Selecting and scheduling observations of agile satellites
The DOI matches its Crossref record; 19 of the 20 references it cites were found in a registry or an index.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Citations
Cites
(1979) · Cited by 43,841
Rayward-Smith, V. J. (1991) · Journal of the Operational Research Society · doi:10.1057/jors.1991.155 · Cited by 16,821
Local Search in Combinatorial Optimization
(2003) · Princeton University Press eBooks · doi:10.1515/9780691187563 · Cited by 2,057
Constraint logic programming: a survey
Jaffar, J., & Maher, M. J. (1994) · The Journal of Logic Programming · doi:10.1016/0743-1066(94)90033-7 · Cited by 1,312 · cited 1×
“See for example [11,12,15].”
Local Search in Combinatorial Optimization
(2018) · Princeton University Press eBooks · doi:10.2307/j.ctv346t9c · Cited by 834
Lau, H. T. (1986) · Lecture Notes in Economics and Mathematical Systems · doi:10.1007/978-3-642-61649-5_4 · Cited by 796
Mackworth, A. K., & Freuder, E. C. (1985) · Artificial Intelligence · doi:10.1016/0004-3702(85)90041-4 · Cited by 692 · cited 1×
“See for example [11,12,15].”
Valued constraint satisfaction problems : hard and easy problems
Schiex, T., Fargier, H., & Verfaillie, G. (1995) · Cited by 566
Self-citationHarvey, W. D., & Ginsberg, M. L. (1995) · Cited by 513
Three Scheduling Algorithms Applied to the Earth Observing Systems Domain
Wolfe, W. J., & Sorensen, S. E. (2000) · Management Science · doi:10.1287/mnsc.46.1.148.15134 · Cited by 313 · cited 2×
“Local search (see for example [1]) is a well-known general technique for solving highly combinatorial problems, including EOS selection and scheduling problems [18,23].”
Background
Cited by
Items 301–400 of 530
Static and dynamic models of observation toward earth by satellite coverage
Xu, Y., Lian, Z., Tan, Y., Li, J., & He, R. (2010) · International Symposium on Systems and Control in Aeronautics and Astronautics · doi:10.1109/isscaa.2010.5632403 · Cited by 6
“Equipped with imaging or radar instruments, with gyroscopic actuators with which the satellites are able to move freely around their inertial center along the three axes (yaw, pitch and roll angle) (Beaumet 2006), Agile Earth Observing Satellites (AEOS) are placed on heliosynchronous, low altitude, circular orbits aro…”
BackgroundAttitude Scheduling for Dynamic Imaging of Agile Earth Observation Satellite along a Curve Target
Xiongzi, C., & Xie, S. (2018) · Chinese Control and Decision Conference (CCDC) · doi:10.1109/ccdc.2018.8407978 · Cited by 6
“With the improvement of attitude maneuver capability, AEOS is able to perform active push-broom imaging, named dynamic imaging[1-2], in which the pointing of camera optical axis will be dynamically adjusted to track ground target by real-time attitude control.”
Satellite Mission Planning with Signal Temporal Logic Specifications
Pantazides, A., Aksaray, D., & Gebre‐Egziabher, D. (2022) · AIAA SciTech Forum · doi:10.2514/6.2022-1091 · Cited by 6
Multi-Satellite Mission Planning for Environmental and Disaster Monitoring Satellite System
He, R., Bai, B., Yingwu, C., & Yuejin, T. (2008) · SpaceOps Conference (SpaceOps) · doi:10.2514/6.2008-3488 · Cited by 6
A Memetic Algorithm for Single-orbit Image Scheduling of Agile Satellite
Zhang, D., & Guo, L. (2016) · Advances in computer science research · doi:10.2991/iccsae-15.2016.62 · Cited by 6
“Lemaitre and Verfaillie [1] (2002) first proposed this problem, they set out the overall selecting and scheduling problem of French Pleiades-1 satellite and analyzed its difficulties, and then presented four different methods: greedy algorithm, dynamic programming algorithm, constraint programming and local search.”
