Scheduling with batching: A review
The DOI matches its Crossref record; 71 of the 72 references it cites were found in a registry or an index.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“the batching problem in our setting significantly differs from traditional problems (e.g., Potts and Kovalyov [2000]). When assuming that the KV cache memory limit is the sole constraint for the batch size, the number of jobs in a batch during each round varies depending on the specific jobs included in the batch.”
From Online Scheduling for LLM Inference with KV Cache Constraints (2025) · cites this paper as Potts and Kovalyov [2000]
Citations
Cites
Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. R. (1979) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70356-x · Cited by 5,854
Optimal two‐ and three‐stage production schedules with setup times included
Johnson, S. M. (1954) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800010110 · Cited by 3,252
Various optimizers for single‐stage production
Smith, W. E. (1956) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800030106 · Cited by 1,831
Scheduling with Deadlines and Loss Functions
McNaughton, R. (1959) · Management Science · doi:10.1287/mnsc.6.1.1 · Cited by 848
An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
Moore, J. M. (1968) · Management Science · doi:10.1287/mnsc.15.1.102 · Cited by 828
SCHEDULING A PRODUCTION LINE TO MINIMIZE MAXIMUM TARDINESS
Jackson, J. R. (1955) · Cited by 796
Efficient Algorithms for Scheduling Semiconductor Burn-In Operations
Lee, C., Uzsoy, R., & Martin-Vega, L. A. (1992) · Operations Research · doi:10.1287/opre.40.4.764 · Cited by 493
Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
Potts, C. N., & Wassenhove, L. N. V. (1992) · Journal of the Operational Research Society · doi:10.1057/jors.1992.66 · Cited by 449
Self-citationBrucker, P., Gladky, A. A., Hoogeveen, J. A., Kovalyov, M. Y., Potts, C. N., Tautenhahn, T., & van de Velde, S. (1998) · Journal of Scheduling · doi:10.1002/(sici)1099-1425(199806)1:1<31::aid-jos4>3.0.co;2-r · Cited by 423
Self-citationScheduling Groups of Jobs on a Single Machine
Webster, S., & Baker, K. R. (1995) · Operations Research · doi:10.1287/opre.43.4.692 · Cited by 380
Research works printed but not linked: 4
- D. Dannenberg, T. Tautenhahn, F. Werner, A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size, Preprint No. 52, Fakultät für Mathematik, Otto-von-Guericke-Universität Magdeburg, Germany, 1997
- Julien, 1990, Scheduling customer orders: An alternative production scheduling approach, Journal of Manufacturing and Operations Management, 3, 177
- A.J. Mason, Genetic Algorithms and Scheduling Problems, Ph.D. Thesis, Department of Engineering, University of Cambridge, UK, 1992
- C.A. Santos, Batching and Sequencing Decisions under Lead Time Considerations for Single Machine Problems, M.Sc. Thesis, Department of Management Sciences, University of Waterloo, Canada, 1984
Cited by
Items 501–600 of 996
Order-lot pegging for minimizing total tardiness in semiconductor wafer fabrication process
Kim, J.-G., & Lim, S.-K. (2011) · Journal of the Operational Research Society · doi:10.1057/jors.2011.133 · Cited by 9
Quick or Cheap? Breaking Points in Dynamic Markets
Mertikopoulos, P., Nax, H. H., & Pradelski, B. (2020) · Journal of Mathematical Economics · doi:10.1016/j.jmateco.2024.102987 · Cited by 9
Flow-Shop Scheduling with Transportation Capacity and Time Consideration
Wang, C., Porter, G. A., Huang, C.-C. C., Nguyen, V. T., & Husain, S. T. (2021) · Computers, materials & continua/Computers, materials & continua (Print) · doi:10.32604/cmc.2022.020222 · Cited by 9
Scheduling with families of jobs and delivery coordination under job availability
