BIM-based deconstruction tool: Towards essential functionalities
Open accessThe DOI matches its Crossref record; 6 of the 6 references it cites were found in a registry or an index.
Abstract
This study discusses the future directions of effective Design for Deconstruction (DfD) using BIM-based approach to design coordination. After a review of extant literatures on existing DfD practices and tools, it became evident that none of the tools is BIM compliant and that BIM implementation has been ignored for end-of-life activities. To understand how BIM could be employed for DfD and to identify essential functionalities for a BIM-based deconstruction tool, Focus Group Interviews (FGIs) were conducted with professionals who have utilised BIM on their projects. The interview transcripts of the FGIs were analysed using descriptive interpretive analysis to identify common themes based on the experiences of the participants. The themes highlight functionalities of BIM in driving effective DfD process, which include improved collaboration among stakeholders, visualisation of deconstruction process, identification of recoverable materials, deconstruction plan development, performance analysis and simulation of end-of-life alternatives, improved building lifecycle management, and interoperability with existing BIM software. The results provide the needed technological support for developing tools for BIM compliant DfD tools.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Qualitative Inquiry and Research Design: Choosing Among Five Approaches
Lewis, S. (2015) · Health Promotion Practice · doi:10.1177/1524839915580941 · Cited by 22,105
Phenomenological research methods
Moustakas, C. (1994) · doi:10.4135/9781412995658 · Cited by 13,919
Phenomenological Research Methods
Polkinghorne, D. E. (1989) · Existential-Phenomenological Perspectives in Psychology · doi:10.1007/978-1-4615-6989-3_3 · Cited by 1,800 · cited 1×
“Accordingly, 20 professionals were selected based on 167 suggestion of Polkinghorne (1989) who recommended that FGI participants should not exceed 25.”
BackgroundLife cycle design and prefabrication in buildings: A review and case studies in Hong Kong
Jaillon, L., & Poon, C. S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.09.006 · Cited by 305 · cited 1×
“This is because building relocation and components reuse requires minimal energy 75 compared to recycling and remanufacturing (Jaillon and Poon, 2014).”
BackgroundWaste minimisation through deconstruction: A BIM based Deconstructability Assessment Score (BIM-DAS)
Akinade, O. O., Oyedele, L. O., Bilal, M., Ajayi, S. O., Owolabi, H. A., Alaka, H. A., & Bello, S. A. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.10.018 · Cited by 272 · cited 6×
“Although several studies suggest that BIM has the potentials for 117 end-of-life waste minimisation but no clear instructions has been provided on achieving this 118 (Akinade et al., 2015).”
BackgroundMethodInfluentialSelf-citationDesign for deconstruction and material reuse
Tingley, D. D., & Davison, B. (2011) · Proceedings of the Institution of Civil Engineers - Energy · doi:10.1680/ener.2011.164.4.195 · Cited by 142 · cited 1×
“…believe BIM could be used to 315 prepare the deconstruction plans and end-of-life audit reports at varying level 316 of details” 317 In support of the above excerpts, Davison and Tingley (2011) argue that the development of a 318 deconstruction plan is an important requirement for a successful DfD.”
Cited by
Disassembly and deconstruction analytics system (D-DAS) for construction in a circular economy
Akanbi, L. A., Oyedele, L. O., Omoteso, K., Bilal, M., Akinade, O. O., Ajayi, A. O., Davila Delgado, J. M., & Owolabi, H. A. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.03.172 · Cited by 270
Self-citationBIM-Based End-of-Lifecycle Decision Making and Digital Deconstruction: Literature Review
Akbarieh, A., Jayasinghe, L. B., Waldmann, D., & Teferle, F. N. (2020) · Sustainability · doi:10.3390/su12072670 · Cited by 183
“No IFC classes for DfD or deconstruction exist, which necessitates the development of IFC classes to support EoL scenarios and DfD [103].”
BackgroundInfluentialGuerra, B. C., Leite, F., & Faust, K. M. (2020) · Waste Management · doi:10.1016/j.wasman.2020.07.035 · Cited by 177
Barriers and Enablers to Circular Building Design in the US: An Empirical Study
Cruz Rios, F., Grau, D., & Bilec, M. (2021) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002109 · Cited by 143
Design for Deconstruction in the Design Process: State of the Art
Kanters, J. (2018) · Buildings · doi:10.3390/buildings8110150 · Cited by 127
“[26] assessed existing DfD tools and identified essential functionalities of a BIM-based tool for DfD.”
Method
Metadata
- Authors
- Akinade, O. O., Oyedele, L. O., Omoteso, K., Ajayi, S. O., Bilal, M., Owolabi, H. A., Alaka, H. A., Ayris, L., & Henry Looney, J.
- Venue
- International Journal of Sustainable Built Environment
- Publisher
- Elsevier BV
- Published
- 2017-06
- Volume
- 6
- Issue
- 1
- Pages
- 260-271
- ISSN
- 2212-6090 (ISSN-L)
- OpenAlex
- W2581319833
- Cited by
- 103
- References
- 6
- FWCI
- 10.80
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: BIM-based deconstruction tool: Towards essential functionalities. https://app.cochat.ai/papers/10.1016/j.ijsbe.2017.01.002
- The paper
- Akinade, O. O., Oyedele, L. O., Omoteso, K., Ajayi, S. O., Bilal, M., Owolabi, H. A., Alaka, H. A., Ayris, L., & Henry Looney, J. (2017). BIM-based deconstruction tool: Towards essential functionalities. International Journal of Sustainable Built Environment. https://doi.org/10.1016/j.ijsbe.2017.01.002
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.