Scheduling with batching: A review
The DOI matches its Crossref record; 71 of the 72 references it cites were found in a registry or an index.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“the batching problem in our setting significantly differs from traditional problems (e.g., Potts and Kovalyov [2000]). When assuming that the KV cache memory limit is the sole constraint for the batch size, the number of jobs in a batch during each round varies depending on the specific jobs included in the batch.”
From Online Scheduling for LLM Inference with KV Cache Constraints (2025) · cites this paper as Potts and Kovalyov [2000]
Citations
Cites
Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. R. (1979) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70356-x · Cited by 5,854
Optimal two‐ and three‐stage production schedules with setup times included
Johnson, S. M. (1954) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800010110 · Cited by 3,252
Various optimizers for single‐stage production
Smith, W. E. (1956) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800030106 · Cited by 1,831
Scheduling with Deadlines and Loss Functions
McNaughton, R. (1959) · Management Science · doi:10.1287/mnsc.6.1.1 · Cited by 848
An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
Moore, J. M. (1968) · Management Science · doi:10.1287/mnsc.15.1.102 · Cited by 828
SCHEDULING A PRODUCTION LINE TO MINIMIZE MAXIMUM TARDINESS
Jackson, J. R. (1955) · Cited by 796
Efficient Algorithms for Scheduling Semiconductor Burn-In Operations
Lee, C., Uzsoy, R., & Martin-Vega, L. A. (1992) · Operations Research · doi:10.1287/opre.40.4.764 · Cited by 493
Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
Potts, C. N., & Wassenhove, L. N. V. (1992) · Journal of the Operational Research Society · doi:10.1057/jors.1992.66 · Cited by 449
Self-citationBrucker, P., Gladky, A. A., Hoogeveen, J. A., Kovalyov, M. Y., Potts, C. N., Tautenhahn, T., & van de Velde, S. (1998) · Journal of Scheduling · doi:10.1002/(sici)1099-1425(199806)1:1<31::aid-jos4>3.0.co;2-r · Cited by 423
Self-citationScheduling Groups of Jobs on a Single Machine
Webster, S., & Baker, K. R. (1995) · Operations Research · doi:10.1287/opre.43.4.692 · Cited by 380
Research works printed but not linked: 4
- D. Dannenberg, T. Tautenhahn, F. Werner, A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size, Preprint No. 52, Fakultät für Mathematik, Otto-von-Guericke-Universität Magdeburg, Germany, 1997
- Julien, 1990, Scheduling customer orders: An alternative production scheduling approach, Journal of Manufacturing and Operations Management, 3, 177
- A.J. Mason, Genetic Algorithms and Scheduling Problems, Ph.D. Thesis, Department of Engineering, University of Cambridge, UK, 1992
- C.A. Santos, Batching and Sequencing Decisions under Lead Time Considerations for Single Machine Problems, M.Sc. Thesis, Department of Management Sciences, University of Waterloo, Canada, 1984
Cited by
A survey of scheduling problems with setup times or costs
Allahverdi, A., Ng, C. T., Cheng, T. C. E., & Kovalyov, M. Y. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.06.060 · Cited by 1,527
Self-citationThe capacitated lot sizing problem: a review of models and algorithms
Karimi, B., Ghomi, S. M. T. F., & Wilson, J. (2003) · Omega · doi:10.1016/s0305-0483(03)00059-8 · Cited by 873
Integrated Production and Outbound Distribution Scheduling: Review and Extensions
Chen, Z. (2009) · Operations Research · doi:10.1287/opre.1080.0688 · Cited by 610
Supply Chain Scheduling: Batching and Delivery
Hall, N. G., & Potts, C. N. (2003) · Operations Research · doi:10.1287/opre.51.4.566.16106 · Cited by 454
