The four roles of supply chain management in construction
Open accessThe DOI matches its Crossref record; 14 of the 14 references it cites were found in a registry or an index.
Abstract
It is argued that due to construction peculiarities, supply chain management has four specific roles in construction. Practical initiatives in each role to advance the construction supply chain are analysed. The present status of construction supply chains is investigated by means of case studies and a comparison with previous research. Three main conclusions are drawn regarding the present status. Firstly, even in normal situations the construction supply chain has a large quantity of waste and problems. Secondly, most of these are caused in another stage of the construction supply chain than when detected. Thirdly, waste and problems are largely caused by obsolete, myopic control of the construction supply chain. These results concur with the findings made on make-to-order supply chains in general. Finally, the subjective and objective limitations of the four roles are analysed, this being based on empirical findings and the generic theory of supply chain management.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Deming, W. E. (1982) · Medical Entomology and Zoology · Cited by 7,297
Supply Chain Management: More Than a New Name for Logistics
Cooper, M. C., Lambert, D. M., & Pagh, J. D. (1997) · The International Journal of Logistics Management · doi:10.1108/09574099710805556 · Cited by 2,861
Logistics and Supply Chain Management: Strategies for Reducing Costs and Improving Services.
Salhi, S., & Christopher, M. (1994) · The Journal of the Operational Research Society · doi:10.2307/2583864 · Cited by 1,662
Application of the New Production Philosophy to Construction
Koskela, L., & Koskela, L. (1992) · Cited by 1,398
Self-citationCooper, M. C., & Ellram, L. M. (1993) · The International Journal of Logistics Management · doi:10.1108/09574099310804957 · Cited by 1,036
Logistics and Supply Chain Management
Annai Violet Arts & Science College 53, V. C. R., & S, U. (2022) · Jupiter Publications Consortium eBooks · doi:10.47715/jpc.b.978-93-91303-39-6 · Cited by 601
Supply Chain Management: A Strategic Perspective
Bechtel, C., & Jayaram, J. (1997) · The International Journal of Logistics Management · doi:10.1108/09574099710805565 · Cited by 526
Shielding Production: Essential Step in Production Control
Ballard, G., & Howell, G. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:1(11 · Cited by 510
Purchasing's Role in Supply Chain Management
Giunipero, L. C., & Brand, R. R. (1996) · The International Journal of Logistics Management · doi:10.1108/09574099610805412 · Cited by 224
TOWILL, D. R. (1991) · International Journal of Computer Integrated Manufacturing · doi:10.1080/09511929108944496 · Cited by 208
Reengineering the Order Fulfillment Process in Supply Chain Networks
Lin, F.-R., & Shaw, M. J. (1998) · International Journal of Flexible Manufacturing Systems · doi:10.1023/a:1008069816606 · Cited by 191
Developing Lean and Agile Supply Chains in the Uk Housebuilding Industry
Naim, M. M., Naylor, J., & Barlow, J. G. (1999) · Cited by 49
O’Brien, W. J. (2010) · Taylor & Francis eBooks · doi:10.4324/9780203345825_construction_supply-chains · Cited by 40
Open and industrialised building
Bertelsen, N. H. (1999) · Cited by 13
Cited by
The construction industry as a loosely coupled system: implications for productivity and innovation
Dubois, A., & Gadde, L.-E. (2002) · Construction Management and Economics · doi:10.1080/01446190210163543 · Cited by 1,041
“They are loose in terms of the coupling between the production of building materials and what is done on site; see e.g. Vrijhoef and Koskela (2000) and Akintoye et al. (2000).”
BackgroundInfluentialBuild‐to‐order supply chain management: a literature review and framework for development
Gunasekaran, A., & Ngai, E. W. T. (2005) · Journal of Operations Management · doi:10.1016/j.jom.2004.10.005 · Cited by 540
Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
Irizarry, J., Karan, E. P., & Jalaei, F. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.005 · Cited by 481
Dallasega, P., Rauch, E., & Linder, C. (2018) · Computers in Industry · doi:10.1016/j.compind.2018.03.039 · Cited by 468
Engineer-to-order supply chain management: A literature review and research agenda
Gosling, J., & Naim, M. M. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.07.002 · Cited by 379
Metadata
- Authors
- Vrijhoef, R., & Koskela, L.
- Venue
- European Journal of Purchasing & Supply Management
- Publisher
- Elsevier BV
- Published
- 2000-12
- Volume
- 6
- Issue
- 3-4
- Pages
- 169-178
- ISSN
- 0969-7012 (ISSN-L)
- OpenAlex
- W2036515111
- Cited by
- 862
- References
- 14
- FWCI
- 10.54
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.