Multistage large-scale charging station planning for electric buses considering transportation network and power grid
Abstract
Abstract With the applications of electric buses (e-buses), potential solutions to problems related to infrastructures for charging e-buses are emerging. This study particularly focused on large-scale fast charging-station planning for e-buses in the public transportation electrification process, according to the characteristics of e-bus operation and plug-in fast charging mode. We conducted an interdisciplinary study to optimize planning jointly under the transportation system and power grid. In addition to capturing the spatiality of the e-bus charging service network, we further considered temporality in order to conduct long-term planning in view of the continuously growing e-bus charging demand. A spatial-temporal model, which determines the sites and sizes of e-bus charging stations, was proposed and the strategies for multistage infrastructure planning were put forward. The model was equivalently transformed into a mixed-integer second-order cone programming with high computational efficiency. The model and the multistage planning strategies were justified through a series of numerical experiments. A case study of Shenzhen, China was implemented and the robustness of the model to plan changes was studied.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Branch Flow Model: Relaxations and Convexification—Part I
Farivar, M., & Low, S. H. (2013) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2013.2255317 · Cited by 1,541
Impact of uncoordinated plug-in electric vehicle charging on residential power demand
Muratori, M. (2018) · Nature Energy · doi:10.1038/s41560-017-0074-z · Cited by 695
Infrastructure planning for electric vehicles with battery swapping
Mak, H.-Y., Rong, Y., & Shen, Z.-J. M. (2013) · Management Science · doi:10.1287/mnsc.1120.1672 · Cited by 570
Self-citationPEV fast-charging station siting and sizing on coupled transportation and power networks
Zhang, H., Moura, S. J., Hu, Z., & Song, Y. (2018) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2016.2614939 · Cited by 350
Online routing and battery reservations for electric vehicles with swappable batteries
Adler, J. D., & Mirchandani, P. B. (2014) · Transportation Research Part B Methodological · doi:10.1016/j.trb.2014.09.005 · Cited by 103
Cited by
Electric bus fleet scheduling under travel time and energy consumption uncertainty
Avishan, F., Yanıkoğlu, İ., & Alwesabi, Y. (2023) · Transportation Research Part C: Emerging Technologies · doi:10.1016/j.trc.2023.104357 · Cited by 45
Metadata
- Authors
- Lin, Y., Zhang, K., Shen, Z.-J. M., Ye, B., & Miao, L.
- Venue
- Transportation Research Part C: Emerging Technologies
- Publisher
- Elsevier BV
- Published
- 2019-10
- Volume
- 107
- Pages
- 423-443
- ISSN
- 0968-090X (ISSN-L)
- OpenAlex
- W2970949370
- Cited by
- 235
- References
- 5
- FWCI
- 8.19
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Multistage large-scale charging station planning for electric buses considering transportation network and power grid. https://app.cochat.ai/papers/10.1016/j.trc.2019.08.009
- The paper
- Lin, Y., Zhang, K., Shen, Z.-J. M., Ye, B., & Miao, L. (2019). Multistage large-scale charging station planning for electric buses considering transportation network and power grid. Transportation Research Part C: Emerging Technologies. https://doi.org/10.1016/j.trc.2019.08.009
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.