Li, S., & Yuan, J. (2009) · Theoretical Computer Science · doi:10.1016/j.tcs.2009.06.025 · Cited by 9
Li, W., & Yuan, J. (2005) · International Journal of Production Economics · doi:10.1016/j.ijpe.2005.02.003 · Cited by 9
Scheduling incompatible tasks on two machines
Lushchakova, I. N., & Strusevich, V. A. (2009) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.01.029 · Cited by 9
Minimizing flowtime for paired tasks
Courtad, B., Baker, K. R., Magazine, M. J., & Polak, G. G. (2016) · European Journal of Operational Research · doi:10.1016/j.ejor.2016.10.012 · Cited by 9
Minimizing the number of stations and station activation costs for a production line
Kovalev, S., Delorme, X., Dolgui, A. B., & Oulamara, A. (2016) · Computers & Operations Research · doi:10.1016/j.cor.2016.10.007 · Cited by 9
Scheduling with centralized and decentralized batching policies in concurrent open shops
Lin, B. M. T., & Cheng, T. C. E. (2010) · Naval Research Logistics (NRL) · doi:10.1002/nav.20437 · Cited by 9
Multi-Product Lot-Sizing and Scheduling on Unrelated Parallel Machines to Minimize Makespan
Dolgui, A. B., Eremeev, A. V., Kovalyov, M. Y., & Kuznetsov, P. M. (2009) · IFAC Proceedings Volumes · doi:10.3182/20090603-3-ru-2001.0553 · Cited by 9
Self-citationJung, C., Pabst, D., Ham, M., Stehli, M., & Rothe, M. (2013) · ASMC proceedings · doi:10.1109/asmc.2013.6552771 · Cited by 9
Minimizing total completion time on a batching machine with job processing time compatibilities
Bellanger, A., Oulamara, A., & Kovalyov, M. Y. (2010) · Electronic Notes in Discrete Mathematics · doi:10.1016/j.endm.2010.05.164 · Cited by 9
Self-citationOrder Consolidation for Batch Processing
Hwang, H., & Chang, S. Y. (2005) · Journal of Combinatorial Optimization · doi:10.1007/s10878-005-5488-z · Cited by 9
Yusriski, R., Sukoyo, Samadhi, T. M. A. A., & Halim, A. H. (2016) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/114/1/012073 · Cited by 9
Batch scheduling in the histopathology laboratory
Leeftink, A. G., Boucherie, R. J., Hans, E. W., Verdaasdonk, M. A. M., Vliegen, I. M. H., & van Diest, P. J. (2016) · Flexible Services and Manufacturing Journal · doi:10.1007/s10696-016-9257-3 · Cited by 9
Semiconductor Manufacturing Process Description
Mönch, L., Fowler, J., & Mason, S. J. (2012) · Operations research, computer science. Interface series · doi:10.1007/978-1-4614-4472-5_2 · Cited by 9
Mönch, L., Fowler, J., Dauzère‐Pérès, S., Mason, S. J., & Rose, O. (2009) · Cited by 9
Single machine scheduling with batch-dependent setup times
Mosheiov, G., & Oron, D. (2006) · Information Processing Letters · doi:10.1016/j.ipl.2005.12.003 · Cited by 9
A metamodel of operational control for discrete event logistics systems
Sprock, T. (2016) · SMARTech Repository (Georgia Institute of Technology) · Cited by 9
Scheduling locks on inland waterways.
Passchyn, W., Briskorn, D., & Spieksma, F. C. R. (2015) · Lirias · Cited by 9
(2011) · Springer eBooks · doi:10.1007/springerreference_6126 · Cited by 9
Ou, J., & Li, W. (2025) · European Journal of Operational Research · doi:10.1016/j.ejor.2025.07.012 · Cited by 8
The aircraft workpiece paint shop scheduling problem: A case study
Chen, B., Zhang, J., Long, T., Hou, Y., & Jiang, S. (2023) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2023.05.003 · Cited by 8
Approximation algorithms for mixed batch scheduling on parallel machines
Wang, D., Fang, K., Luo, W., & Ouyang, W. (2024) · Journal of the Operational Research Society · doi:10.1080/01605682.2024.2314251 · Cited by 8
Time-of-Use Price Resource Scheduling in Multiplex Networked Industrial Chains
Li, P., Di, K., Bai, X., Chen, F., Jiang, Y., Fu, X., & Jiang, Y. (2024) · Tsinghua Science & Technology · doi:10.26599/tst.2024.9010012 · Cited by 8
