Offering strategy of a price-maker virtual power plant in energy and reserve markets
The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“For instance (Baringo et al., 2021) implemented a real-time OPAL-RT and Simulink-based co-simulation framework, focusing on EV load forecasting but without accounting for latency or communication delays.”
From Effect of latency and charge control of electric vehicles in power grids with high penetration of photovoltaic solar energy (2025) · cites this paper as Baringo et al., 2021
In the citing paper
“While many existing simulation studies address the integration of EVs and PV systems in distribution networks, few explicitly model the effects of communication latency between aggregators and EV charging points.”
From Effect of latency and charge control of electric vehicles in power grids with high penetration of photovoltaic solar energy (2025) · cites this paper as Baringo et al., 2021
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Definition of a 5-MW Reference Wind Turbine for Offshore System Development
Jonkman, J., Butterfield, S., Musial, W., & Scott, G. (2009) · doi:10.2172/947422 · Cited by 5,856
Research works printed but not linked: 20
- Rahimiyan, 2014, Energy management of a cluster of interconnected price-responsive demands, IEEE Trans. Power Syst., 29, 645, 10.1109/TPWRS.2013.2288316 · DOI
- Rahimiyan, 2019, Real-time energy management of a smart virtual power plant, IET Gener. Transm. Distrib., 13, 2015, 10.1049/iet-gtd.2018.5637 · doi:10.1049/iet-gtd.2018.5637
- Pandžić, 2013, Offering model for a virtual power plant based on stochastic programming, Appl. Energy, 105, 282, 10.1016/j.apenergy.2012.12.077 · DOI
- Rahimiyan, 2016, Strategic bidding for a virtual power plant in the day-ahead and real-time markets: a price-taker robust optimization approach, IEEE Trans. Power Syst., 31, 2676, 10.1109/TPWRS.2015.2483781 · DOI
- Baringo, 2017, A stochastic adaptive robust optimization approach for the offering strategy of a virtual power plant, IEEE Trans. Power Syst., 32, 3492, 10.1109/TPWRS.2016.2633546 · DOI
- Mashhour, 2011, Bidding strategy of virtual power plant for participating in energy and spinning reserve markets–Part I: problem formulation, IEEE Trans. Power Syst., 26, 949, 10.1109/TPWRS.2010.2070884 · DOI · Paper page
- Mashhour, 2011, Bidding strategy of virtual power plant for participating in energy and spinning reserve markets–Part II: numerical analysis, IEEE Trans. Power Syst., 26, 957, 10.1109/TPWRS.2010.2070883 · DOI · Paper page
- Alahyari, 2019, A hybrid storage-wind virtual power plant (VPP) participation in the electricity markets: A self-scheduling optimization considering price, renewable generation, and electric vehicles uncertainties, J. Energy Storage, 25, 10.1016/j.est.2019.100812 · DOI
- Shayegan-Rad, 2017, Day-ahead scheduling of virtual power plant in joint energy and regulation reserve markets under uncertainties, Energy, 121, 114, 10.1016/j.energy.2017.01.006 · DOI
- Baringo, 2019, Day-ahead self scheduling of a virtual power plant in energy and reserve electricity markets under uncertainty, IEEE Trans. Power Syst., 34, 1881, 10.1109/TPWRS.2018.2883753 · DOI · Paper page
- Bertsimas, 2004, The price of robustness, Oper. Res., 52, 35, 10.1287/opre.1030.0065 · DOI · Paper page
- Pourghaderi, 2018, Commercial demand response programs in bidding of a technical virtual power plant, IEEE Trans. Ind. Inform., 14, 5100, 10.1109/TII.2018.2828039 · DOI
- Kardakos, 2016, Optimal offering strategy of a virtual power plant: a stochastic bi-level approach, IEEE Trans. Power Syst., 7, 794
- Shafiekhania, 2019, Strategic bidding of virtual power plant in energy markets: a bi-level multiobjective approach, Int. J. Electr. Power, 113, 208, 10.1016/j.ijepes.2019.05.023 · doi:10.1016/j.ijepes.2019.05.023
- Foroughia, 2021, A bi-level model for optimal bidding of a multi-carrier technical virtual power plant in energy markets, Int. J. Electr. Power, 125
- Arroyo, 2020, On the use of a convex model for bulk storage in MIP-based power system operation and planning, IEEE Trans. Power Syst., 35, 4964, 10.1109/TPWRS.2020.3020730 · doi:10.1109/tpwrs.2020.3020730
- Ruiz, 2009, Pool strategy of a producer with endogenous formation of locational marginal prices, IEEE Trans. Power Syst., 24, 1855, 10.1109/TPWRS.2009.2030378 · DOI
- Fortuny-Amat, 1981, A representation and economic interpretation of a two-level programming problem, J. Oper. Res. Soc., 32, 783, 10.1057/jors.1981.156 · DOI
- Morales, 2010, A methodology to generate statistically dependent wind speed scenarios, Appl. Energy, 87, 843, 10.1016/j.apenergy.2009.09.022 · DOI · Paper page
- Contreras, 2003, ARIMA models to predict next-day electricity prices, IEEE Trans. Power Syst., 18, 1014, 10.1109/TPWRS.2002.804943 · DOI · Paper page
Cited by
Review of virtual power plant operations: Resource coordination and multidimensional interaction
Gao, H., Jin, T., Feng, C., Li, C., Chen, Q., & Kang, C. (2024) · Applied Energy · doi:10.1016/j.apenergy.2023.122284 · Cited by 185
Dávila-Sacoto, M., González, L. G., Zorita-Lamadrid, Á. L., & Espinoza, J. L. (2025) · Renewable Energies · doi:10.1177/27533735251342114 · Cited by 4
“For instance (Baringo et al., 2021) implemented a real-time OPAL-RT and Simulink-based co-simulation framework, focusing on EV load forecasting but without accounting for latency or communication delays.”
Metadata
- Authors
- Baringo, L., Freire, M., García-Bertrand, R., & Rahimiyan, M.
- Venue
- Sustainable Energy, Grids and Networks
- Publisher
- Elsevier BV
- Published
- 2021-12
- Volume
- 28
- Pages
- 100558
- ISSN
- 2352-4677
- Cited by
- 32
- References
- 1
- Language
- en
- Licence
- www.elsevier.com/tdm/userlicense/1.0/ (tdm)
- www.elsevier.com/legal/tdmrep-license (tdm)
- doi.org/10.15223/policy-017 (stm-asf)
- doi.org/10.15223/policy-037 (stm-asf)
- doi.org/10.15223/policy-012 (stm-asf)
- doi.org/10.15223/policy-029 (stm-asf)
- doi.org/10.15223/policy-004 (stm-asf)
- Funders
- Ministerio de Ciencia e Innovación (MCIN/AEI/10.13039/501100011033)
- Universidad de Castilla-La Mancha (2021-GRIN-30952)
- European Regional Development Fund
- Ministerio de Ciencia, Innovación y Universidades (RTI2018-096108-A-I00, RTI2018-098703-B-I00)
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Offering strategy of a price-maker virtual power plant in energy and reserve markets. https://app.cochat.ai/papers/10.1016/j.segan.2021.100558
- The paper
- Baringo, L., Freire, M., García-Bertrand, R., & Rahimiyan, M. (2021). Offering strategy of a price-maker virtual power plant in energy and reserve markets. Sustainable Energy, Grids and Networks. https://doi.org/10.1016/j.segan.2021.100558
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.