A holistic review of off-site construction literature published between 2008 and 2018

Jin, Ruoyu, Gao, Shang, Cheshmehzangi, Ali, Aboagye-Nimo, Emmanuel·2018·Journal of Cleaner Production

Overview

Integrity signals

Registry

Crossref · 10.1016/j.jclepro.2018.08.195

Cites

1 of 1 references verified0 citation errors · 0 not checkable

Statistics

Recomputing p-values needs the paper’s full text.

Verification

Claims the paper makes

We couldn’t retrieve this paper’s full text, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Citations

Cites

Flagged first, then by citations

Research works printed but not linked: 108

  1. Abanda, 2017, BIM in off-site manufacturing for buildings, J. Build. Eng., 14, 89
  2. AghaeiChadegani, 2013, A comparison between two main academic literature collections: Web of science and scopus databases, Asian Soc. Sci., 9, 18
  3. Alshawi, 2012, Sustaining inertia?:Construction clients' decision making and information processing approach to industrialized building innovations, Construct. Innovat., 12, 393, 10.1108/14714171211272180 · DOI
  4. Altaf, 2018, Integrated production planning and control system for a panelized home prefabrication facility using simulation and RFID, Autom. Construct., 85, 369, 10.1016/j.autcon.2017.09.009 · DOI
  5. Arashpour, 2016, Off-site construction optimization: sequencing multiple job classes with time constraints, Autom. Construct., 71, 262, 10.1016/j.autcon.2016.08.001 · DOI
  6. Arif, 2010, Making a case for offsite construction in China, ECAM, 17, 536, 10.1108/09699981011090170 · DOI
  7. Azman, 2012, The selection of IBS precast manufacturing plant in Malaysia using GIS, Malaysian Construct. Res. J., 10, 77
  8. Babič, 2010, Integrating resource production and construction using BIM, Autom. ConStruct., 19, 539, 10.1016/j.autcon.2009.11.005 · DOI
  9. Bansal, 2017, Fuzzy decision approach for selection of most suitable construction method of Green Buildings, Int. J. Sustain. Built Environ., 6, 122, 10.1016/j.ijsbe.2017.02.005 · DOI
  10. Becerra-Santacruz, 2016, Evaluation of the thermal performance of an industrialised housing construction system in a warm-temperate climate: Morelia, Mexico, Build. Environ., 107, 135, 10.1016/j.buildenv.2016.07.029 · DOI
  11. Butler, 2006, Extending citation analysis to non-source items, Scientometrics, 66, 327, 10.1007/s11192-006-0024-1 · DOI
  12. Cao, 2015, A comparative study of environmental performance between prefabricated and traditional residential buildings in China, J. Clean. Prod., 109, 131, 10.1016/j.jclepro.2015.04.120 · DOI
  13. Cavaco, 2018, Detailing of concrete-to-concrete interfaces for improved ductility, Eng. Struct., 156, 210, 10.1016/j.engstruct.2017.10.058 · DOI
  14. Chen, 2017, Optimizing profit and logistics for precast concrete production, Can. J. Civ. Eng., 44, 393, 10.1139/cjce-2016-0401 · DOI
  15. Choi, 2016, Recipes for cost and schedule successes in industrial modular projects: qualitative comparative analysis, J. Construct. Eng. Manag., 142
  16. Court, 2009, Modular assembly with postponement to improve health, safety, and productivity in construction, Pract. Period. Struct. Des. Construct., 14, 81, 10.1061/(ASCE)1084-0680(2009)14:2(81) · DOI
  17. de la Sota, 2017, Intercomparison of methods to estimate black carbon emissions from cookstoves, Sci. Total Environ., 595, 886, 10.1016/j.scitotenv.2017.03.247 · DOI
  18. Eastman, 2011, vol. 1
  19. Erdil, 2018, Embedding sustainability in lean six sigma efforts, J. Clean. Prod., 198, 520, 10.1016/j.jclepro.2018.07.048 · DOI
  20. Fan, 2017, Modular construction, structures, and magnetic properties of two manganese coordination polymers based on 3,5-Bis(2–carboxylphenoxy)benzoic acid, Zeitschrift fur Anorganische und AllgemeineChemie, 643, 2138, 10.1002/zaac.201700325 · DOI