BackgroundInfluentialASAP: Autonomy through on-board planning
Wojtkowiak, H., Balagurin, O., Fellinger, G., & Kayal, H. (2013) · International Conference on Recent Advances in Space Technologies · doi:10.1109/rast.2013.6581235 · Cited by 6
“[5], [6], [7], [8] list some examples.”
Systems and Algorithms for Collaborative Teleoperation
Song, D. (2004) · Cited by 6
EOS-Bench: A Comprehensive Benchmark for Earth Observation Satellite SchedulingPreprint
Yin, Q., Li, J., Cheng, J., Luo, Q., Riccardi, A., Chatterjee, A., Vazquez, R., Novara, C., Mavrovouniotis, M., Suganthan, P. N., et al. (2026) · arXiv (Cornell University) · doi:10.48550/arxiv.2604.25782 · Cited by 6
Shen, X., Lu, Z., Li, L., Chen, Y., Li, X., Wang, J., & Yao, W. (2024) · IEEE Transactions on Geoscience and Remote Sensing · doi:10.1109/tgrs.2024.3513483 · Cited by 5
Decentralized Satellite Constellation Replanning for Event Observation
Gorr, B., Jaramillo, A. A., Gao, H., Selva, D., Mehta, A. M., Sun, Y., Ravindra, V., David, C. H., & Allen, G. H. (2025) · Journal of Spacecraft and Rockets · doi:10.2514/1.a36143 · Cited by 5
Mantovani, L. Q., & Schaub, H. (2026) · Journal of Aerospace Information Systems · doi:10.2514/1.i011697 · Cited by 5
Xing, L., Hu, X., Zhu, W., Zhu, X., & Xia, W. (2026) · Applied Soft Computing · doi:10.1016/j.asoc.2026.114688 · Cited by 5
Kim, S. J., Kim, M., Kim, C.-H., & Choi, H. (2025) · AIAA SciTech Forum · doi:10.2514/6.2025-2273 · Cited by 5
Nanosatellite constellation control framework using evolutionary contact plan design
Gonzalez, C. E., Bergel, A., & Díaz, M. (2021) · IEEE International Conference on Space Mission Challenges for Information Technology · doi:10.1109/smc-it51442.2021.00018 · Cited by 5
“Even the simplest versions of these scheduling problems are Mixed Integer Linear Programming (MILP) and hence NP-hard class [19].”
BackgroundImproved method of acquiring the attitude changing duration of an agile imaging satellite
Guo, H., Li, P., Qiu, D., & He, C. (2012) · International Conference on Modelling, Identification and Control · Cited by 5
A Comparison of Heuristic Methods for Scheduling Earth Observing Satellites Fleet
Wang, P., Tan, Y., & Reinelt, G. (2009) · doi:10.1109/itcs.2009.174 · Cited by 5
Yang, B., Wang, M., Jin, S., & Pan, J. (2012) · The international archives of the photogrammetry, remote sensing and spatial information sciences/International archives of the photogrammetry, remote sensing and spatial information sciences · doi:10.5194/isprsarchives-xxxix-b1-339-2012 · Cited by 5
“…and optimization algorithms are proposed, such as ant colony algorithm, greedy algorithm, the local optimal search algorithm, dynamic programming algorithm, constraint programming algorithm and so on (Lemaitre et al., 2002; Aarts and Lenstra, 2003; Bensana et al., 1996; Vasquez and Hao, 2001).”
MethodResearch on emergency mission planning of earth observation satellites
Guo, C., Xiong, W., & Liu, C. (2016) · International Conference on Computer Communication and the Internet (ICCCI) · doi:10.1109/cci.2016.7778906 · Cited by 5
“To solve this problem, researchers have developed various models [3] [4] [5] [6] [7] and algorithms [8] [9] [10] [11].”
