Abstract
It is argued that due to construction peculiarities, supply chain management has four specific roles in construction. Practical initiatives in each role to advance the construction supply chain are analysed. The present status of construction supply chains is investigated by means of case studies and a comparison with previous research. Three main conclusions are drawn regarding the present status. Firstly, even in normal situations the construction supply chain has a large quantity of waste and problems. Secondly, most of these are caused in another stage of the construction supply chain than when detected. Thirdly, waste and problems are largely caused by obsolete, myopic control of the construction supply chain. These results concur with the findings made on make-to-order supply chains in general. Finally, the subjective and objective limitations of the four roles are analysed, this being based on empirical findings and the generic theory of supply chain management.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Deming, W. E. (1982) · Medical Entomology and Zoology · Cited by 7,297
Supply Chain Management: More Than a New Name for Logistics
Cooper, M. C., Lambert, D. M., & Pagh, J. D. (1997) · The International Journal of Logistics Management · doi:10.1108/09574099710805556 · Cited by 2,861
Logistics and Supply Chain Management: Strategies for Reducing Costs and Improving Services.
Salhi, S., & Christopher, M. (1994) · The Journal of the Operational Research Society · doi:10.2307/2583864 · Cited by 1,662
Application of the New Production Philosophy to Construction
Koskela, L., & Koskela, L. (1992) · Cited by 1,398
Self-citationCooper, M. C., & Ellram, L. M. (1993) · The International Journal of Logistics Management · doi:10.1108/09574099310804957 · Cited by 1,036
Logistics and Supply Chain Management
Annai Violet Arts & Science College 53, V. C. R., & S, U. (2022) · Jupiter Publications Consortium eBooks · doi:10.47715/jpc.b.978-93-91303-39-6 · Cited by 601
Supply Chain Management: A Strategic Perspective
Bechtel, C., & Jayaram, J. (1997) · The International Journal of Logistics Management · doi:10.1108/09574099710805565 · Cited by 526
Shielding Production: Essential Step in Production Control
Ballard, G., & Howell, G. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:1(11 · Cited by 510
Purchasing's Role in Supply Chain Management
Giunipero, L. C., & Brand, R. R. (1996) · The International Journal of Logistics Management · doi:10.1108/09574099610805412 · Cited by 224
TOWILL, D. R. (1991) · International Journal of Computer Integrated Manufacturing · doi:10.1080/09511929108944496 · Cited by 208
Cited by
The construction industry as a loosely coupled system: implications for productivity and innovation
Dubois, A., & Gadde, L.-E. (2002) · Construction Management and Economics · doi:10.1080/01446190210163543 · Cited by 1,041
“They are loose in terms of the coupling between the production of building materials and what is done on site; see e.g. Vrijhoef and Koskela (2000) and Akintoye et al. (2000).”