  21. Fard, 2017, Safety concerns related to modular/prefabricated building construction, Int. J. Inj. Contr. Saf. Promot., 24, 10, 10.1080/17457300.2015.1047865 · DOI
  22. Fathieh, 2016, Seismic evaluation of modular steel buildings, Eng. Struct., 122, S83, 10.1016/j.engstruct.2016.04.054 · DOI
  23. Fitriaty, 2018, Predicting energy generation from residential building attached Photovoltaic Cells in a tropical area using 3D modeling analysis, J. Clean. Prod., 195, 1422, 10.1016/j.jclepro.2018.02.133 · DOI
  24. Gasparri, 2015, Construction management for tall CLT buildings: from partial to total prefabrication of façade elements, Wood Mater. Sci. Eng., 10, 256, 10.1080/17480272.2015.1075589 · DOI
  25. Gledson, 2016, Hybrid project delivery processes observed in constructor BIM innovation adoption, Construct. Innovat., 16, 229, 10.1108/CI-04-2015-0020 · DOI
  26. Goulding, 2015, New offsite production and business models in construction: priorities for the future research agenda, Architect. Eng. Des. Manag., 11, 163
  27. Hammersley, 2001, On ‘systematic’ reviews of research literature: a ‘narrative’ response to Evans &Bene field, Br. Educ. Res. J., 27, 543, 10.1080/01411920120095726 · DOI
  28. He, 2017, Mapping the managerial areas of Building Information Modeling (BIM) using scientometric analysis, Int. J. Proj. Manag., 35, 670, 10.1016/j.ijproman.2016.08.001 · DOI
  29. Hedgren, 2014, The impact of clients' decision-making on their adoption of industrialized building, Construct. Manag. Econ., 32, 126, 10.1080/01446193.2013.833340 · DOI
  30. Hong, 2018, Barriers to promoting prefabricated construction in China: a cost–benefit analysis, J. Clean. Prod., 172, 649, 10.1016/j.jclepro.2017.10.171 · DOI
  31. Hong, 2016, Life-cycle energy analysis of prefabricated building components: an input-output-based hybrid model, J. Clean. Prod., 112, 2198, 10.1016/j.jclepro.2015.10.030 · DOI
  32. Hosseini, 2018, Critical evaluation of off-site construction research: a Scientometric analysis, Autom. ConStruct., 87, 235, 10.1016/j.autcon.2017.12.002 · DOI
  33. Howard, 1987, Research productivity in psychology based on publication in the journals of the american psychological association, Am. Psychol., 42, 975, 10.1037/0003-066X.42.11.975 · DOI
  34. Hwang, 2018, Key constraints and mitigation strategies for prefabricated prefinished volumetric construction, J. Clean. Prod., 183, 183, 10.1016/j.jclepro.2018.02.136 · DOI
  35. Isaac, 2016, A methodology for the optimal modularization of building design, Autom. ConStruct., 65, 116, 10.1016/j.autcon.2015.12.017 · DOI
  36. Ismail, 2016, A case study of maintenance management systems in Malaysian complex and high-rise industrialized building system buildings, Int. J. Econ. Financ. Issues, 6, 28
  37. Jaillon, 2009, The evolution of prefabricated residential building systems in Hong Kong: a review of the public and the private sector, Autom. Construct., 18, 239, 10.1016/j.autcon.2008.09.002 · DOI
  38. Jeong, 2017, An integrated evaluation of productivity, cost and CO2 emission between prefabricated and conventional columns, J. Clean. Prod., 142, 2393, 10.1016/j.jclepro.2016.11.035 · DOI
  39. Jeong, 2016, A fundamental study on the modularization of intelligent skin design, Int. J. Smart Home, 10, 15, 10.14257/ijsh.2016.10.12.02 · DOI
  40. Ji, 2013, Green modular design for material efficiency: a leader-follower joint optimization model, J. Clean. Prod., 41, 187, 10.1016/j.jclepro.2012.09.022 · DOI
  41. Ji, 2017, Construction industrialization in China: current profile and the prediction, Appl. Sci., 7, 10.3390/app7020180 · DOI