MethodLee, M., Kim, S. J., Kim, H.-Y., & Choi, H.-L. (2021) · ASCEND 2021 · doi:10.2514/6.2021-4122 · Cited by 4
A Multi-Pointer Network for Multiple Agile Optical Satellite Scheduling Problem
Liu, Z., Xiong, W., Han, C., & Zhao, K. (2024) · Aerospace · doi:10.3390/aerospace11100792 · Cited by 4
Edge Intelligence for Satellite‐Based Earth Observation: Scheduling Image Acquisition and Processing
Soret, B., Mercado-Martínez, A. M., Jurado‐Navas, A., Lyholm, N., Moretti, M., Popovski, P., & Leyva‐Mayorga, I. (2026) · International Journal of Satellite Communications and Networking · doi:10.1002/sat.70082 · Cited by 4
A Deep Reinforcement Learning Method for SAR Earth Observation Satellite Scheduling Problem
Chen, Y., Chun, J., Chen, M., Liu, X., & Chen, Y. (2024) · International Conference on Big Data and Information Analytics (BigDIA) · doi:10.1109/bigdia63733.2024.10808390 · Cited by 4
“The EOSSP is known to be an NP-hard combinatorial optimization problem [1], which has attracted considerable attention and research in recent years.”
Agile Earth Observation Satellite Constellation Mission Planning Based on Multi-Agent Transformer
Xiaohe, H. E., XIANG, J., Yan, M., Zhang, C., Xie, Z., & Liang, X. (2025) · IEICE Transactions on Fundamentals of Electronics Communications and Computer Sciences · doi:10.1587/transfun.2025eal2009 · Cited by 4
A Feasible Satellite Attitude Maneuver Strategy for High Resolution Sliding Spotlight SAR
Zhou, C., Li, Z., Wang, Z., & Tian, F. (2019) · IEEE International Geoscience and Remote Sensing Symposium (IGARSS) · doi:10.1109/igarss.2019.8899764 · Cited by 4
On-Board Decentralized Observation Planning for LEO Satellite Constellations
Song, B., Chen, Y., Yang, Q. C., Zuo, Y., Xu, S., & Chen, Y. (2023) · Algorithms · doi:10.3390/a16020114 · Cited by 4
Roussel, S., Picard, G., Pralet, C., & Maqrot, S. (2023) · Systems · doi:10.3390/systems11060297 · Cited by 4
Shi, X. C., Mengdao, X., Jinsong, Z., Huitao, L. I. U., & Hongxian, W. A. N. G. (2024) · National Remote Sensing Bulletin · doi:10.11834/jrs.20243258 · Cited by 4
Scheduling observations of visibility stressing terrain with SAR satellite constellations
Kramer, E. L., & Miller, D. W. (2025) · Acta Astronautica · doi:10.1016/j.actaastro.2025.05.017 · Cited by 4
Generation of satellite tracking profile: Problems and validation algorithms
Lee, J., Ahn, H., Ko, K. H., Wang, S., Jung, O., Choi, S.-J., & Chung, D. (2014) · Advances in Space Research · doi:10.1016/j.asr.2014.05.021 · Cited by 4
A GRASP for Next Generation Sapphire Image Acquisition Scheduling
Wang, Y., Mitrović-Minić, S., Leitch, R., & Punnen, A. P. (2016) · International Journal of Aerospace Engineering · doi:10.1155/2016/3518537 · Cited by 4
“(2002) [6] developed four different methods to solve the track selection and scheduling problem for agile Earth observation satellites, including a fast greedy algorithm, a dynamic programming algorithm, a constraint programming algorithm, and a local search algorithm.”
MethodMission planning of agile satellites for multi-targets observation
Zhao, L., Wang, S., Hao, Y., & Wu, X. (2017) · Chinese Control Conference (CCC) · doi:10.23919/chicc.2017.8027789 · Cited by 4
“Lemaitre proposed a constraint programming model to solve the mission planning problem [5].”
BackgroundSimulation-Based Scheduling for Photo-Reconnaissance Satellite
Ruan, Q., Tan, Y., He, R., & Chen, Y. (2006) · Winter Simulation Conference · doi:10.1109/wsc.2005.1574555 · Cited by 4
Vasegaard, A. E., Picard, M., Nielsen, P. A., & Saha, S. (2024) · IEEE Access · doi:10.1109/access.2024.3366454 · Cited by 4
Sequence-dependent scheduling with order deliveries
Lin, B. M. T., Yin, P.-Y., & Liu, Y.-S. (2013) · Applied Mathematics and Computation · doi:10.1016/j.amc.2013.06.087 · Cited by 4
“[21] propose and study the selection and scheduling problem of multiple earth observation satellites.”