BackgroundInfluentialBuild‐to‐order supply chain management: a literature review and framework for development
Gunasekaran, A., & Ngai, E. W. T. (2005) · Journal of Operations Management · doi:10.1016/j.jom.2004.10.005 · Cited by 540
Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
Irizarry, J., Karan, E. P., & Jalaei, F. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.005 · Cited by 481
Dallasega, P., Rauch, E., & Linder, C. (2018) · Computers in Industry · doi:10.1016/j.compind.2018.03.039 · Cited by 468
Engineer-to-order supply chain management: A literature review and research agenda
Gosling, J., & Naim, M. M. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.07.002 · Cited by 379
Identifying the critical factors for green construction – An empirical study in China
Shi, Q., Zuo, J., Huang, R., Huang, J., & Pullen, S. (2013) · Habitat International · doi:10.1016/j.habitatint.2013.01.003 · Cited by 328
Stakeholder Engagement: Achieving Sustainability in the Construction Sector
Bal, M., Bryde, D., Fearon, D., & Ochieng, E. (2013) · Sustainability · doi:10.3390/su5020695 · Cited by 299
Innovation in construction: a sociology of technology approach
Harty, C. (2005) · Building Research & Information · doi:10.1080/09613210500288605 · Cited by 297
Saad, M., Jones, M., & James, P. (2002) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(02)00007-2 · Cited by 281
Partnering relationships in construction: A literature review
Bygballe, L. E., Jahre, M., & Swärd, A. (2010) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2010.08.002 · Cited by 278
Li, C. Z., Zhong, R. Y., Xue, F., Xu, G., Chen, K., Huang, G. G., & Shen, G. Q. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.07.156 · Cited by 272
Construction industry productivity and the potential for collaborative practice
Fulford, R., & Standing, C. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.05.007 · Cited by 259
Barriers Affecting the Adoption of Green Building Technologies
Chan, A. P. C., Darko, A., Ameyaw, E. E., & Owusu-Manu, D.-G. (2017) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000507 · Cited by 258
An agent-based framework for supply chain coordination in construction
Xue, X., Li, X., Shen, Q., & Wang, Y. (2005) · Automation in Construction · doi:10.1016/j.autcon.2004.08.010 · Cited by 254
Interdependence in supply chains and projects in construction
Bankvall, L., Bygballe, L. E., Dubois, A., & Jahre, M. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068314 · Cited by 253
A seamless supply chain management model for construction
Love, P. E. D., Irani, Z., & Edwards, D. J. (2004) · Supply Chain Management: An International Journal · doi:10.1108/13598540410517575 · Cited by 249
The effectiveness of contractual and relational governances in construction projects in China
Lu, P., Guo, S., Qian, L., He, P., & Xu, X. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.03.004 · Cited by 245
A service oriented framework for construction supply chain integration
Cheng, J. C. P., Law, K. H., Bjornsson, H., Jones, A., & Sriram, R. (2010) · Automation in Construction · doi:10.1016/j.autcon.2009.10.003 · Cited by 227
“Even though the processes can be similar for construction projects of a specific kind, most construction projects create new products or prototypes and consist of temporary supply chains that organizations need to be reconfigured for each project [61].”
BackgroundSupply chains in the construction industry
Segerstedt, A., & Olofsson, T. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068260 · Cited by 223
“Other perspectives and explanations of root causes for low productivity development have been proposed by Vrijhoef and Koskela (2000)”
BackgroundFactors affecting the implementation of green specifications in construction
Lam, P. T. I., Chan, E. H. W., Poon, C. S., Chau, C. K., & Chun, K. P. (2010) · Journal of Environmental Management · doi:10.1016/j.jenvman.2009.09.029 · Cited by 217
“Vrijhoef and Koskela (2000) noted the significance of relationship between suppliers and other stakeholders in the total supply chain.”
BackgroundManaging construction supply chains: the common sense approach
Cox, A., & Ireland, P. (2002) · Engineering Construction and Architectural Management · doi:10.1046/j.1365-232x.2002.00273.x · Cited by 199
Yazdani, M., Wen, Z., Liao, H., Banaitis, A., & Turskis, Z. (2019) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/jcem.2019.11309 · Cited by 199
“Due to the particularity of the construction industry, the supply chain has the following characteristics in construction management (Vrijhoef & Koskela, 2000): –”
BackgroundUnderstanding Construction Supply Chain Management
Behera, P., Mohanty, R. P., & Prakash, A. (2015) · Production Planning & Control · doi:10.1080/09537287.2015.1045953 · Cited by 194
“…Ng 2003), temporary multiple organisation (Aloini et al. 2012), change inertia (Palaneeswaran, Kumaraswamy, and Ng 2003), make-to-order supply chain (Vrijhoef and Koskela 2000), collaborative opportunities (Akintoye, McIntosh, and Fitzgerald 2000) and cyclical demand (Akintoye, McIntosh, and…”
BackgroundWang, T.-K., Zhang, Q., Chong, H.-Y., & Wang, X. (2017) · Sustainability · doi:10.3390/su9020289 · Cited by 192
“They also highlighted different arrangements between the project site, immediate suppliers, and/or the extended supply chain of construction industry [22].”