Self-citationMönch, L., Fowler, J. W., Dauzère-Pérès, S., Mason, S. J., & Rose, O. (2011) · Journal of Scheduling · doi:10.1007/s10951-010-0222-9 · Cited by 432
Flowshop scheduling research after five decades
Gupta, J. N. D., & Stafford, E. F. (2005) · European Journal of Operational Research · doi:10.1016/j.ejor.2005.02.001 · Cited by 385
Mathirajan, M., & Sivakumar, A. (2006) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-005-2585-1 · Cited by 323
Unrelated parallel machine scheduling with setup times using simulated annealing
Kim, D.-W., Kim, K.-H., Jang, W., & Chen, F. F. (2002) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/s0736-5845(02)00013-3 · Cited by 280
Machine scheduling with job delivery coordination
Chang, Y.-C., & Lee, C. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(03)00364-3 · Cited by 252
Melouk, S. H., Damodaran, P., & Chang, P.-Y. (2003) · International Journal of Production Economics · doi:10.1016/s0925-5273(03)00092-6 · Cited by 216
A survey of scheduling with parallel batch (p-batch) processing
Fowler, J. W., & Mönch, L. (2022) · European Journal of Operational Research · doi:10.1016/j.ejor.2021.06.012 · Cited by 207
Fifty years of scheduling: a survey of milestones
Potts, C. N., & Strusevich, V. A. (2009) · Journal of the Operational Research Society · doi:10.1057/jors.2009.2 · Cited by 200
Self-citationMILP models to minimise makespan in additive manufacturing machine scheduling problems
Küçükkoç, İ. (2019) · Computers & Operations Research · doi:10.1016/j.cor.2019.01.006 · Cited by 172
Decomposition Method for New Single-Machine Scheduling Problems From Steel Production Systems
Zhao, Z., Liu, S., Zhou, M., Guo, X., & Qi, L. (2019) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2019.2953669 · Cited by 154
Modeling and controlling an isolated urban intersection based on cooperative vehicles
Ahmane, M., Abbas‐Turki, A., Perronnet, F., Wu, J., Moudni, A. E., Buisson, J., & Zéo, R. (2013) · Transportation Research Part C Emerging Technologies · doi:10.1016/j.trc.2012.11.004 · Cited by 152
Minimizing makespan on parallel batch processing machines
Chang, P., Damodaran, P., & Melouk, S. H. (2004) · International Journal of Production Research · doi:10.1080/00207540410001711863 · Cited by 148
Single-machine scheduling problems with past-sequence-dependent setup times
KOULAMAS, C. P., & Kyparisis, G. J. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.03.066 · Cited by 146
Damodaran, P., Manjeshwar, P. K., & Srihari, K. (2006) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.02.010 · Cited by 142
Unrelated parallel machine scheduling with setup times and a total weighted tardiness objective
Kim, D.-W., Na, D.-G., & Chen, F. F. (2003) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/s0736-5845(02)00077-7 · Cited by 144
Shyu, S. J., Lin, B. M. T., & Yin, P.-Y. (2004) · Computers & Industrial Engineering · doi:10.1016/j.cie.2004.06.006 · Cited by 140
A comprehensive review of flowshop group scheduling literature
Neufeld, J. S., Gupta, J. N. D., & Buscher, U. (2015) · Computers & Operations Research · doi:10.1016/j.cor.2015.12.006 · Cited by 139
Kong, L., Li, H., Luo, H., Ding, L., & Zhang, X. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.05.037 · Cited by 138
Zhong, R. Y., Huang, G. Q., Lan, S., Dai, Q., Zhang, T., & Xu, C. (2015) · Advanced Engineering Informatics · doi:10.1016/j.aei.2015.01.002 · Cited by 133
Lot sizing and furnace scheduling in small foundries
de Araújo, S. A., Arenales, M. N., & Clark, A. R. (2006) · Computers & Operations Research · doi:10.1016/j.cor.2006.05.010 · Cited by 131
