Strategic implementation of IT/IS projects in construction: a case study
The DOI matches its Crossref record; 18 of the 18 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
How to Make a Decision: The Analytic Hierarchy Process
Saaty, T. L. (1990) · European Journal of Operational Research · doi:10.1016/0377-2217(90)90057-i · Cited by 9,605
The balanced scorecard: Translating strategy into action
(1997) · Long Range Planning · doi:10.1016/s0024-6301(97)80925-9 · Cited by 8,192
The rise and fall of strategic planning
(1995) · Long Range Planning · doi:10.1016/0024-6301(95)92105-2 · Cited by 3,008
The rise and fall of strategic planning
Lawrence, M. (1994) · International Journal of Forecasting · doi:10.1016/0169-2070(94)90036-1 · Cited by 1,350
SWOT analysis: It's time for a product recall
Hill, T., & Westbrook, R. (1997) · Long Range Planning · doi:10.1016/s0024-6301(96)00095-7 · Cited by 1,047 · cited 2×
“In a study by Hill and Westbrook [17], they found that none of the 20 case companies prioritised individual SWOT factors.”
BackgroundMethodStrategic Management and Business Policy
Singh, D. B., & Singh, D. (2012) · Cited by 850
Strategic Management and Business Policy
Wheelen, T. L., & Hunger, J. D. (2005) · Cited by 843
Entrepreneurship: Starting, Developing, and Managing a New Enterprise
Peters, M., & Hisrich, R. D. (1989) · Medical Entomology and Zoology · Cited by 419
Corporate Information Systems Management: Text and Cases
Cash, J. I., McKenney, J. L., & McFarlan, F. W. (1992) · McGraw-Hill Professional eBooks · Cited by 416
(2000) · Journal of Management Information Systems · doi:10.1080/07421222.2000.11045650 · Cited by 311 · cited 1×
“However, when developing performance measures, it is important to include a mix of quantitative and qualitative measures [32].”
BackgroundStrategic stories: how 3M is rewriting business planning.
Shaw, G., Brown, R., & Bromiley, P. (1998) · PubMed · Cited by 296
ICRAM-1: Model for International Construction Risk Assessment
Hastak, M., & Shaked, A. (2000) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2000)16:1(59 · Cited by 285 · cited 1×
“AHP is an effective tool in structuring and modelling multi-criteria problems and has been successfully used in a variety of construction management applications [19,20].”
MethodGoldratt, E. M. (1994) · Medical Entomology and Zoology · Cited by 211
Improving the return on IT investment: the productivity paradox
Santos, B. D., & Sussman, L. (2000) · International Journal of Information Management · doi:10.1016/s0268-4012(00)00037-2 · Cited by 188 · cited 1×
“This paper presents a strategic implementation framework for IT/IS projects in construction.”
BackgroundPlanning for Computer Integrated Construction
Jung, Y., & Gibson, G. E. (1999) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(1999)13:4(217 · Cited by 118 · cited 1×
“Keywords: Information Technology; Information Systems; Strategic implementation; SWOT analysis; Analytical hierarchy process”
BackgroundInformation systems and other capital investments: evaluation practices compared
Ballantine, J. A., & Stray, S. (1999) · Logistics Information Management · doi:10.1108/09576059910256286 · Cited by 113
Evaluation of IT costs in construction
Love, P. E. D., & Zahir Irani, A. (2001) · Automation in Construction · doi:10.1016/s0926-5805(01)00058-9 · Cited by 58 · cited 1×
“A number of theoretical and practical IT/IS performance monitoring and evaluation frameworks are recommended for this purpose [26–30].”
BackgroundImplementation of formal plans: the case of information technology strategy
Gottschalk, P. (1999) · Long Range Planning · doi:10.1016/s0024-6301(99)00040-0 · Cited by 55 · cited 1×
“The paper presents the framework in a detailed step-by-step methodology supported by the 10 welldocumented predictors for effective IT/IS implementation [9].”
Method
Cited by
Using the analytic network process (ANP) in a SWOT analysis – A case study for a textile firm
Yüksel, İ., & Dagˇdeviren, M. (2007) · Information Sciences · doi:10.1016/j.ins.2007.01.001 · Cited by 694
Application of a quantification SWOT analytical method
Chang, H.-H., & Huang, W.-C. (2006) · Mathematical and Computer Modelling · doi:10.1016/j.mcm.2005.08.016 · Cited by 321
Kangas, J., & Kangas, A. (2005) · Forest Ecology and Management · doi:10.1016/j.foreco.2004.10.023 · Cited by 264
An Extension of Neutrosophic AHP–SWOT Analysis for Strategic Planning and Decision-Making
Abdel-Basset, M., Mohamed, M., & Smarandache, F. (2018) · Symmetry · doi:10.3390/sym10040116 · Cited by 218
“integrated SWOT with the AHP in an environmental domain [18–20], Kajanus used SWOT–AHP in tourism [21], and Setwart used SWOT–AHP in project management [22].”
MethodEvaluating the management strategies of a forestland estate—the S-O-S approach
Kangas, J., Kurttila, M., Kajanus, M., & Kangas, A. (2003) · Journal of Environmental Management · doi:10.1016/j.jenvman.2003.09.010 · Cited by 197
Metadata
- Authors
- Stewart, R. A., Mohamed, S., & Daet, R.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2002-10
- Volume
- 11
- Issue
- 6
- Pages
- 681-694
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W1970740758
- Cited by
- 163
- References
- 18
- FWCI
- 8.12
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.