BackgroundXue, X., Shen, Q., & Ren, Z. (2010) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000025 · Cited by 191
Yu, Y., Yazan, D. M., Bhochhibhoya, S., & Volker, L. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2021.126083 · Cited by 189
“However, Construction Supply Chain Management (CSCM) has been scattered and underdeveloped because of high fragmentation and project-based characteristics of the construction industry (Nam and Tatum 1988; Vrijhoef and Koskela 2000; Adriaanse 2014; Deng et al., 2019).”
BackgroundZhai, X., Reed, R., & Mills, A. (2014) · Construction Management and Economics · doi:10.1080/01446193.2013.787491 · Cited by 184
“Transferring activities from the site to the supply chain has been identified as a high priority and is a practical initiative to advance the construction process (Vrijhoef and Koskela, 2000).”
BackgroundLost in transition: the transfer of lean manufacturing to construction
Jørgensen, B., & Emmitt, S. (2008) · Engineering, Construction and Architectural Management · doi:10.1108/09699980810886874 · Cited by 169
“The comparatively few articles that have been published have addressed specific aspects of the concept, (e.g. Ballard and Howell, 1998; 2003a; Arbulu et al. 2003; Tommelein et al., 1999; Vrijhoef and Koskela, 2000; Formoso et al., 2002a,b; Ballard et al., 2003; Choo et al., 2004; Tsao et al., 2004; Elfving et al., 200…”
BackgroundLean thinking in the highways construction sector: motivation, implementation and barriers
Tezel, A., Koskela, L., & Aziz, Z. (2018) · Production Planning & Control · doi:10.1080/09537287.2017.1412522 · Cited by 165
“…as taylor & Francis group CONTACT algan tezel a.tezel@hud.ac.uk up of innovation and technology (Koskela 1992; Shirazi, Langford, and Rowlinson 1996; Vrijhoef and Koskela 2000; Dubois and Gadde 2002; Harvey 2003; Green and May 2005; McGuinness and Bennett 2006; Segerstedt and Olofsson 2010;…”
BackgroundSelf-citationShin, T.-H., Chin, S., Yoon, S.-W., & Kwon, S.-W. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.12.002 · Cited by 163
An investigation of supply chain performance measurement in the Indian automotive sector
Saad, M., & Patel, B. (2006) · Benchmarking: An International Journal · doi:10.1108/14635770610644565 · Cited by 163
“It was developed from innovations such as JIT ( Vrijhoef and Koskela, 2000”
MethodA critical review of lean supply chain management frameworks: proposed framework
Jasti, N. V. K., & Kodali, R. (2015) · Production Planning & Control · doi:10.1080/09537287.2015.1004563 · Cited by 159
“JIT manufacturing The concept of SCM is initiated and developed in the manufacturing organisations (Vrijhoef and Koskela 2000).”
Backgroundda Rocha, C. G., & Sattler, M. A. (2009) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2009.07.004 · Cited by 126
Drivers for adopting reverse logistics in the construction industry: a qualitative study
Chileshe, N., Rameezdeen, R., & Hosseini, M. R. (2016) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-06-2014-0087 · Cited by 119
Construction waste management in India: an exploratory study
Arif, M., Bendi, D., Toma‐Sabbagh, T., & Sutrisna, M. (2012) · Construction Innovation · doi:10.1108/14714171211215912 · Cited by 103
Metadata
- Authors
- Vrijhoef, R., & Koskela, L.
- Venue
- European Journal of Purchasing & Supply Management
- Publisher
- Elsevier BV
- Published
- 2000-12
- Volume
- 6
- Issue
- 3-4
- Pages
- 169-178
- ISSN
- 0969-7012 (ISSN-L)
- OpenAlex
- W2036515111
- Cited by
- 862
- References
- 14
- FWCI
- 10.54
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.