A discrete Water Wave Optimization algorithm for no-wait flow shop scheduling problem
Zhao, F., Liu, H., Zhang, Y., Ma, W., & Zhang, C. (2017) · Expert Systems with Applications · doi:10.1016/j.eswa.2017.09.028 · Cited by 127
Wang, S., Liu, M., Chu, F., & Chu, C. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.07.206 · Cited by 123
Scheduling a hybrid flowshop with batch production at the last stage
Xuan, H., & Tang, L. (2005) · Computers & Operations Research · doi:10.1016/j.cor.2005.10.014 · Cited by 123
Pundoor, G., & Chen, Z. (2005) · Naval Research Logistics (NRL) · doi:10.1002/nav.20100 · Cited by 123
Bredström, D., Lundgren, J. T., Rönnqvist, M., Carlsson, D., & Mason, A. (2003) · European Journal of Operational Research · doi:10.1016/j.ejor.2003.08.001 · Cited by 123
Voß, S., & Witt, A. (2005) · International Journal of Production Economics · doi:10.1016/j.ijpe.2004.05.029 · Cited by 119
Shahvari, O., & Logendran, R. (2016) · Computers & Operations Research · doi:10.1016/j.cor.2016.07.021 · Cited by 116
Nesting and scheduling problems for additive manufacturing: A taxonomy and review
Oh, Y., Witherell, P., Lu, Y., & Sprock, T. (2020) · Additive manufacturing · doi:10.1016/j.addma.2020.101492 · Cited by 116
Mönch, L., Schabacker, R., Pabst, D., & Fowler, J. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2005.12.020 · Cited by 112
A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times
Lopes, M. J. P., & de Carvalho, J. V. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2005.11.001 · Cited by 109
The Coordination of Scheduling and Batch Deliveries
Hall, N. G., & Potts, C. N. (2005) · Annals of Operations Research · doi:10.1007/s10479-005-6234-8 · Cited by 112
Self-citationSupply Chain Scheduling: Distribution Systems
Dawande, M., Geismar, N., Hall, N. G., & Sriskandarajah, C. (2006) · Production and Operations Management · doi:10.1111/j.1937-5956.2006.tb00243.x · Cited by 107
Using Genetic Algorithms and Heuristics for Job Shop Scheduling with Sequence-Dependent Setup Times
Cheung, W., & Zhou, H. (2001) · Annals of Operations Research · doi:10.1023/a:1014990729837 · Cited by 106
Bi-criteria single-machine batch scheduling with machine on/off switching under time-of-use tariffs
Cheng, J., Chu, F., Liu, M., Wu, P., & Xia, W. (2017) · Computers & Industrial Engineering · doi:10.1016/j.cie.2017.04.026 · Cited by 103
Makespan minimization on single batch-processing machine via ant colony optimization
Xu, R., Chen, H., & Li, X. (2011) · Computers & Operations Research · doi:10.1016/j.cor.2011.05.011 · Cited by 101
A review of four decades of time-dependent scheduling: main results, new topics, and open problems
Gawiejnowicz, S. (2020) · Journal of Scheduling · doi:10.1007/s10951-019-00630-w · Cited by 97
Arroyo, J. E. C., & Leung, J. Y. ‐. (2017) · Computers & Industrial Engineering · doi:10.1016/j.cie.2016.12.038 · Cited by 92
Solving the serial batching problem in job shop manufacturing systems
Shen, L., & Buscher, U. (2012) · European Journal of Operational Research · doi:10.1016/j.ejor.2012.03.001 · Cited by 89
Baptiste, P. (2000) · Mathematical Methods of Operations Research · doi:10.1007/s001860000088 · Cited by 89
Altekin, F. T., & Bukchin, Y. (2021) · European Journal of Operational Research · doi:10.1016/j.ejor.2021.10.020 · Cited by 88
Chiang, T.-C., Cheng, H.-C., & Fu, L. (2010) · Computers & Operations Research · doi:10.1016/j.cor.2010.03.017 · Cited by 86
Single batch processing machine scheduling with two-dimensional bin packing constraints
Li, X., & Zhang, K. (2017) · International Journal of Production Economics · doi:10.1016/j.ijpe.2017.11.015 · Cited by 84
Aircraft landing problems with aircraft classes