Hudaifah, H., Saleh, H., Alghazi, A., Kolus, A., Al‐Turki, U. M., & Elferik, S. (2025) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2025.103143 · Cited by 8
STOCHASTIC BATCH SCHEDULING AND THE “SMALLEST VARIANCE FIRST” RULE
Pinedo, M. (2007) · Probability in the Engineering and Informational Sciences · doi:10.1017/s0269964807000332 · Cited by 8
Describing the influence of set-up optimised sequencing on output lateness of workstations
Mayer, J., & Nyhuis, P. (2017) · Production Planning & Control · doi:10.1080/09537287.2017.1314038 · Cited by 8
Unbounded parallel-batch scheduling with drop-line tasks
Gao, Y., Yuan, J., & Wei, Z. (2018) · Journal of Scheduling · doi:10.1007/s10951-018-0586-9 · Cited by 8
A tight approximation algorithm for problem $$P2\rightarrow D|v=1,c=1|C_{\max }$$
Wang, Y., Lan, Y., Chen, X., Han, X., & Piao, Y. (2020) · Journal of Combinatorial Optimization · doi:10.1007/s10878-020-00593-1 · Cited by 8
Optimal Pooling, Batching, and Pasteurizing of Donor Human Milk
Sun, R., Maillart, L. M., Valeva, S., Schaefer, A. J., & Starks, S. (2021) · Service Science · doi:10.1287/serv.2021.0285 · Cited by 8
Scheduling a single machine with concurrent jobs for the frozen food industry
Chatavithee, P., Piewthongngam, K., & Pathumnakul, S. (2015) · Computers & Industrial Engineering · doi:10.1016/j.cie.2015.09.004 · Cited by 8
Tanrısever, F., & Kutanoğlu, E. (2007) · Annals of Operations Research · doi:10.1007/s10479-007-0273-2 · Cited by 8
OPTIMAL SCHEDULING IN COLOR FILTER MANUFACTURING
Chen, S.-H., Chang, C., & Kuo, C.-L. (2005) · Journal of the Chinese Institute of Industrial Engineers · doi:10.1080/10170660509509300 · Cited by 8
Scheduling unrelated parallel machines to minimize total weighted tardiness
Na, D.-G., Kim, D.-W., Jang, W., & Chen, F. F. (2006) · IEEE International Conference on Service Operations and Logistics, and Informatics (SOLI) · doi:10.1109/soli.2006.329085 · Cited by 8
Minimizing the sum of job completion times for washing operations in hospital sterilization services
Öztürk, O., Mascolo, M. D., Espinouse, M., & Gouin, A. (2010) · HAL · Cited by 8
Family scheduling with batch availability in flow shops to minimize makespan
Shen, L., & Gupta, J. N. D. (2017) · Journal of Scheduling · doi:10.1007/s10951-017-0529-x · Cited by 8
Chen, W., Zheng, B., Liu, J., Li, L., & Ren, X. (2021) · Electronics · doi:10.3390/electronics10243179 · Cited by 8
Scheduling on a Batch Processing Machine with Split Compatibility Graphs
Boudhar, M. (2005) · Journal of Mathematical Modelling and Algorithms · doi:10.1007/s10852-005-3083-z · Cited by 8
Jia, Z.-H., Wen, T.-T., Leung, J. Y. ‐., & Li, K. (2016) · Journal of Industrial and Management Optimization · doi:10.3934/jimo.2016057 · Cited by 8
Wang, Q., Ji, T., Fu, R., & Yao, X. (2017) · Theoretical Computer Science · doi:10.1016/j.tcs.2017.07.022 · Cited by 8
Batch Scheduling for Hybrid Assembly Differentiation Flow Shop to Minimize Total Actual Flow Time
Maulidya, R., Suprayogi, S., Wangsaputra, R., & Halim, A. H. (2018) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/319/1/012042 · Cited by 8
Heuristic Algorithms for Solving Uncertain Routing-Scheduling Problem
Józefczyk, J., & Markowski, M. (2008) · Lecture notes in computer science · doi:10.1007/978-3-540-69731-2_99 · Cited by 8
SyncIntellects: Orchestrating LLM Inference with Progressive Prediction and QoS-Friendly Control
Lin, X., Zhang, Z., Yue, P., Li, H., Zhang, J., Fan, B., Su, H., & Gong, X. (2024) · International Workshop on Quality of Service · doi:10.1109/iwqos61813.2024.10682949 · Cited by 7
One-dimensional bin packing with pattern-dependent processing time
