited by 21,763
Hartley, J. (2004) · Essential Guide to Qualitative Methods in Organizational Research · doi:10.4135/9781446280119.n26 · Cited by 15,461
Five misunderstandings about case-study research
Flyvbjerg, B. (2006) · Qualitative Inquiry · doi:10.1177/1077800405284363 · Cited by 14,266
An introduction to cybernetics
Ashby, W. R. (1956) · doi:10.5962/bhl.title.5851 · Cited by 7,578
Megaprojects and Risk: An Anatomy of Ambition
Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003) · Cambridge University Press eBooks · doi:10.1017/cbo9781107050891 · Cited by 2,415
The concept of project complexity—a review
Baccarini, D. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00093-3 · Cited by 1,192
Weaver, W. (1991) · Facets of Systems Science · doi:10.1007/978-1-4899-0718-9_30 · Cited by 985
The need for new paradigms for complex projects
Williams, T. M. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00047-7 · Cited by 930
One Size Does Not Fit All Projects: Exploring Classical Contingency Domains
Shenhar, A. J. (2001) · Management Science · doi:10.1287/mnsc.47.3.394.9772 · Cited by 821
Cited by
Qazi, A., Quigley, J., Dickson, A., & Kirytopoulos, K. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.05.008 · Cited by 294
Clarifying the project complexity construct: Past, present and future
Bakhshi, J., Ireland, V., & Gorod, A. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.002 · Cited by 293
Social responsibility of major infrastructure projects in China
Zeng, S. X., Ma, H. Y., Lin, H., Zeng, R. C., & Tam, V. W. Y. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.07.007 · Cited by 251
“In general, infrastructure complexity consists of technical complexity, organizational complexity and environmental complexity (Bosch-Rekveldt et al., 2011).”
BackgroundHe, Q., Luo, L., Hu, Y., & Chan, A. P. C. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.07.009 · Cited by 243
“…complexity in managing projects, such as diversity of technology in project, dependence of technological processes, interaction between the technology system and the external environment, and risk of highly difficult technology (Baccarini, 1996; Bosch-Rekveldt et al., 2011; Maylor, 2003).”
BackgroundManaging Structural and Dynamic Complexity: A Tale of Two Projects
Brady, T., & Davies, A. (2014) · Project Management Journal · doi:10.1002/pmj.21434 · Cited by 236
Factors associated with the software development agility of successful projects
Sheffield, J., & Lemétayer, J. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.09.011 · Cited by 222
“Bosch-Rekveldt et al. (2011) and Fortune andWhite (2006) argue that the critical success factors research approach is facilitated when the factors are clustered by the imposition of a conceptual model.”
BackgroundLuo, L., He, Q., Xie, J., Yang, D., & Wu, G. (2017) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000471 · Cited by 215
Project complexity and team-level absorptive capacity as drivers of project management performance
Bjorvatn, T., & Wald, A. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2018.05.003 · Cited by 206
Analysing the organizational factors of project complexity using structural equation modelling
Qureshi, S. M., & Kang, C. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.04.006 · Cited by 189
Giezen, M. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.01.010 · Cited by 188
“The reason for doing so is that with the reduction of complexity comes a reduction of uncertainty as complexity is often defined in relation to uncertainty (Antoniadis et al., 2011; Bosch-Rekveldt et al., 2011).”
BackgroundSix decades of project management research: Thematic trends and future opportunities
Padalkar, M., & Gopinath, S. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.006 · Cited by 182
Complexity, uncertainty-reduction strategies, and project performance
Floricel, S., Michela, J. L., & Piperca, S. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.11.007 · Cited by 169
“Then, based on the practical literature on project complexity (Bosch-Rekveldt et al. 2011) we relate these dimensions to concrete project aspects, such as technology and organization, as well as market and regulatory environments.”
BackgroundHow do contract types and incentives matter to project performance?
Suprapto, M., Bakker, H. L. M., Mooi, H. G., & Hertogh, M. J. C. M. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.08.003 · Cited by 160
“The first three control variables are also considered as the proxy to characterize the complexity factors (Bosch-Rekveldt et al., 2011).”
BackgroundSelf-citationLu, Y., Luo, L., Wang, H., Le, Y., & Shi, Q. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.12.005 · Cited by 158
The front-end of projects: a systematic literature review and structuring
Williams, T., Vo, H., Samset, K., & Edkins, A. (2019) · Production Planning & Control · doi:10.1080/09537287.2019.1594429 · Cited by 145
Metadata
- Authors
- Bosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2011-08
- Volume
- 29
- Issue
- 6
- Pages
- 728-739
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2010571561
- Cited by
- 471
- References
- 41
- FWCI
- 16.13
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.