Briskorn, D., & Stolletz, R. (2013) · Journal of Scheduling · doi:10.1007/s10951-013-0337-x · Cited by 82
Kong, L., Li, H., Luo, H., Ding, L., Luo, X., & Skitmore, M. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.03.016 · Cited by 82
Capacity Allocation and Scheduling in Supply Chains
Hall, N. G., & Liu, Z. (2010) · Operations Research · doi:10.1287/opre.1090.0806 · Cited by 81
Chien, C., & Chen, C.-H. (2006) · OR Spectrum · doi:10.1007/s00291-006-0062-3 · Cited by 79
Using an optimized queueing network model to support wafer fab design
Hopp, W. J., SPEARMAN, M. L., Chayet, S., Donohue, K. L., & Gel, E. S. (2002) · IIE Transactions · doi:10.1080/07408170208928855 · Cited by 79
An empirical investigation of scheduling performance criteria
de Snoo, C., van Wezel, W., & Jorna, R. (2010) · Journal of Operations Management · doi:10.1016/j.jom.2010.12.006 · Cited by 78
Multiobjective optimization for complex flexible job-shop scheduling problems
Tamssaouet, K., Dauzère‐Pérès, S., Knopp, S., Bitar, A., & Yugma, C. (2021) · European Journal of Operational Research · doi:10.1016/j.ejor.2021.03.069 · Cited by 77
A batch-oblivious approach for Complex Job-Shop scheduling problems
Knopp, S., Dauzère‐Pérès, S., & Yugma, C. (2017) · European Journal of Operational Research · doi:10.1016/j.ejor.2017.04.050 · Cited by 76
Unbounded parallel-batching scheduling with two competitive agents
Li, S., & Yuan, J. (2011) · Journal of Scheduling · doi:10.1007/s10951-011-0253-x · Cited by 75
Batch processing with interval graph compatibilities between tasks
Finke, G., Jost, V., Queyranne, M., & Sebö, A. (2007) · Discrete Applied Mathematics · doi:10.1016/j.dam.2006.03.039 · Cited by 75
Imaging Order Scheduling of an Earth Observation Satellite
Liao, D.-Y., & Yang, Y.-T. (2007) · IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews) · doi:10.1109/tsmcc.2007.900668 · Cited by 71
Scheduling on a single machine with family setups to minimize total tardiness
Schaller, J. E. (2005) · International Journal of Production Economics · doi:10.1016/j.ijpe.2004.10.020 · Cited by 73
Fuzzy job shop scheduling with lot-sizing
Petrović, S., Fayad, C., Petrov́ić, D., Burke, E. K., & Kendall, G. (2007) · Annals of Operations Research · doi:10.1007/s10479-007-0287-9 · Cited by 72
A meta-heuristic to minimize makespan for parallel batch machines with arbitrary job sizes
Jia, Z., & Leung, J. Y. ‐. (2014) · European Journal of Operational Research · doi:10.1016/j.ejor.2014.07.039 · Cited by 72
Gharehgozli, A. H., Tavakkoli-Moghaddam, R. R., & Zaerpour, N. (2009) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2008.12.005 · Cited by 71
Valente, J. M. S., & Alves, R. A. F. S. (2007) · Computers & Operations Research · doi:10.1016/j.cor.2006.11.004 · Cited by 71
Single machine batch scheduling with sequential job processing
Cheng, T. C. E., & Kovalyov, M. Y. (2001) · IIE Transactions · doi:10.1080/07408170108936839 · Cited by 70
Self-citationMachine scheduling with an availability constraint and job delivery coordination
Wang, X., & Cheng, T. C. E. (2006) · Naval Research Logistics (NRL) · doi:10.1002/nav.20175 · Cited by 70
Two-agent single-machine scheduling to minimize the batch delivery cost
Yin, Y., Wang, Y., Cheng, T. C. E., Wang, D., & Wu, C. (2015) · Computers & Industrial Engineering · doi:10.1016/j.cie.2015.12.003 · Cited by 70
Single machine batch scheduling with resource dependent setup and processing times
Cheng, T. C. E., Janiak, A., & Kovalyov, M. Y. (2001) · European Journal of Operational Research · doi:10.1016/s0377-2217(00)00312-x · Cited by 70
Self-citationFifty years of research in scheduling — Theory and applications