BackgroundSolving on agile satellites mission planning based on tabu search-parallel genetic algorithms
Hui-chcng, H., Jiang, W., & Li, Y. (2013) · International Conference on Management Science and Engineering (ICMSE) · doi:10.1109/icmse.2013.6586271 · Cited by 4
Cloud Avoidance Scheduling Algorithm for Agile Optical Satellites
He, L., Liu, X., Xing, L., & Chen, Y. (2015) · Communications in computer and information science · doi:10.1007/978-3-662-49014-3_15 · Cited by 4
Bonnet, J., Gleizes, M.-P., Kaddoum, E., & Rainjonneau, S. (2016) · Open Archive Toulouse Archive Ouverte (University of Toulouse) · Cited by 4
Autonomous Mission Planning for OLFAR: A Satellite Swarm in Lunar Orbit for Radio Astronomy
Mok, S.-H., Guo, J., Gill, E. K. A., & Rajan, R. T. (2020) · Research Repository (Delft University of Technology) · Cited by 4
Dense Points Aggregation for Efficient and Collaborative Earth-Imaging Task Planning
Pan, Y., Wang, P., Hui, X., & Li, J. (2022) · International Conference on Algorithms, Computing and Artificial Intelligence (ACAI) · doi:10.1145/3579654.3579705 · Cited by 4
“For these problems, greedy search [8], tabu search [4, 22], genetic algorithms [11], simulated annealing [20] are widely employed to find a good quality solutions with limited computing time using different heuristics.”
MethodChang, Z., & Li, J. F. (2015) · Advances in engineering research/Advances in Engineering Research · doi:10.2991/eame-15.2015.148 · Cited by 4
“Thus an AEOS does have many chances to avoid cloud or other adverse effects by choosing appropriate opportunities [1].”
BackgroundClonal plasticity: an autonomic mechanism for multi-agent systems to self-diversify
Nallur, V., & Clarke, S. (2017) · Autonomous Agents and Multi-Agent Systems · doi:10.1007/s10458-017-9380-x · Cited by 4
“The breadth of domains for which MARA has been used is broad enough (network routing [48], air traffic control [49], manufacturing [50,51], transport and logistics [52], e-procurement [53], and even sharing satellite resources [54]) that these properties become the critical factors on which the choice of allocation ap…”
BackgroundModeling and Simulation of Mission Planning Problem for Remote Sensing Satellite Imaging
Pan, Y., Ming, Z., Rao, Q. L., Sun, K., & Liu, Y. N. (2018) · MATEC Web of Conferences · doi:10.1051/matecconf/201817903024 · Cited by 4
Wang, J., Demeulemeester, E. L., & Qiu, D. (2015) · SSRN Electronic Journal · doi:10.2139/ssrn.2634920 · Cited by 4
“[28] developed dynamic programming methods to get the optimal solutions of EOS scheduling problems.”
