Planned Flexibility: Linking Anticipation and Reaction in Product Development Projects
The DOI matches its OpenAlex record; 25 of the 25 references it cites were found in a registry or an index.
Abstract
The early phases of a product development project (i.e., concept generation and product planning) are commonly acknowledged to play a central role in the success of product innovation. Early decisions are unlikely to be changed during downstream phases, unless high costs and time are experienced. They have therefore the highest influence on project performance. However, early analysis and problem solving is also a difficult task, because the necessary information and insights are not available until one gets into detailed design. Most companies are locked in this dilemma between anticipation (i.e., anticipating decisions in the early phases of product development, where influence on performance is substantial) and reaction (i.e., delaying decisions to downstream phases, where information and opportunities are manifest). This article investigates early development practices in 18 Italian and Swedish companies, operating in the vehicle, helicopter, and white-goods industries. It shows that neither anticipation nor reaction may be considered a best practice in absolute terms. Rather, it identifies four possible approaches to manage the early phases (detailed, selective, comprehensive, and postponed), where anticipation and reaction have different balances. In addition, the article shows how anticipation and reaction are not contradictory or mutually exclusive, but strongly interact with each other through a mechanism that we call planned flexibility, i.e., the capability to build flexibility into the development process due to decisions taken early in the project.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Zadeh, L. A. (1965) · Information and Control · doi:10.1016/s0019-9958(65)90241-x · Cited by 67,855
Zadeh, L. A. (1996) · Cited by 46,857
Product development: Past research, present findings and future directions
Brown, S. L., & Eisenhardt, K. M. (1995) · The Academy of Management Review · doi:10.2307/258850 · Cited by 3,777
Hauser, J. R. (1988) · Harvard business review · Cited by 3,459
Accelerating Adaptive Processes: Product Innovation in the Global Computer Industry
Eisenhardt, K. M., & Tabrizi, B. N. (1995) · Administrative Science Quarterly · doi:10.2307/2393701 · Cited by 2,426
Stage-gate systems: A new tool for managing new products
Cooper, R. G. (1990) · Business Horizons · doi:10.1016/0007-6813(90)90040-i · Cited by 1,834
Determinants of New Product Performance: A Review and Meta‐Analysis
Montoya‐Weiss, M. M., & Calantone, R. (1994) · Journal of Product Innovation Management · doi:10.1016/0737-6782(94)90029-9 · Cited by 1,359
Benchmarking the Firm's Critical Success Factors in New Product Development
Cooper, R. G., & Kleinschmidt, E. J. (1995) · Journal of Product Innovation Management · doi:10.1016/0737-6782(95)00059-3 · Cited by 1,226
Perspective third-generation new product processes
Cooper, R. G. (1994) · Journal of Product Innovation Management · doi:10.1016/0737-6782(94)90115-5 · Cited by 1,096
Revolutionizing product development
Wheelwright, S. C. (1992) · Cited by 1,061
Towards Holistic “Front Ends” In New Product Development
Khurana, A., & Rosenthal, S. R. (1998) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(97)00066-0 · Cited by 706
The second Toyota paradox: How delaying decisions can make better cars faster
(1995) · Long Range Planning · doi:10.1016/0024-6301(95)94310-u · Cited by 638
JAPANESE-STYLE PARTNERSHIPS -- GIVING COMPANIES A COMPETITIVE EDGE.
Dyer, J. H., & Ouchi, W. G. (1993) · ScholarsArchive (Brigham Young University) · Cited by 633
Accelerating the Development of Technology-Based New Products
Gupta, A. K., & Wilemon, D. L. (1990) · California Management Review · doi:10.2307/41166603 · Cited by 556
Determinants of Timeliness in Product Development
Cooper, R. G., & Kleinschmidt, E. J. (1994) · Journal of Product Innovation Management · doi:10.1016/0737-6782(94)90028-0 · Cited by 501
Accelerating the development of technology-based new products
(1990) · Long Range Planning · doi:10.1016/0024-6301(90)90331-w · Cited by 469
How learning by doing is done: problem identification in novel process equipment
von Hippel, E., & Tyre, M. J. (1995) · Research Policy · doi:10.1016/0048-7333(93)00747-h · Cited by 463
The new product learning cycle
Maidique, M. A., & Zirger, B. J. (1985) · Research Policy · doi:10.1016/0048-7333(85)90001-0 · Cited by 438
The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster
Ward, A., Liker, J. K., Cristiano, J. J., & Sobek, D. K. (1995) · Long Range Planning · Cited by 322
An Organizational Learning Approach to Product Innovation
McKee, D. O. (1992) · Journal of Product Innovation Management · doi:10.1016/0737-6782(92)90033-9 · Cited by 298
Supplier involvement in automotive component design: are there really large US Japan differences?
Liker, J. K., Kamath, R. R., Nazli Wasti, S., & Nagamachi, M. (1996) · Research Policy · doi:10.1016/0048-7333(95)00826-8 · Cited by 202
Managing Product Definition in High-Technology Industries: A Pilot Study
Bacon, G. C., Beckman, S. L., Mowery, D. C., & Wilson, E. (1994) · California Management Review · doi:10.2307/41165754 · Cited by 197
Continuous improvement and inter-project learning in new product development
Bartezzaghi, E., Mariano Corso, A., & Verganti, R. (1997) · International Journal of Technology Management · doi:10.1504/ijtm.1997.001704 · Cited by 154
Self-citationTurning New Product Development into a Continuous Learning Process
Hughes, G. D., & Chafin, D. C. (1996) · Journal of Product Innovation Management · doi:10.1111/1540-5885.1320089 · Cited by 138
Integrated Product and Process Development: Methods, Tools and Technologies
(1999) · Industrial Robot the international journal of robotics research and application · doi:10.1108/ir.1999.04926eae.003 · Cited by 47
Cited by
On Uncertainty, Ambiguity, and Complexity in Project Management
Pich, M. T., Loch, C. H., & Meyer, A. D. (2002) · Management Science · doi:10.1287/mnsc.48.8.1008.163 · Cited by 942
Developing Products on “Internet Time”: The Anatomy of a Flexible Development Process
MacCormack, A., Verganti, R., & Iansiti, M. (2001) · Management Science · doi:10.1287/mnsc.47.1.133.10663 · Cited by 518
Self-citationCan Agile Project Management be Adopted by Industries Other than Software Development?
Conforto, E. C., Salum, F., Amaral, D. C., da Silva, S. L., & de Almeida, L. F. M. (2014) · Project Management Journal · doi:10.1002/pmj.21410 · Cited by 426
Salomo, S., Weise, J., & Gemünden, H. G. (2007) · Journal of Product Innovation Management · doi:10.1111/j.1540-5885.2007.00252.x · Cited by 303
Stage-Gate Controls, Learning Failure, and Adverse Effect on Novel New Products
Sethi, R., & Iqbal, Z. (2008) · Journal of Marketing · doi:10.1509/jmkg.72.1.118 · Cited by 287
Metadata
- Authors
- Verganti, R.
- Venue
- Journal of Product Innovation Management
- Publisher
- Wiley
- Published
- 1999-07-01
- Volume
- 16
- Issue
- 4
- Pages
- 363-376
- ISSN
- 0737-6782 (ISSN-L)
- OpenAlex
- W1981665706
- Cited by
- 193
- References
- 25
- FWCI
- 6.27
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.