The DOI matches its Crossref record; 4 of the 4 references it cites were found in a registry or an index.
Identifying and prioritizing the benefits of integrating BIM and sustainability practices in construction projects: A Delphi survey of international experts
Open accessAbstract
The recent initiatives of the construction industry to embed sustainable strategies in its processes can be enhanced when clear and practical benefits of such integration are available to project stakeholders to support their decision-making. Hence, this study purports to evaluate the perceived benefits of integrating BIM initiatives and sustainability practices in construction projects. Delphi survey technique was used to solicit the perceptions of expert panel on the 36 identified benefits. Statistical tools were employed to analyze the derived data, and the consensus reached by the expert panel was validated using the interrater agreement statistics. The three most important benefits included the ability to enhance overall project quality and efficiency and improve the ability to simulate building performances and energy usage and facilitate better design products and multi-design alternatives. Comparative analyses among the expert groups lend credence to the strong consensus reached by the expert panel. Meanwhile, the study recommended strategies to enable the construction industry to key-in to these benefits as well as identifying prevalent research gaps in practice. The studyos findings will enhance the drive for the realization of the sustainable smart city as well as equip various stakeholders of the possibilities in its full adoption and implementation.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Research guidelines for the Delphi survey technique
Hasson, F. (2000) · Journal of Advanced Nursing · doi:10.1046/j.1365-2648.2000.01567.x · Cited by 5,951
Answers to 20 questions about interrater reliability and interrater agreement
LeBreton, J. M., & Senter, J. L. (2008) · Organizational Research Methods · doi:10.1177/1094428106296642 · Cited by 3,608 · cited 2×
“The coding for the IRA analysis was deduced by Lebreton and Senter (2008) as follows: 0.”
MethodAkinade, O. O., Oyedele, L. O., Ajayi, S. O., Bilal, M., Alaka, H. A., Owolabi, H. A., Bello, S. A., Jaiyeoba, B. E., & Kadiri, K. O. (2017) · Waste Management · doi:10.1016/j.wasman.2016.08.017 · Cited by 310
Waste minimisation through deconstruction: A BIM based Deconstructability Assessment Score (BIM-DAS)
Akinade, O. O., Oyedele, L. O., Bilal, M., Ajayi, S. O., Owolabi, H. A., Alaka, H. A., & Bello, S. A. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.10.018 · Cited by 272
Cited by
Chan, D. W. M., Olawumi, T. O., & Ho, A. M. L. (2019) · Journal of Building Engineering · doi:10.1016/j.jobe.2019.100764 · Cited by 342
Self-citationVera-Puerto, I., Valdes, H., Correa, C., Agredano, R., Vidal, G., Belmonte, M., Olave, J., & Arias, C. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.121717 · Cited by 38
Yevu, S. K., Yu, A. T. W., Nani, G., Darko, A., & Tetteh, M. O. (2022) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002213 · Cited by 22
Metadata
- Authors
- Olawumi, T. O., & Chan, D. W. M.
- Venue
- Sustainable Cities and Society
- Publisher
- Elsevier BV
- Published
- 2018-07
- Volume
- 40
- Pages
- 16-27
- ISSN
- 2210-6707 (ISSN-L)
- OpenAlex
- W2794487398
- Cited by
- 189
- References
- 4
- FWCI
- 15.65
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.