The DOI matches its Crossref record; 65 of the 65 references it cites were found in a registry or an index.
The Influence of Organizational External Factors on Construction Risk Management among Nigerian Construction Companies
Open accessAbstract
BACKGROUND: Substantial empirical research has shown conflicting results regarding the influence of organizational external factors on construction risk management, suggesting the necessity to introduce a moderator into the study. The present research confirmed whether rules and regulations matter on the relationships between organizational external factors and construction risk management. METHODS: Based on discouragement and organizational control theory, this research examined the effects of organizational external factors and rules and regulations on construction risk management among 238 employees operating in construction companies in Abuja and Lagos, Nigeria. A personally administered questionnaire was used to acquire the data. The data were analyzed using partial least squares structural equation modeling. RESULTS: A significant positive relationship between organizational external factors and construction risk management was asserted. This study also found a significant positive relationship between rules and regulations and construction risk management. As anticipated, rules and regulations were found to moderate the relationship between organizational external factors and construction risk management, with a significant positive result. Similarly, a significant interaction effect was also found between rules and regulations and organizational external factors. Implications of the research from a Nigerian point of view have also been discussed. CONCLUSION: Political, economy, and technology factors helped the construction companies to reduce the chance of risk occurrence during the construction activities. Rules and regulations also helped to lessen the rate of accidents involving construction workers as well as the duration of the projects. Similarly, the influence of the organizational external factors with rules and regulations on construction risk management has proven that most of the construction companies that implement the aforementioned factors have the chance to deliver their projects within the stipulated time, cost, and qualities, which can be used as a yardstick to measure a good project.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
The check wasn’t confident either way, so it gives no verdict — never disputed.
In the citing paper
“One of the limitations of SEM is that it does not assume the uncertainty and stochastic behavior of events [34]; therefore, it has limited applications for complex projects under high uncertainty [1].”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [34]
Experimental — accuracy not yet measured
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Evaluating Structural Equation Models with Unobservable Variables and Measurement Error
Fornell, C., & Larcker, D. F. (1981) · Journal of Marketing Research · doi:10.2307/3151312 · Cited by 109,314
Evaluating structural equation models with unobservable variables and measurement error
Fornell, C., & Larcker, D. F. (1981) · Journal of Marketing Research · doi:10.1177/002224378101800104 · Cited by 109,190
Herne, H., Cooley, W. W., & Lohnes, P. R. (1973) · Journal of the Royal Statistical Society Series A (General) · doi:10.2307/2344428 · Cited by 35,801
On the Evaluation of Structural Equation Models
Bagozzi, R. P., & Yi, Y. (1988) · Journal of the Academy of Marketing Science · doi:10.1007/bf02723327 · Cited by 26,163
Pls-Sem: indeed a silver bullet
Hair, J. F., Ringle, C. M., & Sarstedt, M. (2011) · Journal of Marketing Theory and Practice · doi:10.2753/mtp1069-6679190202 · Cited by 21,631
(1998) · Cited by 12,725
\nThe use of partial least squares path modeling in international marketing
Henseler, J., Ringle, C. M., & Sinkovics, R. R. (2009) · Radboud Repository (Radboud University) · doi:10.1108/s1474-7979(2009)0000020014 · Cited by 12,535
Cross validatory choice and assessment of statistical predictions
Stone, M. (1974) · Journal of the Royal Statistical Society Series B: Statistical Methodology · doi:10.1111/j.2517-6161.1974.tb00994.x · Cited by 10,881
Hanrahan, G. (2008) · CRC Press eBooks · doi:10.1201/9781420067972-10 · Cited by 8,196
Modern Methods for Business Research
(1998) · doi:10.4324/9781410604385 · Cited by 6,534
Chin, W. W., Marcolin, B. L., & Newsted, P. R. (2003) · Information Systems Research · doi:10.1287/isre.14.2.189.16018 · Cited by 6,479
Hair, J. F., Ringle, C. M., & Sarstedt, M. (2013) · Long Range Planning · doi:10.1016/j.lrp.2013.01.001 · Cited by 5,310
Two Structural Equation Models: LISREL and PLS Applied to Consumer Exit-Voice Theory
Fornell, C., & Bookstein, F. L. (1982) · Journal of Marketing Research · doi:10.2307/3151718 · Cited by 4,645
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,365
Handbook of Partial Least Squares
Vinzi, V. E., Chin, W. W., Henseler, J., & Wang, H. (2010) · Springer eBooks · doi:10.1007/978-3-540-32827-8 · Cited by 3,850
A Predictive Approach to the Random Effect Model
Geisser, S. (1974) · Biometrika · doi:10.1093/biomet/61.1.101 · Cited by 3,101
Hair, J. F., Sarstedt, M., Pieper, T. M., & Ringle, C. M. (2012) · Long Range Planning · doi:10.1016/j.lrp.2012.09.008 · Cited by 2,626
Latent Variable Path Modeling with Partial Least Squares
Lohmöller, J.-B. (1989) · Physica-Verlag eBooks · doi:10.1007/978-3-642-52512-4 · Cited by 2,197
Ringle, C. M., Sarstedt, M., & Straub, D. W. (2012) · MIS Quarterly · doi:10.2307/41410402 · Cited by 2,184
Wold, H. (2005) · Wiley eBooks · doi:10.1002/0471667196.ess1914.pub2 · Cited by 1,545
Peng, D. X., & Lai, F. (2012) · Journal of Operations Management · doi:10.1016/j.jom.2012.06.002 · Cited by 1,532
Encyclopedia of Statistical Sciences 2.
