Investigating the Relationship between Project Complexity and Success in Complex Construction Projects
The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Abstract
Although widely recognized both in literature and among practitioners, project complexity may cause poor project success, with little empirical evidence supporting this contention. Therefore, this study analyzed, for the first time, the relationship between project complexity and success in complex construction projects and investigated how project complexity affects project success. First, project complexity is hypothesized to be negatively related to project success. Second, on the basis of literature review and expert interviews, a total of 245 questionnaire surveys on project complexity and project outcomes were collected in China. Project complexity was measured as information, task, technological, organizational, environmental, and goal complexities by correlation and factor analyses. Finally, the structural-equation modeling technique was used to test the hypothesis and explore the effect of different complexities on project success. The findings of this study support the hypothesized negative relationship between the complexity and success of complex construction projects. Furthermore, information complexity and goal complexity have significant negative effects on project success. The research would have significant theoretical and practical significance for improving the theory of complex project management and achieving project success in complex construction projects for project managers.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Atkinson, R. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00069-6 · Cited by 2,359
Is More Ever Too Much? The Number of Indicators per Factor in Confirmatory Factor Analysis
Marsh, H. W., Hau, K.-T., Balla, J. R., & Grayson, D. (1998) · Multivariate Behavioral Research · doi:10.1207/s15327906mbr3302_1 · Cited by 1,307
A Retrospective look at our Evolving Understanding of Project Success
Jugdev, K., & Müller, R. (2005) · Project Management Journal · doi:10.1177/875697280503600403 · Cited by 907
Cited by
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
Wu, G., Liu, C., Zhao, X., & Zuo, J. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.08.006 · Cited by 289
Self-citationDenicol, J., Davies, A., & Krystallis, I. (2020) · Project Management Journal · doi:10.1177/8756972819896113 · Cited by 266
Metadata
- Authors
- Luo, L., He, Q., Xie, J., Yang, D., & Wu, G.
- Venue
- Journal of Management in Engineering
- Published
- 2017-03
- Volume
- 33
- Issue
- 2
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- OpenAlex
- W2478628832
- Cited by
- 215
- References
- 3
- FWCI
- 13.87
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Investigating the Relationship between Project Complexity and Success in Complex Construction Projects. https://app.cochat.ai/papers/10.1061/(asce)me.1943-5479.0000471
- The paper
- Luo, L., He, Q., Xie, J., Yang, D., & Wu, G. (2017). Investigating the Relationship between Project Complexity and Success in Complex Construction Projects. Journal of Management in Engineering. https://doi.org/10.1061/(asce)me.1943-5479.0000471
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.