CoChat

Environmental benefits of construction and demolition debris recycling: Evidence from an Indian case study using life cycle assessment

Ram, V.G., Kishore, Kumar C., Kalidindi, Satyanarayana N. · 2020 · Journal of Cleaner Production
Cited by 126

The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.jclepro.2020.120258

Cites

3 of 3 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 3 references

Research works printed but not linked: 28

  1. Blengini, 2009, Life cycle of buildings, demolition and recycling potential: a case study in Turin, Italy. Build. Environ., 44, 319, 10.1016/j.buildenv.2008.03.007 · DOI · Paper page
  2. Blengini, 2010, Resources and waste management in Turin (Italy): the role of recycled aggregates in the sustainable supply mix, J. Clean. Prod., 18, 1021, 10.1016/j.jclepro.2010.01.027 · DOI · Paper page
  3. Borghi, 2018, Life cycle assessment of non-hazardous construction and demolition waste (CDW) management in lombardy region (Italy), J. Clean. Prod., 184, 815, 10.1016/j.jclepro.2018.02.287 · DOI · Paper page
  4. Bovea, 2016, Developments in life cycle assessment applied to evaluate the environmental performance of construction and demolition wastes, Waste Manag., 50, 151, 10.1016/j.wasman.2016.01.036 · DOI · Paper page
  5. Coelho, 2013, Environmental analysis of a construction and demolition waste recycling plant in Portugal - Part I: energy consumption and CO2 emissions, Waste Manag., 33, 1258, 10.1016/j.wasman.2013.01.025 · DOI
  6. Duan, 2016, Construction and demolition waste management: China’s lessons, Waste Manag. Res., 34, 397, 10.1177/0734242X16647603 · DOI
  7. Ekvall, 2007, What life-cycle assessment does and does not do in assessments of waste management, Waste Manag., 27, 989, 10.1016/j.wasman.2007.02.015 · DOI · Paper page
  8. Faleschini, 2016, Sustainable management and supply of natural and recycled aggregates in a medium-size integrated plant, Waste Manag., 49, 146, 10.1016/j.wasman.2016.01.013 · DOI
  9. Ghanbari, 2018, Production of natural and recycled aggregates: the environmental impacts of energy consumption and CO2 emissions, J. Mater. Cycles Waste Manag., 20, 810, 10.1007/s10163-017-0640-2 · DOI
  10. Hossain, 2016, Comparative environmental evaluation of aggregate production from recycled waste materials and virgin sources by LCA, Resour. Conserv. Recycl., 109, 67, 10.1016/j.resconrec.2016.02.009 · DOI · Paper page
  11. Jain, 2018, Construction and demolition waste (C&DW) in India: generation rate and implications of C&DW recycling, Int. J. Constr. Manag.
  12. Jolliet, 2003, Impact 2002+: a new life cycle impact assessment methodology, Int. J. Life Cycle Assess., 8, 324, 10.1007/BF02978505 · DOI · Paper page
  13. Kucukvar, 2014, Evaluating environmental impacts of alternative construction waste management approaches using supply-chain-linked life-cycle analysis, Waste Manag. Res., 32, 502, 10.1177/0734242X14536457 · DOI
  14. Landfield, 2000, Life cycle assessment of a rock crusher, Resour. Conserv. Recycl. Recycl., 28, 207, 10.1016/S0921-3449(99)00045-2 · doi:10.1016/s0921-3449(99)00045-2
  15. Lu, 2016, Analysis of the construction waste management performance in Hong Kong: the public and private sectors compared using big data, J. Clean. Prod., 112, 521, 10.1016/j.jclepro.2015.06.106 · DOI
  16. Lu, 2013, Construction waste management policies and their effectiveness in Hong Kong: a longitudinal review, Renew. Sustain. Energy Rev., 23, 214, 10.1016/j.rser.2013.03.007 · DOI · Paper page
  17. Mah, 2018, Life cycle assessment and life cycle costing toward eco-efficiency concrete waste management in Malaysia, J. Clean. Prod., 172, 3415, 10.1016/j.jclepro.2017.11.200 · DOI
  18. Mercante, 2012, Life cycle assessment of construction and demolition waste management systems: a Spanish case study, Int. J. Life Cycle Assess., 17, 232, 10.1007/s11367-011-0350-2 · DOI · Paper page
  19. Ortiz, 2010, Environmental performance of construction waste: comparing three scenarios from a case study in Catalonia, Spain, Waste Manag., 30, 646, 10.1016/j.wasman.2009.11.013 · DOI · Paper page
  20. Penteado, 2016, Comparison of scenarios for the integrated management of construction and demolition waste by life cycle assessment : a case study in Brazil, Waste Manag. Res., 34, 1026, 10.1177/0734242X16657605 · DOI
  21. Peter, 2019, Environmental burden by an open dumpsite in urban India, Waste Manag., 85, 151, 10.1016/j.wasman.2018.12.022 · DOI
  22. Ram, 2017, Estimation of construction and demolition waste using waste generation rates in Chennai, India, Waste Manag. Res., 35, 610, 10.1177/0734242X17693297 · DOI
  23. Rees, 1999, The built environment and the ecosphere: a global perspective, Build. Res. Inf., 27, 206, 10.1080/096132199369336 · DOI
  24. Rosado, 2019, Life cycle assessment of construction and demolition waste management in a large area of São Paulo State, Brazil, Waste Manag., 85, 477, 10.1016/j.wasman.2019.01.011 · DOI · Paper page
  25. Rosado, 2017, Life cycle assessment of natural and mixed recycled aggregate production in Brazil, J. Clean. Prod., 151, 634, 10.1016/j.jclepro.2017.03.068 · DOI · Paper page
  26. Söderholm, 2011, Taxing virgin natural resources: lessons from aggregates taxation in Europe, Resour. Conserv. Recycl., 55, 911, 10.1016/j.resconrec.2011.05.011 · DOI · Paper page
  27. Vossberg, 2014, An energetic life cycle assessment of C&D waste and container glass recycling in Cape Town, South Africa, Resour. Conserv. Recycl., 88, 39, 10.1016/j.resconrec.2014.04.009 · DOI
  28. Wang, 2018, Estimating the environmental costs and benefits of demolition waste using life cycle assessment and willingness-to-pay: a case study in Shenzhen, J. Clean. Prod., 172, 14, 10.1016/j.jclepro.2017.10.168 · DOI

Metadata

Authors
Ram, V. G., Kishore, K. C., & Kalidindi, S. N.
Venue
Journal of Cleaner Production
Publisher
Elsevier BV
Published
2020-05
Volume
255
Pages
120258
ISSN
0959-6526
Cited by
126
References
3
Language
en
Licence
  • www.elsevier.com/tdm/userlicense/1.0/ (tdm)
  • www.elsevier.com/legal/tdmrep-license (tdm)

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Environmental benefits of construction and demolition debris recycling: Evidence from an Indian case study using life cycle assessment. https://app.cochat.ai/papers/10.1016/j.jclepro.2020.120258
The paper
Ram, V. G., Kishore, K. C., & Kalidindi, S. N. (2020). Environmental benefits of construction and demolition debris recycling: Evidence from an Indian case study using life cycle assessment. Journal of Cleaner Production. https://doi.org/10.1016/j.jclepro.2020.120258

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.