Dawid, A. P., Kotz, S., Johnson, N. L., & Read, C. B. (1984) · Biometrics · doi:10.2307/2530789 · Cited by 1,494
A Practical Guide to Calculating Cohen’s f2, a Measure of Local Effect Size, from PROC MIXED
Selya, A. S., Rose, J. S., Dierker, L. C., Hedeker, D., & Mermelstein, R. J. (2012) · Frontiers in Psychology · doi:10.3389/fpsyg.2012.00111 · Cited by 1,297
Vinzi, V. E., Trinchera, L., & Amato, S. (2009) · Springer eBooks · doi:10.1007/978-3-540-32827-8_3 · Cited by 1,209
Lewis, Agarwal, & Sambamurthy, V. (2003) · MIS Quarterly · doi:10.2307/30036552 · Cited by 1,121
Toward a Theory of Marketing Control: Environmental Context, Control Types, and Consequences
Jaworski, B. J. (1988) · Journal of Marketing · doi:10.2307/1251447 · Cited by 765
Toward an integrative framework of organizational control
Flamholtz, E., Das, T. K., & Tsui, A. S. (1985) · Accounting Organizations and Society · doi:10.1016/0361-3682(85)90030-3 · Cited by 728
The effects of construction delays on project delivery in Nigerian construction industry
Aibinu, A. A., & Jagboro, G. O. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00028-5 · Cited by 597
Modelling global risk factors affecting construction cost performance
Baloi, D., & Price, A. D. F. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00017-0 · Cited by 590
The significant factors causing delay of building construction projects in Malaysia
Alaghbari, W., Kadir, M. R. A., Salim, A., & Ernawati, E. (2007) · Engineering Construction & Architectural Management · doi:10.1108/09699980710731308 · Cited by 490
BEHAVIOR IN ORGANIZATIONSPreprint
RISMALIYANTI, A. S. (2023) · doi:10.31219/osf.io/x75bv · Cited by 482
Greenberg, J. (1983) · Cited by 412
An integrated approach to natural disaster management
Moe, T. L., & Pathranarakul, P. (2006) · Disaster Prevention and Management An International Journal · doi:10.1108/09653560610669882 · Cited by 376
A PLS Model to Study Brand Preference: An Application to the Mobile Phone Market
Duarte, P., & Raposo, M. L. B. (2009) · Springer eBooks · doi:10.1007/978-3-540-32827-8_21 · Cited by 372
Scupola, A. (2003) · Journal of Global Information Technology Management · doi:10.1080/1097198x.2003.10856343 · Cited by 371
Is two-tailed testing for directional research hypotheses tests legitimate?