  42. Ji, 2018, Comparing greenhouse gas emissions of precast in-situ and conventional construction methods, J. Clean. Prod., 124, 10.1016/j.jclepro.2016.07.143 · DOI
  43. Jiang, 2018, A SWOT analysis for promoting off-site construction under the backdrop of China's new urbanisation, J. Clean. Prod., 173, 225, 10.1016/j.jclepro.2017.06.147 · DOI
  44. Jin, 2017, BIM investment, returns, and risks in China's AEC industries, J. Construct. Eng. Manag., 143
  45. Jonsson, 2017, KPIs for measuring performance of production systems for residential building: a production strategy perspective, Construct. Innovat., 17, 381, 10.1108/CI-06-2016-0034 · DOI
  46. Kamali, 2016, Life cycle performance of modular buildings: a critical review, Renew. Sustain. Energy Rev., 62, 1171, 10.1016/j.rser.2016.05.031 · DOI
  47. Kamali, 2017, Development of performance criteria for sustainability evaluation of modular versus conventional construction methods, J. Clean. Prod., 142, 3592, 10.1016/j.jclepro.2016.10.108 · DOI
  48. Kamar, 2014, IBS survey 2010: drivers, barriers and critical success factors in adopting industrialised building system (IBS) construction by G7 contractors in Malaysia, J. Eng. Sci. Technol., 9, 490
  49. Kong, 2017, Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates, Autom. ConStruct., 81, 34, 10.1016/j.autcon.2017.03.016 · DOI
  50. Kothari, 2017, Behaviour of the precast portal frames under lateral loading, Asian J. Civ. Eng., 18, 1059
  51. Laing, 2013, The future of DfMA is the future of construction, Eng. Excel. J., 77
  52. Lee, 2017, BIM-Based 4D simulation to improve module manufacturing productivity for sustainable building projects, Sustainability, 9, 10.3390/su9030426 · DOI
  53. Lei, 2015, From autoCAD to 3ds max: an automated approach for animating heavy lifting studies, Can. J. Civ. Eng., 42, 190, 10.1139/cjce-2014-0313 · DOI
  54. Li, 2016, SWOT analysis and Internet of Things-enabled platform for prefabrication housing production in Hong Kong, Habitat Int., 57, 74, 10.1016/j.habitatint.2016.07.002 · DOI
  55. Li, 2011, Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong, Construct. Manag. Econ., 29, 233, 10.1080/01446193.2010.545994 · DOI
  56. Li, 2014, Critical review of the research on the management of prefabricated construction, Habitat Int., 43, 240, 10.1016/j.habitatint.2014.04.001 · DOI
  57. Li, 2018, An internet of things-enabled BIM platform for on-site assembly services in prefabricated construction, Autom. Constr., 89, 146, 10.1016/j.autcon.2018.01.001 · DOI
  58. Lu, 2013, Investigating waste reduction potential in the upstream processes of offshore prefabrication construction, Renew. Sustain. Energy Rev., 28, 804, 10.1016/j.rser.2013.08.048 · DOI
  59. Mao, 2015, Major barriers to off-site construction: the developer's perspective in China, J. Manag. Eng., 31
  60. Mao, 2013, Comparative study of greenhouse gas emissions between off-site prefabrication and conventional construction methods: two case studies of residential projects, Energy Build., 66, 165, 10.1016/j.enbuild.2013.07.033 · DOI
  61. Mao, 2016, Cost analysis for sustainable off-site construction based on a multiple-case study in China, Habitat Int., 57, 215, 10.1016/j.habitatint.2016.08.002 · DOI
  62. Medishetty, 2017, Multi-photon absorption in metal–organic frameworks, Angew. Chem. Int. Ed., 56, 14743, 10.1002/anie.201706492 · DOI
  63. Mitterhofer, 2017, An FMI-enabled methodology for modular building performance simulation based on Semantic Web Technologies, Build. Environ., 125, 49, 10.1016/j.buildenv.2017.08.021 · DOI
  64. Moghadasi, 2017, A study on rotational behaviour of a new industrialised building system connection, Steel Compos. Struct., 25, 245