Marinelli, F., Pizzuti, A., Wu, W. Y., & Yagiura, M. (2024) · European Journal of Operational Research · doi:10.1016/j.ejor.2024.11.023 · Cited by 7
The Shortest First Coordination Mechanism for a Scheduling Game with Parallel-Batching Machines
Nong, Q., Guo, S., & Miao, L.-H. (2016) · Journal of the Operations Research Society of China · doi:10.1007/s40305-016-0134-2 · Cited by 7
Emde, S., Zehtabian, S., & Disser, Y. (2022) · Annals of Operations Research · doi:10.1007/s10479-022-04891-1 · Cited by 7
Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
Yong, L., Li, Z., Li, X., & Peng, C. (2022) · Mathematical Problems in Engineering · doi:10.1155/2022/8682203 · Cited by 7
Multiagent Scheduling Fundamentals
Agnetis, A., Billaut, J., Gawiejnowicz, S., Pacciarelli, D., & Soukhal, A. (2013) · Springer eBooks · doi:10.1007/978-3-642-41880-8_1 · Cited by 7
Parallel-Batch Scheduling and Transportation Coordination with Waiting Time Constraint
Gong, H., Chen, D., & Xu, K. (2014) · The Scientific World JOURNAL · doi:10.1155/2014/356364 · Cited by 7
Venkataramana, M., & Raghavan, N. R. S. (2008) · International Journal of Industrial and Systems Engineering · doi:10.1504/ijise.2009.021689 · Cited by 7
Fei, Y., & Ma, H. (2018) · IEEE International Conference on Industrial Engineering and Applications (ICIEA) · doi:10.1109/iea.2018.8387105 · Cited by 7
An exact dynamic programming algorithm for the precedence-constrained class sequencing problem
Bürgy, R., Hertz, A., & Baptiste, P. (2020) · Computers & Operations Research · doi:10.1016/j.cor.2020.105063 · Cited by 7
Modeling of Scheduling Batch Processor in Discrete Parts Manufacturing
Mathirajan, M., Gokhale, R. S., & Ramasubramaniam, M. (2013) · Springer eBooks · doi:10.1007/978-1-4471-5352-8_7 · Cited by 7
Approximation algorithms for problems in scheduling with set-ups
Divakaran, S., & Saks, M. (2007) · Discrete Applied Mathematics · doi:10.1016/j.dam.2007.08.010 · Cited by 7
Wu, J., Abbas‐Turki, A., & Perronnet, F. (2013) · International Journal of Applied Mathematics and Computer Science · doi:10.2478/amcs-2013-0058 · Cited by 7
Sarin, S. C., Wang, L., & Cheng, M. (2011) · Computers & Operations Research · doi:10.1016/j.cor.2011.08.012 · Cited by 7
Pinto, G., Ben-Dov, Y. T., & Rabinowitz, G. (2012) · Annals of Operations Research · doi:10.1007/s10479-012-1256-5 · Cited by 7
Single-machine batch scheduling of linear deteriorating jobs
Ji, M., Yang, Q., Yao, D., & Cheng, T. C. E. (2015) · Theoretical Computer Science · doi:10.1016/j.tcs.2015.02.025 · Cited by 7
Jolai, F., Kor, H., Hatefi, S. M., & Iranmanesh, S. H. (2009) · International Conference on Computer Engineering and Technology · doi:10.1109/iccet.2009.215 · Cited by 7
Taner, M. R., Hodgson, T. J., King, R. E., & Schultz, S. R. (2006) · Computers & Industrial Engineering · doi:10.1016/j.cie.2006.10.008 · Cited by 7
Lot Sizing and Lead Time Quotations in Assembly Systems
Kianfar, F., & Mokhtari, G. (2009) · Scientia Iranica · Cited by 7
Righi, R. D. R. (2012) · InTech eBooks · doi:10.5772/1392 · Cited by 7
Scheduling with returnable containers
Mensendiek, A. (2015) · Journal of Scheduling · doi:10.1007/s10951-015-0426-0 · Cited by 7
Batch scheduling of nonidentical job sizes with minsum criteria
Li, R., Tan, Z., & Zhu, Q. (2019) · Journal of Combinatorial Optimization · doi:10.1007/s10878-019-00419-9 · Cited by 7
A queueing model for a two-stage stochastic manufacturing system with overlapping operations
Nieuwenhuyse, I. V., & Vandaele, N. J. (2005) · International Journal of Flexible Manufacturing Systems · doi:10.1007/s10696-006-8818-2 · Cited by 7
Kim, D.-W., Na, D.-G., Jang, W., & Chen, F. F. (2006) · International Journal of Computer Applications in Technology · doi:10.1504/ijcat.2006.010078 · Cited by 7