Cho, H.-C., & Abe, S. (2012) · Journal of Business Research · doi:10.1016/j.jbusres.2012.02.023 · Cited by 313
Bresnen, M., & Marshall, N. (2000) · Construction Management and Economics · doi:10.1080/014461900433104 · Cited by 312
Helm, S., Eggert, A., & Garnefeld, I. (2009) · Springer eBooks · doi:10.1007/978-3-540-32827-8_23 · Cited by 294
Causal flows with latent variables
Wold, H. (1974) · European Economic Review · doi:10.1016/0014-2921(74)90008-7 · Cited by 269
Construction risk assessment by linguistics
Kangari, R., & Riggs, L. S. (1989) · IEEE Transactions on Engineering Management · doi:10.1109/17.18829 · Cited by 247
Contributors to construction delays
Kumaraswamy, M. M., & Chan, D. W. M. (1998) · Construction Management and Economics · doi:10.1080/014461998372556 · Cited by 240
Bhojanna, U., & Murthy, S. (2010) · Cited by 236
Partial least-squares path modelling with latent variables
Gerlach, R. W., Kowalski, B. R., & Wold, H. (1979) · Analytica Chimica Acta · doi:10.1016/s0003-2670(01)85039-x · Cited by 206
Three criteria for the use of one-tailed tests.
Kimmel, H. D. (1957) · Psychological Bulletin · doi:10.1037/h0046737 · Cited by 157
The Titanic sunk, so what? Project manager response to unexpected events
Geraldi, J. G., Lee‐Kelley, L., & Kutsch, E. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.10.008 · Cited by 157
Doloi, H. K. (2009) · Construction Management and Economics · doi:10.1080/01446190903286564 · Cited by 137
Blalock, H. M. (1979) · American Sociological Review · doi:10.2307/2094714 · Cited by 125
TQM, Culture, and Performance in UAE Manufacturing Firms
Jabnoun, N., & Sedrani, K. (2005) · Quality Management Journal · doi:10.1080/10686967.2005.11919267 · Cited by 100
Contractor development in Nigeria: perceptions of contractors and professionals
Adams, O. A. (1997) · Construction Management and Economics · doi:10.1080/014461997373141 · Cited by 81
An empirical study of the complexity of requirements management in construction projects
Jallow, A. K., Demian, P., Baldwin, A. N., & Anumba, C. (2014) · Engineering Construction & Architectural Management · doi:10.1108/ecam-09-2013-0084 · Cited by 74
Ahmed, S. M., AHMAD, R., & Saram, D. D. D. (1999) · Engineering Construction & Architectural Management · doi:10.1108/eb021114 · Cited by 69
Risk: Analysis, Assessment and Management
Bowers, J. A. (1993) · Journal of the Operational Research Society · doi:10.1057/jors.1993.163 · Cited by 66
Significant risk factors in construction projects: Contractor's perception
Karim, N. A. A., Rahman, I. B. A., Hameed, A., Jamil, N., & Azis, A. A. A. (2012) · IEEE Colloquium on Humanities, Science and Engineering · doi:10.1109/chuser.2012.6504337 · Cited by 59
The business environment of the construction industry in Nigeria
Aniekwu, A. N. (1995) · Construction Management and Economics · doi:10.1080/01446199500000052 · Cited by 56
Sustainable refurbishment: policy direction and support in the UK
Mansfield, J. R. (2009) · International Journal of Building Pathology and Adaptation · doi:10.1108/02630800910956461 · Cited by 46
Introducing a New Risk Management Model to the Saudi Arabian Construction Industry
Algahtany, M., Alhammadi, Y., & Kashiwagi, D. T. (2016) · Procedia Engineering · doi:10.1016/j.proeng.2016.04.122 · Cited by 38
Alinaitwe, H. M. (2008) · Journal of Civil Engineering and Management · doi:10.3846/1392-3730.2008.14.1 · Cited by 36
The performance and problems of affordable housing policy in China
Niu, Y. F. (2008) · International Journal of Housing Markets and Analysis · doi:10.1108/17538270810877763 · Cited by 34
Exploring Causal Path Directionality for a Marketing Model Using Cohen’s Path Method
Callaghan, W. M., Wilson, B. J., Ringle, C. M., & Henseler, J. (2007) · University of Twente Research Information · Cited by 30
Delivering new affordable housing in the age of austerity: housing policy in Scotland
Gibb, K. (2011) · International Journal of Housing Markets and Analysis · doi:10.1108/17538271111172157 · Cited by 30
Predictors of Housing Satisfaction in Abuja, Nigeria