Agnetis, A., Billaut, J., Pinedo, M., & Shabtay, D. (2025) · European Journal of Operational Research · doi:10.1016/j.ejor.2025.01.034 · Cited by 70
Herr, O., & Goel, A. (2015) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.07.001 · Cited by 69
A constraint programming approach for a batch processing problem with non-identical job sizes
Malapert, A., Guéret, C., & Rousseau, L.-M. (2012) · European Journal of Operational Research · doi:10.1016/j.ejor.2012.04.008 · Cited by 69
Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups
Logendran, R., Salmasi, N., & Sriskandarajah, C. (2004) · Computers & Operations Research · doi:10.1016/j.cor.2004.07.004 · Cited by 68
Mixed integer formulation to minimize makespan in a flow shop with batch processing machines
Damodaran, P., & Srihari, K. “. (2004) · Mathematical and Computer Modelling · doi:10.1016/j.mcm.2005.01.005 · Cited by 68
Huynh, N.-T., & Chien, C. (2018) · Computers & Industrial Engineering · doi:10.1016/j.cie.2018.01.005 · Cited by 67
Passchyn, W., Coene, S., Briskorn, D., Hurink, J. L., Spieksma, F. C. R., & Berghe, G. V. (2015) · European Journal of Operational Research · doi:10.2139/ssrn.2710579 · Cited by 66
Heuristics to minimize makespan of parallel batch processing machines
Damodaran, P., & Chang, P.-Y. (2007) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-007-1042-8 · Cited by 66
Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan
Li, S., Ng, C. T., Cheng, T. C. E., & Yuan, J. (2010) · European Journal of Operational Research · doi:10.1016/j.ejor.2010.11.021 · Cited by 64
Luo, H., Huang, G. Q., Zhang, Y., Dai, Q., & Chen, X. (2009) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2009.06.001 · Cited by 64
Minimizing makespan in a flow shop with two batch-processing machines using simulated annealing
Manjeshwar, P. K., Damodaran, P., & Srihari, K. (2008) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2008.05.003 · Cited by 63
A survey of single machine scheduling to minimize weighted number of tardy jobs
Adamu, M. O., & Adewumi, A. O. (2013) · Journal of Industrial and Management Optimization · doi:10.3934/jimo.2014.10.219 · Cited by 63
Exact algorithms for scheduling multiple families of jobs on parallel machines
Chen, Z., & Powell, W. B. (2003) · Naval Research Logistics (NRL) · doi:10.1002/nav.10091 · Cited by 63
On-line integrated production–distribution scheduling problems with capacitated deliveries
Averbakh, I. (2009) · European Journal of Operational Research · doi:10.1016/j.ejor.2008.12.030 · Cited by 62
Hamidinia, A., Khakabimamaghani, S., Mazdeh, M. M., & Jafari, M. (2011) · Computers & Industrial Engineering · doi:10.1016/j.cie.2011.08.014 · Cited by 62
A Genetic Algorithm for Scheduling Parallel Non-identical Batch Processing Machines
Xu, S., & Bean, J. C. (2007) · IEEE Symposium on Computational Intelligence in Scheduling (CISched) · doi:10.1109/scis.2007.367682 · Cited by 62
Nesting and scheduling optimization of additive manufacturing systems: Mapping the territory
Pinto, M., Silva, C., Thürer, M., & Moniz, S. (2024) · Computers & Operations Research · doi:10.1016/j.cor.2024.106592 · Cited by 61
Pranzo, M. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(03)00264-9 · Cited by 61
Öztürk, O., Espinouse, M., Mascolo, M. D., & Gouin, A. (2011) · International Journal of Production Research · doi:10.1080/00207543.2011.641358 · Cited by 61
On-Line Scheduling Algorithms for a Batch Machine with Finite Capacity
Poon, C. K., & Yu, W. (2005) · Journal of Combinatorial Optimization · doi:10.1007/s10878-005-6855-5 · Cited by 61
Li, D., Meng, X., Liang, Q., & Zhao, J. (2014) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-014-0874-y · Cited by 60