Parallel machine scheduling by family batching with sequence-independent set-up times
Crauwels, H., Beullens, P., & Oudheusden, D. V. (2006) · ePrints Soton (University of Southampton) · Cited by 7
Transfer batch scheduling using genetic algorithms
Millas, V. S., & Vosniakos, G.-C. (2006) · International Journal of Production Research · doi:10.1080/00207540600920843 · Cited by 7
Look-ahead strategies for controlling batch operations in industry - an overview
van der Zee, D.-J. (2004) · International Conference on Machine Learning and Cybernetics · doi:10.1109/wsc.2003.1261592 · Cited by 7
On-Line Scheduling a Batch Processing System to Minimize Total Weighted Job Completion Time
Chen, B., Deng, X., & Zang, W. (2001) · Lecture notes in computer science · doi:10.1007/3-540-45678-3_33 · Cited by 7
Some Problems in One-Operator Scheduling
Baki, F. (1999) · UWSpace (University of Waterloo) · Cited by 7
Parallel-Machine Scheduling to Minimize Flowtime, Holding, and Batch Delivery Costs
Yin, Y., Cheng, S., & Wu, C. (2014) · Asia Pacific Journal of Operational Research · doi:10.1142/s0217595914500444 · Cited by 6
The Multi-source Beachcombers’ Problem
Czyzowicz, J., Gąsieniec, L. A., Georgiou, K., Kranakis, E., & MacQuarrie, F. (2015) · Lecture notes in computer science · doi:10.1007/978-3-662-46018-4_1 · Cited by 6
Scheduling with Setup Considerations: An MIP Approach
Mohamed., K., Siew, C., & Suppiah, Y. (2007) · doi:10.5772/5225 · Cited by 6
Single-machine batch scheduling to minimize the total setup cost in the presence of deadlines
Kreß, D., Barketau, M., & Pesch, E. (2018) · Journal of Scheduling · doi:10.1007/s10951-018-0561-5 · Cited by 6
Gao, Y., & Yuan, J. (2019) · Journal of Combinatorial Optimization · doi:10.1007/s10878-019-00407-z · Cited by 6
Li, W., & Yuan, J. (2013) · Optimization Letters · doi:10.1007/s11590-013-0650-5 · Cited by 6
Optimal single machine scheduling of products with components and changeover cost
Zhou, F., Blocher, J. D., Hu, X., & Heese, H. S. (2013) · European Journal of Operational Research · doi:10.1016/j.ejor.2013.08.016 · Cited by 6
Gamberini, R., Lolli, F., Rimini, B., Torelli, M., & Castagnetti, E. (2011) · International Journal of Production Research · doi:10.1080/00207543.2010.543296 · Cited by 6
Solving Single Machine Scheduling Problem with Maximum Lateness Using a Genetic Algorithm
Nazif, H., & Lee, L. S. (2010) · Journal of Mathematics Research · doi:10.5539/jmr.v2n3p57 · Cited by 6
Hybrid Metaheuristics for Solving a Fuzzy Single Batch-Processing Machine Scheduling Problem
Molla‐Alizadeh‐Zavardehi, S., Tavakkoli-Moghaddam, R. R., & Lotfı, F. H. (2014) · The Scientific World JOURNAL · doi:10.1155/2014/214615 · Cited by 6
Haddad, H., Ghanbari, P., & Moghaddam, A. Z. (2011) · International Journal of Industrial Engineering Computations · doi:10.5267/j.ijiec.2011.07.003 · Cited by 6
A Genetic Algorithm For Solving Scheduling Problem
Nazif, H. (2012) · Journal of Mathematics and Computer Science · doi:10.22436/jmcs.05.02.03 · Cited by 6
Single-machine batch scheduling problem with job rejection and resource dependent processing times
Huang, W., Wu, C., & Liu, S.-C. (2017) · RAIRO - Operations Research · doi:10.1051/ro/2017040 · Cited by 6
Minimising total weighted completion time on batch and unary machines with incompatible job families
Huang, Z., Shi, Z., & Shi, L. (2018) · International Journal of Production Research · doi:10.1080/00207543.2018.1470341 · Cited by 6
Towards Energy-Efficient Scheduling with Batch Processing for Instance-Intensive Cloud Workflows
Wang, Z., Wen, Y., Chen, J., Cao, B., & Wang, F. (2018) · IEEE International Symposium on Parallel and Distributed Processing with Applications (ISPA) · doi:10.1109/bdcloud.2018.00092 · Cited by 6