Ukoha, O. M., & Beamish, J. O. (1996) · Housing and Society · doi:10.1080/08882746.1996.11430249 · Cited by 27
How great leaders avoid disaster: the value of contingency planning
Simpkins, R. A. (2009) · Business Strategy Series · doi:10.1108/17515630910942241 · Cited by 15
A CRITICAL LOOK AT THE USE OF PLS-SEM IN MISQ
Ringle, C. M., Sarstedt, M., & Straub, D. W. (2012) · Cited by 3
(1992)
Use of partial least squares (PLS) in strategic management research: a review of four recent studies
Hulland, J. (1999) · Strategic Management Journal · doi:10.1002/(sici)1097-0266(199902)20:2
Flagged first, then by citations
Research works printed but not linked: 4
- Abu Hassan, 2012, Evaluating risk management practices in construction company: evidence from Oman, Int J Acad Res, 42, 32
- Israelsson, 2009, Factors influencing flexibility in buildings, Struct Surv, 272, 138
- Ugochukwu, 2014, Participation of indigenous contractors in Nigerian public sector, construction projects and their challenges in managing working capital, Int J Civil Eng, 1, 1
- Barclay, 1995, The partial least squares (PLS) approach to causal modeling: personal computer adoption and use as an illustration, Technol Stud, 2, 285
Cited by
Sorted by citations
Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2019-0047 · Cited by 172
Malaysian SMEs m-commerce adoption: TAM 3, UTAUT 2 and TOE approach
Salimon, M. G., Kareem, O., Mokhtar, S. S. M., Aliyu, O. A., Bamgbade, J. A., & Adeleke, A. Q. (2021) · Journal of Science and Technology Policy Management · doi:10.1108/jstpm-06-2019-0060 · Cited by 107
Analysis of some factors driving ecological sustainability in construction firms
Bamgbade, J. A., Kamaruddeen, A. M., Nawi, M. N. M., Adeleke, A. Q., Salimon, M. G., & Ajibike, W. A. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.10.229 · Cited by 110
Khodabakhshian, A., Puolitaival, T., & Kestle, L. (2023) · Buildings · doi:10.3390/buildings13051312 · Cited by 100
Bamgbade, J. A., Nawi, M. N. M., Kamaruddeen, A. M., Adeleke, A. Q., & Salimon, M. G. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2019.1634666 · Cited by 76
Metadata
- Authors
- Adeleke, A. Q., Bahaudin, A. Y., Kamaruddeen, A. M., Bamgbade, J. A., Salimon, M. G., Khan, M. W. A., & Sorooshian, S.
- Affiliations
- Universiti Malaysia Pahang Al-Sultan Abdullah (MY)
- Universiti Utara Malaysia (MY)
- University of Technology Sarawak (MY)
- Swinburne University of Technology (AU)
- Corresponding author
- Adeleke, A.Q.
- ORCID
- Venue
- Safety and Health at Work
- Publisher
- Elsevier BV
- Published
- 2018-03
- Volume
- 9
- Issue
- 1
- Pages
- 115-124
- ISSN
- 2093-7911 (ISSN-L)
- PMC
- PMC6111111
- OpenAlex
- W2620647389
- Cited by
- 107
- References
- 65
- Citations by year
- 2026: 4 · 2025: 4 · 2024: 12 · 2023: 19 · 2022: 14 · 2021: 16 · 2020: 17 · 2019: 15 · 2018: 6
- FWCI
- 9.20
- Type
- journal article
- Language
- en
- Open access
- gold
- doi.org
- Licence
- Locations
- Safety and Health at Work (publishedVersion, cc-by-nc-nd)
- Europe PMC (PubMed Central) (publishedVersion, cc-by-nc-nd)
- PubMed Central (publishedVersion, cc-by-nc-nd)
- PubMed (publishedVersion)
- Universiti Utara Malaysia Institutional Repository (Universiti Utara Malaysia) (acceptedVersion)
- UMP Institutional Repository (Universiti Malaysia Pahang) (acceptedVersion)
- DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
- Figshare (submittedVersion, cc-by-nc-nd)
- Swinburne figshare (Swinburne University of Technology) (submittedVersion, cc-by-nc-nd)
- Swinburne figshare (Swinburne University of Technology)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Safety Research › Occupational Health and Safety Research
- Physical Sciences › Engineering › Civil and Structural Engineering › Construction Engineering and Safety
- Keywords
- construction risk management, rules and regulations, organizational control theory, political factors, economic factors, technological factors, construction companies, project duration, Nigeria
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review