The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
A new approach for project control under uncertainty. Going back to the basics
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
Aleatoric risk uncertainty can be modelled using a probability distribution function (PDF), exactly as when modelling activity uncertainty.
“This aleatoric risk uncertainty can be modelled using a probability distribution function (PDF), exactly as we do when modelling activity uncertainty (Acebes et al. 2015(Acebes et al. , 2014)).”
From Beyond probability-impact matrices in project risk management: A quantitative methodology for risk prioritisation (2024) · cites this paper as Acebes et al. 2014
Citations
Cites
Measuring uncertainty and criticality in network planning by PERT-path technique
Mummolo, G. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00088-9 · Cited by 26
Flagged first, then by citations
Research works printed but not linked: 42
- Abba, 2010, Integrating technical performance measurement with earned value management, Meas. News, 4, 6
- Acebes, 2013, Beyond earned value management: a graphical framework for integrated cost, schedule and risk monitoring, Proc. Soc. Behav. Sci., 74, 181, 10.1016/j.sbspro.2013.03.027 · DOI
- Aliverdi, 2013, Monitoring project duration and cost in a construction project by applying statistical quality control charts, Int. J. Proj. Manag., 31, 411, 10.1016/j.ijproman.2012.08.005 · DOI
- Al-Jibouri, 2003, Monitoring systems and their effectiveness for project cost control in construction, Int. J. Proj. Manag., 21, 145, 10.1016/S0263-7863(02)00010-8 · DOI
- Anbari, 2003, Earned value project management method and extensions, Proj. Manag. J., 34, 12, 10.1177/875697280303400403 · DOI
- Barraza, 2007, Probabilistic control of project performance using control limit curves, J. Constr. Eng. Manag., 133, 957, 10.1061/(ASCE)0733-9364(2007)133:12(957) · DOI
- Barraza, 2004, Probabilistic forecasting of project performance using stochastic S curves, J. Constr. Eng. Manag., 130, 25, 10.1061/(ASCE)0733-9364(2004)130:1(25) · DOI
- Blanco, 2013, Earned value management: a predictive analysis tool, Nav. Supply Corps Newsl., 66, 24
- Chen, 2012, An analytic review of earned value management studies in the construction industry, 236
- Cioffi, 2006, Designing project management: a scientific notation and an improved formalism for earned value calculations, Int. J. Proj. Manag., 24, 136, 10.1016/j.ijproman.2005.07.003 · DOI
- Fazar, 1959, Program evaluation and review technique, Am. Stat., 13, 10
- Gowan, 2006, Earned value management in a data warehouse project, Inf. Manage. Comput. Secur., 14, 37, 10.1108/09685220610648364 · DOI
- Hanna, 2012, Using the earned value management system to improve electrical project control, J. Constr. Eng. Manag., 138, 449, 10.1061/(ASCE)CO.1943-7862.0000426 · DOI
- Hazir, 2011, Effects of the information presentation format on project control, J. Oper. Res. Soc., 62, 2157, 10.1057/jors.2011.11 · DOI
- Henderson, 2003, Earned schedule: a breakthrough extension to earned value theory? A retrospective analysis of real project data, The Measurable News, 1
- Henderson, 2004, Further developments in earned schedule, Meas. News, 15–22
- Jacob, 2003, Forecasting project schedule completion with earned value metrics, Meas. News, 7–9
- Jacob, 2004, Forecasting schedule completion using earned value metrics revisited, Meas. News, 11–17
- Kelley, 1961, Critical path planning and scheduling: mathematical basis, Oper. Res., 9, 296, 10.1287/opre.9.3.296 · DOI
- Kelley, 1989, The origins of CPM: a personal history, Proj. Manag. Netw., 3, 7
- Kim, 2003, A model for effective implementation of earned value management methodology, Int. J. Proj. Manag., 21, 375, 10.1016/S0263-7863(02)00049-2 · DOI
- Klingel, 1966, Bias in pert project completion time calculations for a real network, Manag. Sci., 13, B194, 10.1287/mnsc.13.4.B194 · DOI
- Kwak, 2012, History, practices, and future of earned value management in government: perspectives from NASA, Proj. Manag. J., 43, 77, 10.1002/pmj.20272 · DOI