  65. Mostafa, 2016, Lean and agile integration within offsite construction using discrete event simulation a systematic literature review, Construct. Innovat., 16, 483, 10.1108/CI-09-2014-0043 · DOI
  66. Nadim, 2010, Offsite production in the UK: the way forward? A UK construction industry perspective, Construct. Innovat., 10, 181, 10.1108/14714171011037183 · DOI
  67. Nahmens, 2012, Effects of lean construction on sustainability of modular homebuilding, J. Architect. Eng., 18, 155, 10.1061/(ASCE)AE.1943-5568.0000054 · DOI
  68. Nahmens, 2011, Lean homebuilding: lessons learned from a precast concrete panelizer, J. Architect. Eng., 17, 155, 10.1061/(ASCE)AE.1943-5568.0000037 · DOI
  69. Nawari, 2012, BIM standard in off-site construction, J. Architect. Eng., 18, 107, 10.1061/(ASCE)AE.1943-5568.0000056 · DOI
  70. Nawi, 2014, Improving integrated practice through building information modeling-integrated project delivery (BIM-IPD) for malaysian industrialised building system (IBS) construction projects, Malaysian Construct. Res. J., 15, 29
  71. Nawi, 2014, Fragmentation issue in Malaysian industrialised building system (IBS) projects, J. Eng. Sci. Technol., 9, 97
  72. Ng, 2016, Structural performance of precast floor panel using oil palm shell solid waste, J. Infrastruct. Syst., 22
  73. Nzabonimpa, 2017, Experimental investigation of dry mechanical beam–column joints for precast concrete based frames, Struct. Des. Tall Special Build., 26, 10.1002/tal.1302 · DOI
  74. Olearczyk, 2014, Evolution of the crane selection and on-site utilization process for modular construction multilifts, Autom. ConStruct., 43, 59, 10.1016/j.autcon.2014.03.015 · DOI
  75. Onyeizu, 2011, The utilisation of industrialised building system in design innovation in construction industry, World Appl. Sci. J., 15, 205
  76. Oraee, 2017, Collaboration in BIM-based construction networks, A bibliometric-qualitative literature review, Int. J. Proj. Manag., 35, 1288, 10.1016/j.ijproman.2017.07.001 · DOI
  77. Osman, 2015, "Readiness assessment for implementation of integrated project delivery (IPD) in industrialised building system (IBS) projects, JurnalTeknologi, 77, 91
  78. Osman, 2017, An integrated procurement system: a study of construction firm readiness towards implementing of integrated project delivery (IPD), Int. J. Supply Chain Manag., 6, 360
  79. Othman, 2016, A strategy towards team integration practice for improving the design and construction process in the Malaysian industrialized building system projects, Int. Rev. Manag. Market., 6, 226
  80. Pan, 2008, Leading UK housebuilders' utilization of offsite construction methods, Build. Res. Inf., 36, 56, 10.1080/09613210701204013 · DOI
  81. Pan, 2012, House-building business models and off-site construction take-up, J. Architect. Eng., 18, 84, 10.1061/(ASCE)AE.1943-5568.0000058 · DOI
  82. Pan, 2011, Demystifying the cost barriers to offsite construction in the UK, Construct. Manag. Econ., 29, 1081, 10.1080/01446193.2011.637938 · DOI
  83. Park, 2017, An experimental and analytical study on the deflection behavior of precast concrete beams with joints, Appl. Sci., 7, 10.3390/app7111198 · DOI
  84. Park, 2018, Comprehensive analysis of the relationship between thermal comfort and building control research - a data-driven literature review, Renew. Sustain. Energy Rev., 82, 2664, 10.1016/j.rser.2017.09.102 · DOI
  85. ParreiraJúnior, 2018, ObasCId(-Tool): an ontologically based approach for concern identification and classification and its computational support, J. Braz. Comput. Soc., 24
  86. Raghavan, 2017, Structural behaviour of conventional and precast panel joints, Int. J. Civ. Eng. Technol., 8, 156
  87. Ramaji, 2017, Product-oriented information delivery framework for multistory modular building projects, J. Comput. Civ. Eng., 31