Single machine batch scheduling with release times
Gfeller, B., Peeters, L. W. P., Weber, B., & Widmayer, P. (2007) · Journal of Combinatorial Optimization · doi:10.1007/s10878-007-9114-0 · Cited by 6
Scheduling Test Execution of WBEM Applications
Yu, L., Su, Y., & Wang, Q. (2009) · Asia-Pacific Software Engineering Conference (APSEC) · doi:10.1109/apsec.2009.27 · Cited by 6
Unbounded batch scheduling with a common due window on a single machine*
Zhao, H., & Li, G. (2008) · Journal of Systems Science and Complexity · doi:10.1007/s11424-008-9113-y · Cited by 6
Billaut, J., Gribkovskaia, I. V., & Strusevich, V. A. (2008) · IIE Transactions · doi:10.1080/07408170701592473 · Cited by 6
Analysis of gap times in a two-stage stochastic flowshop with overlapping operations
Nieuwenhuyse, I. V., & Vandaele, N. J. (2006) · IIE Transactions · doi:10.1080/07408170600584852 · Cited by 6
Xu, W., Zou, F., & Tang, L. (2016) · IEEE Congress on Evolutionary Computation (CEC) · doi:10.1109/cec.2016.7744140 · Cited by 6
Techniques d'ordonnancement d'atelier et de fournées basées sur la programmation par contraintes
Malapert, A. (2011) · HAL · Cited by 6
Serial batching to minimize the weighted number of tardy jobs
Hermelin, D., Mnich, M., & Omlor, S. (2024) · Journal of Scheduling · doi:10.1007/s10951-024-00818-9 · Cited by 5
Minimizing Cumulative Batch Processing Time for an Industrial Oven Scheduling Problem
Lackner, M.-L., Mrkvicka, C., Musliu, N., Walkiewicz, D., & Winter, F. (2021) · DROPS (Schloss Dagstuhl – Leibniz Center for Informatics) · doi:10.4230/lipics.cp.2021.37 · Cited by 5
Druetto, A., & Grosso, A. (2021) · Computers & Operations Research · doi:10.1016/j.cor.2021.105639 · Cited by 5
Bounded mixed batch scheduling with job release dates and rejection
Xu, J., Huang, Y.-X., Zhang, D., Lin, R., & Fan, G. (2024) · Operations Research Letters · doi:10.1016/j.orl.2024.107159 · Cited by 5
Job Scheduling at Cascading Machines
Huang, E., & Wu, K. (2017) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2017.2698919 · Cited by 5
Afkhami, S., Kashan, A. H., & Ostadi, B. (2023) · RAIRO - Operations Research · doi:10.1051/ro/2023050 · Cited by 5
Metadata
- Authors
- Potts, C. N., & Kovalyov, M. Y.
- Affiliations
- University of Southampton (GB)
- National Academy of Sciences of Belarus (BY)
- Corresponding author
- Potts, Chris N.
- Venue
- European Journal of Operational Research
- Publisher
- Elsevier BV
- Published
- 2000-01
- Volume
- 120
- Issue
- 2
- Pages
- 228-249
- ISSN
- 0377-2217 (ISSN-L)
- OpenAlex
- W1966523365
- Semantic Scholar
- 4754c3f548f5aee7ceac53f8351fa372b0cf2467
- Cited by
- 913
- References
- 72
- Citations by year
- 2026: 14 · 2025: 18 · 2024: 26 · 2023: 23 · 2022: 23 · 2021: 40 · 2020: 32 · 2019: 35 · 2018: 25 · 2017: 38 · 2016: 35 · 2015: 44 · 2014: 46 · 2013: 56 · 2012: 54
- FWCI
- 113.63
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.elsevier.com/tdm/userlicense/1.0/ (tdm)
- Locations
- European Journal of Operational Research (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- ePrints Soton (University of Southampton) (submittedVersion)
- Topics
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Scheduling and Optimization Algorithms
- Social Sciences › Decision Sciences › Management Science and Operations Research › Healthcare Operations and Scheduling Optimization
- Social Sciences › Decision Sciences › Management Science and Operations Research › Advanced Queuing Theory Analysis
- Keywords
- batch scheduling, dynamic programming algorithm, machine setup, scheduling algorithms
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.