- Lambrechts, 2008, Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities, J. Sched., 11, 121, 10.1007/s10951-007-0021-0 · DOI
- Leu, 2008, Project performance evaluation based on statistical process control techniques, J. Constr. Eng. Manag., 134, 813, 10.1061/(ASCE)0733-9364(2008)134:10(813) · DOI
- Lipke, 1999, Applying management reserve to software project management, J. Def. Softw. Eng., 17–21
- Lipke, 2003, Schedule is different, Meas. News, 3, 31
- Lipke, 2004, Connecting earned value to the schedule, Meas. News, 1, 6
- Lipke, 2004, The probability of success, J. Qual. Assur. Inst., 14–21
- MacCrimmon, 1964, An analytical study of the PERT assumptions, Oper. Res., 12, 16, 10.1287/opre.12.1.16 · DOI
- Malcolm, 1959, Application of a technique for research and development program evaluation, Oper. Res., 7, 646, 10.1287/opre.7.5.646 · DOI
- McKim, 2000, Project performance control in reconstruction projects, J. Constr. Eng. Manag., 126, 137, 10.1061/(ASCE)0733-9364(2000)126:2(137) · DOI
- Naderpour, 2011, Improving construction management of an educational center by applying earned value technique, Proc. Eng., 14, 1945, 10.1016/j.proeng.2011.07.244 · DOI
- Naeni, 2011, A fuzzy approach for the earned value management, Int. J. Proj. Manag., 29, 764, 10.1016/j.ijproman.2010.07.012 · DOI
- Navon, 2005, Automated project performance control of construction projects, Autom. Constr., 14, 467, 10.1016/j.autcon.2004.09.006 · DOI
- Pajares, 2011, An extension of the EVM analysis for project monitoring: the cost control index and the schedule control index, Int. J. Proj. Manag., 29, 615, 10.1016/j.ijproman.2010.04.005 · DOI
- Pontrandolfo, 2000, Project duration in stochastic networks by the PERT-path technique, Int. J. Proj. Manag., 18, 215, 10.1016/S0263-7863(99)00015-0 · DOI
- Schonberger, 1981, Why projects are “always” late: a rationale based on manual simulation of a PERT/CPM network, Interfaces, 11, 66, 10.1287/inte.11.5.66 · DOI
- Vanhoucke, 2011, On the dynamic use of project performance and schedule risk information during project tracking, Omega, 39, 416, 10.1016/j.omega.2010.09.006 · DOI
- Vanhoucke, 2012, Measuring the efficiency of project control using fictitious and empirical project data, Int. J. Proj. Manag., 30, 252, 10.1016/j.ijproman.2011.05.006 · DOI
- Vanhoucke, 2007, A simulation and evaluation of earned value metrics to forecast the project duration, J. Oper. Res. Soc., 58, 1361, 10.1057/palgrave.jors.2602296 · DOI
- Warburton, 2011, A time-dependent earned value model for software projects, Int. J. Proj. Manag., 29, 1082, 10.1016/j.ijproman.2011.02.008 · DOI
Cited by
Sorted by citations
Acebes, F., González-Varona, J. M., López-Paredes, A., & Pajares, J. (2024) · Humanities and Social Sciences Communications · doi:10.1057/s41599-024-03180-5 · Cited by 74
Self-citation
Metadata
- Authors
- Acebes, F., Pajares, J., Galán, J. M., & López-Paredes, A.
- Affiliations
- Universidad de Valladolid (ES)
- Universidad de Burgos (ES)
- Corresponding author
- Pajares, Javier
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2014-04
- Volume
- 32
- Issue
- 3
- Pages
- 423-434
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2033098432
- Cited by
- 165
- References
- 1
- Citations by year
- 2026: 12 · 2025: 14 · 2024: 10 · 2023: 6 · 2022: 7 · 2021: 18 · 2020: 21 · 2019: 13 · 2018: 15 · 2017: 15 · 2016: 15 · 2015: 14 · 2014: 5
- FWCI
- 14.91
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- International Journal of Project Management (publishedVersion)
- University of Valladolid Documentary Repository (University of Valladolid) (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Decision Sciences › Management Science and Operations Research › Resource-Constrained Project Scheduling
- Social Sciences › Economics, Econometrics and Finance › Finance › Capital Investment and Risk Analysis
- Keywords
- earned value management, project risk analysis, project simulation, activity variability, PERT
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review