The DOI matches its Crossref record; 13 of the 13 references it cites were found in a registry or an index.
Evaluation of struggle strategy in Genetic Algorithms for ground stations scheduling problem
Open accessOverview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Scheduling Space–Ground Communications for the Air Force Satellite Control Network
Barbulescu, L., Watson, J.-P., Whitley, L. D., & Howe, A. E. (2004) · Journal of Scheduling · doi:10.1023/b:josh.0000013053.32600.3c · Cited by 232
Graph colouring approaches for a satellite range scheduling problem
Zufferey, N., Amstutz, P., & Giaccari, P. (2008) · Journal of Scheduling · doi:10.1007/s10951-008-0066-8 · Cited by 178
AFSCN scheduling: How the problem and solution have evolved
Barbulescu, L., Howe, A., & Whitley, D. (2006) · Mathematical and Computer Modelling · doi:10.1016/j.mcm.2005.12.004 · Cited by 69
A constraint-based approach to satellite scheduling
Pemberton, J. C., & Galiber (2001) · DIMACS series in discrete mathematics and theoretical computer science · doi:10.1090/dimacs/057/06 · Cited by 65
Satellite Range Scheduling: A Comparison of Genetic, Heuristic and Local Search
Barbulescu, L. V., Howe, A. E., Watson, J., & Whitley, L. D. (2002) · Lecture notes in computer science · doi:10.1007/3-540-45712-7_59 · Cited by 61
New tabu search heuristic in scheduling earth observation satellites
Sarkheyli, A., Vaghei, B. G., & Bagheri, A. (2010) · International Conference on Software Technology and Engineering · doi:10.1109/icste.2010.5608821 · Cited by 35
Aircraft route optimization using genetic algorithms
Li, Q. (1997) · doi:10.1049/cp:19971212 · Cited by 32
Trading places: how to schedule more in a multi-resource oversubscribed scheduling problem
Barbulescu, L., Howe, A. E., Whitley, L. D., et al. (2004) · Cited by 29
Combinatorial optimization techniques for spacecraft scheduling automation
Scherer, W. T., & Rotman, F. (1994) · Annals of Operations Research · doi:10.1007/bf02085657 · Cited by 21
Evaluation of Genetic Algorithms for Single Ground Station Scheduling Problem
Xhafa, F., Sun, J., Barolli, A., et al. (2012) · IEEE International Conference on Advanced Information Networking and Applications (AINA) · doi:10.1109/aina.2012.59 · Cited by 20
Self-citationA Genetic Algorithm for Ground Station Scheduling
Sun, J., & Xhafa, F. (2011) · ... International Conference on Complex, Intelligent and Software Intensive Systems · doi:10.1109/cisis.2011.29 · Cited by 18
Self-citationSolving temporal over-constrained problems using fuzzy techniques
Badaloni, S., and, M. F., & Giacomin, M. (2007) · Journal of Intelligent & Fuzzy Systems · doi:10.3233/ifs-2007-00350 · Cited by 13
DIMACS workshop on on Constraint programming and large scale discrete optimization
Freuder, E. C., & Wallace, R. J. (2000) · Cited by 5
Flagged first, then by citations
Research works printed but not linked: 1
- S. Damiani, H. Dreihahn, J. Noll, M. Niézette, G.P. Calzolari, A planning and scheduling system to allocate ESA ground station network services, in: The Intʼl Conference on Automated Planning and Scheduling, USA, 2007.
Cited by
Sorted by citations
Resolution of an Antenna–Satellite assignment problem by means of Integer Linear Programming
Vazquez, R., Perea, F., & Galán Vioque, J. (2014) · Aerospace Science and Technology · doi:10.1016/j.ast.2014.06.002 · Cited by 21
Approach for earth observation satellite real-time and playback data transmission scheduling
Chen, H., Li, L., Zhong, Z., & Li, J. (2015) · Journal of Systems Engineering and Electronics · doi:10.1109/jsee.2015.00107 · Cited by 18
A Satellite Observation Data Transmission Scheduling Algorithm Oriented to Data Topics
Chen, H., Zhai, B., Wu, J., Du, C., & Li, J. (2020) · International Journal of Aerospace Engineering · doi:10.1155/2020/2180674 · Cited by 12
“Xhafa et al. [20, 21] proposed two di ff erent algorithms, simulated annealing algorithm and genetic algo-rithm, to solve ground station scheduling problem, with the consideration of a combination objective function including access window fi tness, communication clashes fi tness, communication time…”
Method
Metadata
- Authors
- Xhafa, F., Herrero, X., Barolli, A., Barolli, L., & Takizawa, M.
- Affiliations
- Universitat Politècnica de Catalunya (ES)
- Seikei University (JP)
- Fukuoka Institute of Technology (JP)
- Corresponding author
- Xhafa, Fatos
- Venue
- Journal of Computer and System Sciences
- Publisher
- Elsevier BV
- Published
- 2013-11
- Volume
- 79
- Issue
- 7
- Pages
- 1086-1100
- ISSN
- 0022-0000 (ISSN-L)
- OpenAlex
- W1985427319
- Cited by
- 51
- References
- 13
- Citations by year
- 2026: 3 · 2025: 2 · 2024: 4 · 2023: 5 · 2022: 3 · 2021: 4 · 2020: 5 · 2019: 2 · 2018: 6 · 2017: 4 · 2016: 2 · 2015: 5 · 2014: 4 · 2013: 2
- FWCI
- 6.60
- Type
- journal article
- Language
- en
- Open access
- bronze
- doi.org
- Licence
- Locations
- Journal of Computer and System Sciences (publishedVersion)
- LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas) (acceptedVersion, cc-by-nc-nd)
- RECERCAT (Consorci de Serveis Universitaris de Catalunya) (acceptedVersion, other-oa)
- UPCommons institutional repository (Universitat Politècnica de Catalunya) (submittedVersion, cc-by-nc-nd)
- Funders
- Japan Society for the Promotion of Science (23300029)
- Topics
- Physical Sciences › Engineering › Aerospace Engineering › Satellite Communication Systems
- Physical Sciences › Computer Science › Artificial Intelligence › Metaheuristic Optimization Algorithms Research
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Scheduling and Optimization Algorithms
- Keywords
- ground station scheduling, satellite scheduling, spacecraft operations, population diversity, over-constrained problems, STK simulation
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review