Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing
The DOI matches its Crossref record; 29 of the 29 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Quantitative models for reverse logistics: A review
Fleischmann, M., Bloemhof-Ruwaard, J. M., Dekker, R., van der Laan, E., van Nunen, J. A. E. E., & Van Wassenhove, L. N. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(97)00230-0 · Cited by 1,902
Going Backwards: Reverse Logistics Trends and Practices
Rogers, D. S., & Tibben‐Lembke, R. S. (1999) · Medical Entomology and Zoology · Cited by 1,648
Issues in environmentally conscious manufacturing and product recovery: a survey
Gungor, A., & Gupta, S. M. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00167-9 · Cited by 1,107
Ilgin, M. A., & Gupta, S. M. (2010) · Journal of Environmental Management · doi:10.1016/j.jenvman.2009.09.037 · Cited by 1,015
THE IMPACT OF PRODUCT RECOVERY ON LOGISTICS NETWORK DESIGN
FLEISCHMANN, M., BEULLENS, P., BLOEMHOF‐RUWAARD, J. M., & VANWASSENHOVE, L. N. (2001) · Production and Operations Management · doi:10.1111/j.1937-5956.2001.tb00076.x · Cited by 833
A characterisation of logistics networks for product recovery
Fleischmann, M., Krikke, H. R., Dekker, R., & Flapper, S. D. P. (2000) · Omega · doi:10.1016/s0305-0483(00)00022-0 · Cited by 786
A robust optimization approach to closed-loop supply chain network design under uncertainty
Pishvaee, M. S., Rabbani, M., & Torabi, S. A. (2010) · Applied Mathematical Modelling · doi:10.1016/j.apm.2010.07.013 · Cited by 664
A closed-loop logistics model for remanufacturing
Jayaraman, V, Guide, V. D. R., & Srivastava, R. (1999) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600716 · Cited by 537
A possibilistic programming approach for closed-loop supply chain network design under uncertainty
Pishvaee, M. S., & Torabi, S. A. (2010) · Fuzzy Sets and Systems · doi:10.1016/j.fss.2010.04.010 · Cited by 502
A memetic algorithm for bi-objective integrated forward/reverse logistics network design
Pishvaee, M. S., Farahani, R. Z., & Dullaert, W. (2010) · Computers & Operations Research · doi:10.1016/j.cor.2009.09.018 · Cited by 453
Amin, S. H., & Zhang, G. (2013) · Applied Mathematical Modelling · doi:10.1016/j.apm.2012.09.039 · Cited by 432
Kannan, G., Sasikumar, P., & Devika, K. (2010) · Applied Mathematical Modelling · doi:10.1016/j.apm.2009.06.021 · Cited by 400
Concurrent product and closed-loop supply chain design with an application to refrigerators
Krikke, H., Bloemhof-Ruwaard, J., & Van Wassenhove, L. N. (2003) · International Journal of Production Research · doi:10.1080/0020754031000120087 · Cited by 392
Amin, S. H., & Zhang, G. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.12.056 · Cited by 343
Incorporating location, routing and inventory decisions in supply chain network design
Javid, A. A., & Azad, N. (2009) · Transportation Research Part E Logistics and Transportation Review · doi:10.1016/j.tre.2009.06.005 · Cited by 319
Kenné, J., Dejax, P. J., & Gharbi, A. (2010) · International Journal of Production Economics · doi:10.1016/j.ijpe.2010.10.026 · Cited by 304
Miranda, P. A., & Garrido, R. A. (2004) · Transportation Research Part E: Logistics and Transportation Review · doi:10.1016/j.tre.2003.08.006 · Cited by 300
Disassembly line in product recovery
Güngör, A., & Gupta, S. M. (2002) · International Journal of Production Research · doi:10.1080/00207540210135622 · Cited by 288
