Cloud-based implementation of white-box model predictive control for a GEOTABS office building: A field test demonstration
Open accessThe DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Abstract
Model predictive control (MPC) has been proven in simulations and pilot case studies to be a superior control strategy for large buildings. MPC can utilize the weather and occupancy schedule forecasts, together with the system model, to predict the future thermal behavior of the building and minimize the overall energy use and maximize thermal comfort. However, these advantages come with the cost of increased modeling effort, computational demands, communication infrastructure, and commissioning efforts. Thus a typical approach is to, often rapidly, simplify the building modeling and MPC optimization problem while paying a price of not reaching the full performance potential. It has been shown that by employing accurate physics-based models, MPC performance can be notably increased closer to its theoretical performance bound. However, implementation of such high-fidelity MPC in real buildings remains a challenge, resulting in a lack of successful field test studies. This work presents the methodology and field test demonstration of a computationally efficient implementation of the white-box MPC in an office building in Belgium. The detailed model of the building is based on first-principle physical equations. The deployment and supervision of MPC operation in a practical setting are supported by an automated cloud-based communication infrastructure. The motivating factor behind the cloud-based architecture is its compatibility with a commercially appealing control as a service concept. The building is equipped with a ground source heat pump (GSHP) and thermally activated building structures (TABS), where the combination of both is also known as GEOTABS. From a control perspective, GEOTABS buildings are particularly challenging systems due to large scale, complex heating, ventilation and air conditioning (HVAC) system, and slow dynamics with time delays. On the other hand, there is an increased potential for energy savings due to the high thermal mass, which acts as thermal storage. The MPC operation is demonstrated during the challenging transient seasons (switching between heating and cooling), and its performance is compared to a traditional rule-based controller (RBC). We provide a proof of concept of real MPC operation for the most difficult seasons with notable GSHP energy use savings equal to 53.5% and thermal comfort improvement by 36.9%. Other MPC applications found in the literature describe tests for only cooling or only heating, and up to now only for a black-box or a grey-box approach.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Approximate model predictive building control via machine learning
Drgoňa, J., Picard, D., Kvasnica, M., & Helsen, L. (2018) · Applied Energy · doi:10.1016/j.apenergy.2018.02.156 · Cited by 260
Self-citationImpact of the controller model complexity on model predictive control performance for buildings
Picard, D., Drgoňa, J., Kvasnica, M., & Helsen, L. (2017) · Energy and Buildings · doi:10.1016/j.enbuild.2017.07.027 · Cited by 97
Self-citation
Cited by
All you need to know about model predictive control for buildings
Drgoňa, J., Arroyo, J., Cupeiro Figueroa, I., Blum, D., Arendt, K., Kim, D., Ollé, E. P., Oravec, J., Wetter, M., Vrabie, D. L., et al. (2020) · Annual Reviews in Control · doi:10.1016/j.arcontrol.2020.09.001 · Cited by 1,020
Self-citationYao, Y., & Shekhar, D. K. (2021) · Building and Environment · doi:10.1016/j.buildenv.2021.107952 · Cited by 447
Yang, S., Wan, M. P., Chen, W., Ng, B. F., & Dubey, S. (2020) · Applied Energy · doi:10.1016/j.apenergy.2020.115147 · Cited by 403
Evaluation of advanced control strategies for building energy systems
Stoffel, P., Maier, L., Kümpel, A., Schreiber, T., & Müller, D. (2023) · Energy and Buildings · doi:10.1016/j.enbuild.2022.112709 · Cited by 126
Field test of Model Predictive Control in residential buildings for utility cost savings
Wang, D., Chen, Y., Wang, W., Gao, C., & Wang, Z. (2023) · Energy and Buildings · doi:10.1016/j.enbuild.2023.113026 · Cited by 84
Metadata
- Authors
- Drgoňa, J., Picard, D., & Helsen, L.
- Venue
- Journal of Process Control
- Publisher
- Elsevier BV
- Published
- 2020-04
- Volume
- 88
- Pages
- 63-77
- ISSN
- 0959-1524 (ISSN-L)
- OpenAlex
- W3011258057
- Cited by
- 128
- References
- 2
- FWCI
- 7.94
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Cloud-based implementation of white-box model predictive control for a GEOTABS office building: A field test demonstration. https://app.cochat.ai/papers/10.1016/j.jprocont.2020.02.007
- The paper
- Drgoňa, J., Picard, D., & Helsen, L. (2020). Cloud-based implementation of white-box model predictive control for a GEOTABS office building: A field test demonstration. Journal of Process Control. https://doi.org/10.1016/j.jprocont.2020.02.007
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.