Jia, Z., Zhang, Y., Leung, J. Y. ‐., & Li, K. (2017) · Applied Soft Computing · doi:10.1016/j.asoc.2017.01.044 · Cited by 60
Ship Traffic Optimization for the Kiel Canal
Lübbecke, E., Lübbecke, M. E., & Möhring, R. H. (2019) · Operations Research · doi:10.1287/opre.2018.1814 · Cited by 60
A high performing metaheuristic for job shop scheduling with sequence-dependent setup times
Naderi, B., Ghomi, S. M. T. F., & Aminnayeri, M. (2009) · Applied Soft Computing · doi:10.1016/j.asoc.2009.08.039 · Cited by 59
Damodaran, P., Hirani, N. S., & Vélez‐Gallego, M. C. (2009) · European J of Industrial Engineering · doi:10.1504/ejie.2009.023605 · Cited by 58
Öztürk, O., Begen, M. A., & Zaric, G. S. (2016) · International Journal of Production Research · doi:10.1080/00207543.2016.1253889 · Cited by 58
A genetic algorithm for order acceptance and scheduling in additive manufacturing
Kapadia, M. S., Uzsoy, R., Starly, B., & Warsing, D. P. (2021) · International Journal of Production Research · doi:10.1080/00207543.2021.1991023 · Cited by 58
Harmony search algorithm for single-machine scheduling problem with planned maintenance
Zammori, F., Braglia, M., & Castellano, D. (2014) · Computers & Industrial Engineering · doi:10.1016/j.cie.2014.08.001 · Cited by 58
On-the-fly Operation Batching in Dynamic Computation Graphs
Neubig, G., Goldberg, Y., & Dyer, C. (2017) · arXiv (Cornell University) · doi:10.48550/arxiv.1705.07860 · Cited by 37
Nong, Q., Ng, C. T., & Cheng, T. C. E. (2007) · Operations Research Letters · doi:10.1016/j.orl.2007.01.007 · Cited by 57
Arroyo, J. E. C., Leung, J. Y. ‐., & Tavares, R. G. (2018) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2018.10.012 · Cited by 57
Hybrid flow shop scheduling with parallel batching
Amin‐Naseri, M. R., & Beheshtinia, M. A. (2008) · International Journal of Production Economics · doi:10.1016/j.ijpe.2008.10.009 · Cited by 57
A note on a makespan minimization problem with a multi-ability learning effect
Janiak, A., & Rudek, R. (2009) · Omega · doi:10.1016/j.omega.2009.09.004 · Cited by 56
Wang, S., Kurz, M. E., Mason, S. J., & Rashidi, E. (2019) · International Journal of Production Research · doi:10.1080/00207543.2019.1571251 · Cited by 56
Metadata
- Authors
- Potts, C. N., & Kovalyov, M. Y.
- Affiliations
- University of Southampton (GB)
- National Academy of Sciences of Belarus (BY)
- Corresponding author
- Potts, Chris N.
- Venue
- European Journal of Operational Research
- Publisher
- Elsevier BV
- Published
- 2000-01
- Volume
- 120
- Issue
- 2
- Pages
- 228-249
- ISSN
- 0377-2217 (ISSN-L)
- OpenAlex
- W1966523365
- Cited by
- 913
- References
- 72
- Citations by year
- 2026: 14 · 2025: 18 · 2024: 26 · 2023: 23 · 2022: 23 · 2021: 40 · 2020: 32 · 2019: 35 · 2018: 25 · 2017: 38 · 2016: 35 · 2015: 44 · 2014: 46 · 2013: 56 · 2012: 54
- FWCI
- 113.63
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.elsevier.com/tdm/userlicense/1.0/ (tdm)
- Locations
- European Journal of Operational Research (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- ePrints Soton (University of Southampton) (submittedVersion)
- Topics
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Scheduling and Optimization Algorithms
- Social Sciences › Decision Sciences › Management Science and Operations Research › Healthcare Operations and Scheduling Optimization
- Social Sciences › Decision Sciences › Management Science and Operations Research › Advanced Queuing Theory Analysis
- Keywords
- batch scheduling, dynamic programming algorithm, machine setup, scheduling algorithms
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.