Agrawal, S., & Tiwari, M. K. (2008) · International Journal of Production Research · doi:10.1080/00207540600943985 · Cited by 252
Koc, A., Sabuncuoğlu, İ., & Erel, E. (2009) · IIE Transactions · doi:10.1080/07408170802510390 · Cited by 229
Comparison of external costs of rail and truck freight transportation
Forkenbrock, D. J. (2001) · Transportation Research Part A: Policy and Practice · doi:10.1016/s0965-8564(99)00061-0 · Cited by 226
Operational and environmental performance measures in a multi-product closed-loop supply chain
Paksoy, T., Bektaş, T., & Özceylan, E. (2011) · Transportation Research Part E: Logistics and Transportation Review · doi:10.1016/j.tre.2010.12.001 · Cited by 223
Self-citationQiang, Q., Ke, K., Anderson, T., & Dong, J. (2013) · Omega · doi:10.1016/j.omega.2011.08.011 · Cited by 215
The optimization of the closed-loop supply chain network
Guang-fen, Y., Wang, Z., & Li, X. (2008) · Transportation Research Part E Logistics and Transportation Review · doi:10.1016/j.tre.2008.02.007 · Cited by 176
The spatial and temporal consolidation of returned products in a closed-loop supply chain network
Min, H., Ko, C. S., & Ko, H. J. (2006) · Computers & Industrial Engineering · doi:10.1016/j.cie.2006.02.010 · Cited by 161
A mixed integer programming model for a closed-loop supply-chain network
Özceylan, E., & Paksoy, T. (2012) · International Journal of Production Research · doi:10.1080/00207543.2012.661090 · Cited by 152
Self-citationTask-failure-driven rebalancing of disassembly lines
Altekin, F. T., & Akkan, C. (2011) · International Journal of Production Research · doi:10.1080/00207543.2011.616915 · Cited by 139
The supply chain implications of recycling
Pagell, M. D., Wu, Z., & Murthy, N. N. (2007) · Business Horizons · doi:10.1016/j.bushor.2006.08.007 · Cited by 136
Easwaran, G., & Üster, H. (2009) · Transportation Science · doi:10.1287/trsc.1090.0267 · Cited by 86
Cited by
Zhang, A., Wang, J. X., Farooque, M., Wang, Y., & Choi, T.-M. (2021) · Transportation Research Part E: Logistics and Transportation Review · doi:10.1016/j.tre.2021.102509 · Cited by 224
Disassembly line balancing problem: a review of the state of the art and future directions
Özceylan, E., Kalayci, C. B., Güngör, A., & Gupta, S. M. (2019) · International Journal of Production Research · doi:10.1080/00207543.2018.1428775 · Cited by 220
“…Paksoy et al. (2013); Bentaha et al. (2013c); Liu, Chen, and Huang (2013); Pehlivan, Özceylan, and Paksoy (2013); Minca, Filipescu, and Voda (2014); Özceylan, Paksoy, and Bektaş (2014); Habibi et al. (2014); Hezer and Kara (2015); Kalaycılar, Azizoğlu, and Yeralan (2016); Mete et al. (2016a,…”
BackgroundSelf-citationLiterature review: Strategic network optimization models in waste reverse supply chains
Van Engeland, J., Beliën, J., De Boeck, L., & De Jaeger, S. (2020) · Omega · doi:10.1016/j.omega.2018.12.001 · Cited by 199
MahmoumGonbadi, A., Genovese, A., & Sgalambro, A. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2021.129101 · Cited by 188
Bentaha, M. L., Battaïa, O., & Dolgui, A. (2015) · International Journal of Production Research · doi:10.1080/00207543.2014.961212 · Cited by 181
Metadata
- Authors
- Özceylan, E., Paksoy, T., & Bektaş, T.
- Venue
- Transportation Research Part E: Logistics and Transportation Review
- Publisher
- Elsevier BV
- Published
- 2014-01
- Volume
- 61
- Pages
- 142-164
- ISSN
- 1366-5545 (ISSN-L)
- OpenAlex
- W2064887541
- Cited by
- 171
- References
- 29
- FWCI
- 31.84
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.