BackgroundMethodUNIVERSITÉ D'AVIGNON ET DES PAYS DE VAUCLUSE
Silva, P. H. G. (2015) · Cited by 4
Theoretical and practical contributions to star observation scheduling problems
Fontan, F. (2019) · theses.fr (ABES) · doi:10.70675/f23ff025zccc7z437dz8153zc71ef4754bd7 · Cited by 4
Multi-Criteria Decision Making in Complex Decision Environments
Vasegaard, A. E. (2023) · VBN Forskningsportal (Aalborg Universitet) · doi:10.54337/aau561817671 · Cited by 4
Scheduling multiple agile Earth observation satellites
Han, C., Wang, X., Song, G., & Leus, R. (2018) · Lirias · Cited by 4
Automatic Task Planning and Its On-Orbit Verification of Agile Remote Sensing Satellite
Yahang, Z., Haiyue, Y., Mengfei, Y., Ruochu, Y., & Shuhang, L. (2023) · International Journal of Aerospace Engineering · doi:10.1155/2023/8923088 · Cited by 3
Dobariya, R., & Hobiger, T. (2026) · CEAS Space Journal · doi:10.1007/s12567-026-00726-y · Cited by 3
Xing, L., Hu, X., Hu, N., Xia, W., & Sun, H. (2025) · Expert Systems with Applications · doi:10.1016/j.eswa.2025.130724 · Cited by 3
AstroAgentBench: Evaluating Agentic Planning on Space Mission Planning Tasks
Wang, W., Chen, X., Gong, J., Huang, X., & Qiu, X. (2026) · International Joint Conference on Natural Language Processing and Conference of the Asia-Pacific Chapter of the Association for Computational Linguistics (IJCNLP-AACL) · doi:10.18653/2026.aacl-long.72 · Cited by 3
Qin, M., Zhao, X., Xu, Z., Sun, W., Xie, W., & Liu, Q. (2026) · International Journal of Digital Earth · doi:10.1080/17538947.2026.2643501 · Cited by 3
“Methods such as dynamic local search (Lemaı ̂ tre et al. 2002), heuristic tabu search (Bianchessi et al. 2007), systematic tabu search (Habet, Vasquez, and Vimont 2010), mixed-integer linear programming (Stephenson and Schaub 2025), adaptive large neighbourhood search (ALNS) (Liu et al. 2017), and…”
Li, B., Chen, M. H., Wei, L., Chen, Y., & Chen, Y. (2026) · Applied Soft Computing · doi:10.1016/j.asoc.2026.115078 · Cited by 3
Satellite Autonomous Mission Planning Based on Improved Monte Carlo Tree Search
Li, Z., Li, Y., & Luo, R. (2024) · Symmetry · doi:10.3390/sym16081039 · Cited by 3
Planning Method for Multi-Satellite Cooperating Search for a Moving Target on the Sea
Li, J., Guo, H., & Zhu, J. (2011) · International Workshop on Multi-Platform/Multi-Sensor Remote Sensing and Mapping (M2RSM) · doi:10.1109/m2rsm.2011.5697390 · Cited by 3
“Characteristics of the Moving Target on the Sea First, The searching for the moving target on the sea using satellite, different from the traditional reconnaissance mode to the fixed ones[1-6], is relevant to the characteristics of the target.”
BackgroundHao, H.-C., Jiang, W., Li, Y., & Pang, Z.-H. (2012) · International Conference on Management Science and Engineering (ICMSE) · doi:10.1109/icmse.2012.6414177 · Cited by 3
“In previous studies, satellite mission planning and multi-user requirements are studied by using the following methods([15-20]).”
MethodA fast dynamic algorithm for area target scheduling of remote satellite
Gao, P. F., yuejin, T., & Feng, Y. (2012) · IEEE Symposium on Electrical & Electronics Engineering · doi:10.1109/eeesym.2012.6258590 · Cited by 3
Malladi, K. T. (2014) · Summit (Simon Fraser University) · Cited by 3
An Improved Estimation of Distribution Algorithm for Earth Observation Satellite Scheduling Problem
Ma, C., Xu, R., Liu, X., & Wu, C. (2024) · IEEE International Conference on Unmanned Systems (ICUS) · doi:10.1109/icus61736.2024.10839992 · Cited by 3
Multi agent based networking satellite tasks scheduling with department collaborative mechanism
Jiang, W., Xiu-li, P., & Zi-qing, Y. (2017) · International Conference on Natural Computation, Fuzzy Systems and Knowledge Discovery (ICNC-FSKD) · doi:10.1109/fskd.2017.8393413 · Cited by 3
“Lemaitre [16, 17] compared differences among the constraint programming, local search, dynamic programming and greedy algorithm in handling the satellite scheduling problem.”
