The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Predicting construction cost and schedule success using artificial neural networks ensemble and support vector machines classification models
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A decision-theoretic generalization of on-line learning and an application to boosting
Freund, Y., & Schapire, R. E. (1997) · Journal of Computer and System Sciences · doi:10.1006/jcss.1997.1504 · Cited by 20,466
Ensembling neural networks: Many could be better than all
Zhou, Z.-H., Wu, J., & Tang, W. (2002) · Artificial Intelligence · doi:10.1016/s0004-3702(02)00190-x · Cited by 1,964 · cited 2×
“, 1996), non-linear modeling (Franke and Neumann, 2000; Zhang, 1999), regression and classification (Kleinbaum et al., 2002; Zhou et al., 2002).”
Method
Cited by
Deep learning in the construction industry: A review of present status and future innovations
Akinosho, T. D., Oyedele, L. O., Bilal, M., Ajayi, A. O., Delgado, M. D., Akinade, O. O., & Ahmed, A. A. (2020) · Journal of Building Engineering · doi:10.1016/j.jobe.2020.101827 · Cited by 537
GPT models in construction industry: Opportunities, limitations, and a use case validation
Saka, A., Taiwo, R., Saka, N., Salami, B. A., Ajayi, S., Akande, K., & Kazemi, H. (2024) · Developments in the Built Environment · doi:10.1016/j.dibe.2023.100300 · Cited by 202
“The construction industry is notorious for cost overruns and budget deviations, which have demonstrated significant financial implications and led to project delays (Wang et al., 2012).”
Background
Metadata
- Authors
- Wang, Y.-R., Yu, C.-Y., & Chan, H.-H.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2012-05
- Volume
- 30
- Issue
- 4
- Pages
- 470-478
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2057373637
- Cited by
- 179
- References
- 2
- FWCI
- 2.17
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.