An analysis of cost and duration for deconstruction and demolition of residential buildings in Massachusetts
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
Increased cost of landfilling can act as a reuse driver because it increases the disposal cost of CDW.
“Moreover, the increased cost of landfilling can act as a reuse driver because it increases the disposal cost of CDW (Dantata et al., 2005; Gorgolewski, 2008; Chileshe et al., 2016a; Chinda and Ammarapala, 2016).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dantata et al., 2005
An attractive price for reused components increases revenue from resale of these components.
“and increases the revenue from the resale of these components (Dantata et al., 2005; da Rocha and Sattler, 2009; Dunant et al., 2017; Klang et al., 2003; Sea-Lim et al., 2018)”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dantata et al., 2005
Training operators for effective deconstruction is a factor driving reuse.
“Training operators for effective deconstruction (Dantata et al., 2005; Elias Özkan, 2012; Shaurette, 2006), availability of space for the storage of the reusable components after deconstruction (Rogers, 2011) and knowledge and experience in using reused components (Tingley et al., 2017), as well as proper separation of the reusable components after deconstruction (Ajayi et al., 2017; Ding et al.,”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dantata et al., 2005
Extra charges can yield a higher deconstruction cost when compared with demolition of the same building.
“These extra charges can yield a higher deconstruction cost (when compared with the demolition of the same building) (Chileshe et al., 2015; Dantata et al., 2005; Dunant et al., 2018; Rose and Stegemann, 2018; Tingley et al., 2017; Yeung et al., 2015)”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dantata et al., 2005
The time required for deconstruction and reuse, and the consequent project scheduling, is one of the main barriers to reuse.
“According to the reviewed articles, the time required for deconstruction and reuse, and the consequent project scheduling, is one of the main barriers to reuse (Dantata et al., 2005; Gorgolewski, 2008; Gorgolewski et al., 2008; MacKinnon, 2000; Shaurette, 2006 (among others)).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dantata et al., 2005
The time required to deconstruct a 90 to 180 m2 building is three to five times higher than the time needed for demolition of the same building.
“Dantata et al. (2005) highlight that the time required to deconstruct a 90 to 180 m2 building is three to five times higher than the time needed for the demolition of the same building.”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dantata et al. (2005)
Higher deconstruction costs can hinder its application and might elevate financial risks associated with deconstruction and reuse.
“According to the literature, higher deconstruction costs can hinder its application (Chileshe et al., 2015; Dantata et al., 2005, 2018, Rose and Stegemann, 2018, Yeung et al., 2015, Tatiya et al., 2017; Tingley et al., 2017) and might elevate the financial risks associated with deconstruction and reuse (Rameezdeen et al., 2016).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dantata et al., 2005
If the productivity of the deconstruction team increases or the wages decrease or the disposal cost rises, the overall cost of deconstruction decreases, and it becomes a desirable option in Massachusetts.
“In a separate study, Dantata et al. (2005) suggest that if the productivity of the deconstruction team increases or the wages decrease or the disposal cost rises, the overall cost of deconstruction decreases, and it becomes a desirable option (in Massachusetts).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Dantata et al. (2005)
Cites
Characterization of building-related construction and demolition debris in the United States
Response, E., & Associates, F. (1998) · Medical Entomology and Zoology · Cited by 205 · see citing works
Fundamentals of Residential Construction
Allen, E., Thallon, R., & Iano, J. (2002) · Cited by 38 · see citing works
Flagged first, then by citations
Research works printed but not linked: 2
- Christoforou C. A systems analysis tool to assist decisions in construction and demolition waste management. M.S. Thesis. Boston, MA: Northeastern University; 2002.
- Emmaus A. Taking the deconstruction road to C&D management. BioCycle 2001;42(5):42 [JG Press Inc.].
Cited by
Sorted by citations
Akinade, O. O., Oyedele, L. O., Ajayi, S. O., Bilal, M., Alaka, H. A., Owolabi, H. A., Bello, S. A., Jaiyeoba, B. E., & Kadiri, K. O. (2017) · Waste Management · doi:10.1016/j.wasman.2016.08.017 · Cited by 270 · see citing works
Iacovidou, E., & Purnell, P. (2016) · Science of The Total Environment · doi:10.1016/j.scitotenv.2016.03.098 · Cited by 200 · see citing works
Components reuse in the building sector – A systematic review
Rakhshan, K., Morel, J.-C., Alaka, H., & Charef, R. (2020) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x20910463 · Cited by 167 · see citing works
“In a separate study, Dantata et al. (2005) suggest that if the productivity of the deconstruction team increases or the wages decrease or the disposal cost rises, the overall cost of deconstruction decreases, and it becomes a desirable option (in Massachusetts).”
BackgroundInfluentialda Rocha, C. G., & Sattler, M. A. (2009) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2009.07.004 · Cited by 126 · see citing works
Ranttila, H., Fink, G., Brandner, R., & Ridley-Ellis, D. (2025) · Wood Material Science & Engineering · doi:10.1080/17480272.2025.2517186 · Cited by 8 · see citing works
“Similar deconstruction productivity rates of 3.1– 4.8 lh/m 2 are reported by Dantata et al .”
InfluentialZhu, S., & Feng, H. (2025) · IOP Conference Series: Earth and Environmental Science · doi:10.1088/1755-1315/1554/1/012002 · Cited by 1 · see citing works
- Authors
- Dantata, N., Touran, A., & Wang, J.
- Affiliations
- Northeastern University (US)
- Corresponding author
- Wang, James
- ORCID
- Wang, James
- Venue
- Resources, Conservation and Recycling
- Publisher
- Elsevier BV
- Published
- 2005-04
- Volume
- 44
- Issue
- 1
- Pages
- 1-15
- ISSN
- 0921-3449 (ISSN-L)
- OpenAlex
- W1982620558
- Semantic Scholar
- 0114fa0e6659190efa6adf10159b4c10f89c4279
- Cited by
- 119
- References
- 2
- Citations by year
- 2026: 10 · 2025: 13 · 2024: 6 · 2023: 12 · 2022: 5 · 2021: 16 · 2020: 5 · 2019: 9 · 2018: 5 · 2017: 5 · 2016: 8 · 2015: 7 · 2014: 1 · 2013: 3 · 2012: 4
- FWCI
- 2.84
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Resources Conservation and Recycling (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Topics
- Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
- Physical Sciences › Engineering › Building and Construction › Sustainable Building Design and Assessment
- Physical Sciences › Environmental Science › Waste Management and Disposal › Municipal Solid Waste Management
- Keywords
- deconstruction, demolition, residential buildings, construction and demolition waste, cost comparison, landfill capacity, labor costs, tipping fees, break-even point, waste management planning, Massachusetts
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review