  88. Shahtaheri, 2017, Managing risk in modular construction using dimensional and geometric tolerance strategies, Autom. ConStruct., 83, 303, 10.1016/j.autcon.2017.03.011 · DOI
  89. Shewchuk, 2012, Panel stacking, panel sequencing, and stack locating in residential construction: lean approach, J. Construct. Eng. Manag., 138, 1006, 10.1061/(ASCE)CO.1943-7862.0000520 · DOI
  90. Sonego, 2018, The role of modularity in sustainable design: a systematic review, J. Clean. Prod., 176, 196, 10.1016/j.jclepro.2017.12.106 · DOI · Paper page
  91. Song, 2016, A review of emerging trends in global PPP research, analysis and visualization, Scientometrics, 107, 1111, 10.1007/s11192-016-1918-1 · DOI
  92. Su, 2010, Mapping knowledge structure by keyword co-occurrence: a first look at journal papers in technology foresight, Scientometrics, 85, 65, 10.1007/s11192-010-0259-8 · DOI
  93. Sung, 2017, Experimental testing and numerical simulation of precast segmental bridge piers constructed with a modular methodology, J. Bridge Eng., 22
  94. Tam, 2015, Best practice of prefabrication implementation in the Hong Kong public and private sectors, J. Clean. Prod., 109, 216, 10.1016/j.jclepro.2014.09.045 · DOI
  95. Thuesen, 2011, Efficient on-site construction: learning points from a German platform for housing, Construct. Innovat., 11, 338, 10.1108/14714171111149043 · DOI
  96. Vaghei, 2017, Development of a new connection for precast concrete walls subjected to cyclic loading, Earthq. Eng. Eng. Vib., 16, 97, 10.1007/s11803-017-0371-3 · DOI
  97. Wang, 2016, Case study of integrated prefab accommodations system for migrant on-site construction workers in China, J. Prof. Iss. Eng. Ed. Pr., 142
  98. Wikberg, 2014, Design configuration with architectural objects: linking customer requirements with system capabilities in industrialized house-building platforms, Construct. Manag. Econ., 32, 196, 10.1080/01446193.2013.864780 · DOI
  99. Xie, 2018, Simulation of dynamic energy consumption in modular construction manufacturing processes, J. Architect. Eng., 24
  100. Yarlagadda, 2017, Efficient cost management of materials in conventional and precast construction, Int. J. Civ. Eng. Technol., 8, 307
  101. Yin, 2009, Developing a precast production management system using RFID technology, Autom.Construct., 18, 677, 10.1016/j.autcon.2009.02.004 · DOI
  102. Yu, 2013, Lean transformation in a modular building company: a case for implementation, J. Manag. Eng., 29, 103
  103. Yuan, 2018, Design for Manufacture and Assembly-oriented parametric design of prefabricated buildings, Autom. ConStruct., 88, 13, 10.1016/j.autcon.2017.12.021 · DOI
  104. Yunus, 2016, Legislative challenge to sustainable application of industrialized building system (IBS), JurnalTeknologi, 78, 45
  105. Zaini, 2016, A review of embodied energy (EM) analysis of Industrialised Building System (IBS), J. Mater. Environ. Sci., 7, 1357
  106. Zhai, 2014, Factors impeding the offsite production of housing construction in China: an investigation of current practice, Construct. Manag. Econ., 32, 40, 10.1080/01446193.2013.787491 · DOI
  107. Zhang, 2014, Exploring the challenges to industrialized residential building in China, Habitat Int., 41, 176, 10.1016/j.habitatint.2013.08.005 · DOI
  108. Zhao, 2017, A scientometric review of global BIM research, Analysis and visualization, Autom. ConStruct., 80, 37, 10.1016/j.autcon.2017.04.002 · DOI

Cited by

Sorted by citations

Metadata

Authors
Jin, R., Gao, S., Cheshmehzangi, A., & Aboagye-Nimo, E.
Venue
Journal of Cleaner Production
Publisher
Elsevier BV
Published
2018-11
Volume
202
Pages
1202-1219
ISSN
0959-6526
Cited by
363
References
1
Language
en

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review