The DOI matches its Crossref record; 14 of the 14 references it cites were found in a registry or an index.
A fuzzy approach to construction project risk assessment and analysis: construction project risk management system
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Zadeh, L. A. (1996) · Cited by 46,844
Neural Networks and Fuzzy Systems
Kosko, B., & Burgess, J. C. (1998) · The Journal of the Acoustical Society of America · doi:10.1121/1.423096 · Cited by 2,356
Neural networks and fuzzy systems
Zambelli, S. (1993) · Journal of Economic Dynamics and Control · doi:10.1016/0165-1889(93)90010-p · Cited by 1,024
Risk Management and Construction
Flanagan, R. (1993) · Medical Entomology and Zoology · Cited by 640
Expert Systems: Design and Development
Durkin, J., & Durkin, J. (1994) · Medical Entomology and Zoology · Cited by 582
Cox, E. (1994) · Cited by 516
Project risk analysis and management—PRAM the generic process
Chapman, C. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00079-8 · Cited by 205
Towards a framework for project risk knowledge management in the construction supply chain
Tah, J. H. M., & Carr, V. (2001) · Advances in Engineering Software · doi:10.1016/s0965-9978(01)00035-7 · Cited by 168
Self-citationEngineering Construction Risks - A Guide to Project Risk Analysis and Risk Management
Thompson, P., & Perry, J. (1992) · doi:10.1680/ecragtpraarm.16651 · Cited by 141
Pricing Construction Risk: Fuzzy Set Application
Paek, J. H., Lee, Y. W., & Ock, J. H. (1993) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1993)119:4(743 · Cited by 121
Research works printed but not linked: 3
- Zadeh, 1965, Fuzzy sets, Inform Ctrl, 8, 338
- Chun, 1992, Assessment of the potential application of fuzzy set theory to accident progression event trees with phenomenological uncertainties, Reliab Engng Syst Safety, 37, 237, 10.1016/0951-8320(92)90130-D · doi:10.1016/0951-8320(92)90130-d
- Ross, 1995, A fuzzy multi-objective approach to risk management, vol. 2, 1400
Cited by
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
A fuzzy approach to construction project risk assessment
Nieto-Morote, A., & Ruz-Vila, F. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.02.002 · Cited by 464
Occupational risk assessment in construction industry – Overview and reflection
Pinto, A., Nunes, I. L., & Ribeiro, R. A. (2011) · Safety Science · doi:10.1016/j.ssci.2011.01.003 · Cited by 432
Zheng, G., Zhu, N., Tian, Z., Chen, Y., & Sun, B. (2012) · Safety Science · doi:10.1016/j.ssci.2011.08.042 · Cited by 381
A simulation-based risk network model for decision support in project risk management
Fang, C., & Marle, F. (2012) · Decision Support Systems · doi:10.1016/j.dss.2011.10.021 · Cited by 268
Metadata
- Authors
- Carr, V, & Tah, J. H. M.
- Venue
- Advances in Engineering Software
- Publisher
- Elsevier BV
- Published
- 2001-10
- Volume
- 32
- Issue
- 10-11
- Pages
- 847-857
- ISSN
- 0965-9978 (ISSN-L)
- OpenAlex
- W2001493935
- Cited by
- 322
- References
- 14
- FWCI
- 2.21
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.elsevier.com/tdm/userlicense/1.0/ (tdm)
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: A fuzzy approach to construction project risk assessment and analysis: construction project risk management system. https://app.cochat.ai/papers/10.1016/s0965-9978(01)00036-9
- The paper
- Carr, V, & Tah, J. H. M. (2001). A fuzzy approach to construction project risk assessment and analysis: construction project risk management system. Advances in Engineering Software. https://doi.org/10.1016/s0965-9978(01)00036-9
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.