BackgroundSynthesis of plans or policies for controlling dynamic systems
Verfaillie, G., Pralet, C., Vidal, V., Teichteil-Königsbuch, F., Infantes, G., & Lesire, C. (2012) · HAL · doi:10.12762/2012.al04-05 · Cited by 3
Self-citationAN OPTIMIZATION APPROACH FOR THE DAILY PHOTOGRAPH SELECTION PROBLEM OF EARTH OBSERVATION SATELLITES
Kιlιç, S. (2019) · Havacılık ve uzay teknolojileri dergisi · Cited by 3
Baart, R. (2018) · Research Repository (Delft University of Technology) · Cited by 3
Straub, A. N. (2020) · DSpace@MIT (Massachusetts Institute of Technology) · Cited by 3
Lumet, C. (2012) · theses.fr (ABES) · doi:10.70675/a6d5d244z8351z4921za29ez44f30d37f2c1 · Cited by 3
Zheng, Y., Wang, P., Qi, Y., Ma, H., Wang, P., Zhao, G., Peng, G., & Zhou, H. (2025) · International Conference on Geology, Mapping and Remote Sensing (ICGMRS) · doi:10.1109/icgmrs66001.2025.11065531 · Cited by 2
“Le Maitre et al. proposed four algorithms to solve the task scheduling problem of the agile satellite Pleiades constellation, including greedy algorithm, dynamic programming algorithm, constraint programming approach and local search method[10].”
Khatir, P. A., Homayounpour, M. M., & Charmacani, K. R. (2025) · Journal of Aerospace Information Systems · doi:10.2514/1.i011555 · Cited by 2
Levinson, R., Ravindra, V., & Roy-Singh, S. (2025) · International Joint Conference on Artificial Intelligence · doi:10.24963/ijcai.2025/950 · Cited by 2
Zheng, L., Jiang, Q., Zhang, Y., & Chen, B. (2025) · Aerospace · doi:10.3390/aerospace12100914 · Cited by 5
Zhou, G., Luo, J., Bian, J., & Zhang, Y. (2025) · IEEE Transactions on Systems Man and Cybernetics Systems · doi:10.1109/tsmc.2025.3624873 · Cited by 2
Wang, S., Zhou, D., Sheng, M., Yue, W., Zhang, W., & Pulatov, B. (2026) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2026.3653350 · Cited by 2
Zhu, J., Hu, Q., Wu, J. D., Du, Y., Liu, X., Song, Y., Pedrycz, W., & Xing, L. (2026) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2026.3680859 · Cited by 2
Fast Neural Policy Training for Agile Satellite Scheduling via Constraint-Consistent Transfer
Chen, M., He, L., Chen, Y., Wei, L., Liu, X., Wu, G., & Witold Pedrycz, C. (2026) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2026.3703455 · Cited by 2
“The AEOS Scheduling Problem (AEOSSP) is an NP-hard combinatorial optimization problem [3], [4], formally abstracted as finding the longest path in a multi-constrained directed graph.”
Planning and Scheduling of an Agile EOS Combining On-ground and On-board Decisions
Li, J., & Yan, C. (2018) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/382/3/032023 · Cited by 2
A large-scale mission planning method for agile earth observation satellite
Wu, J., Wang, X., Shi, Z., Zhao, F., Ma, Y., & Jin, Z. (2023) · Chinese Control and Decision Conference (CCDC) · doi:10.1109/ccdc58219.2023.10326478 · Cited by 2
Betriu, P., Sòria, M., Gutiérrez, J., Andía, D., & Llopis, M. (2024) · Advances in Space Research · doi:10.1016/j.asr.2024.12.024 · Cited by 2
Derollez, R., Petitdemange, R., & Brémond, L. (2024) · Springer aerospace technology · doi:10.1007/978-3-031-60408-9_15 · Cited by 2
Network Control Systems for Large-Scale Constellations
Cappaert, J., & Nag, S. (2020) · Springer eBooks · doi:10.1007/978-3-030-20707-6_16-1 · Cited by 2
A Large-Scale Scheduling Method for Multiple Agile Optical Satellites
Liu, Z., Xiong, W. H., & Xiong, M. (2022) · Computer Modeling in Engineering & Sciences · doi:10.32604/cmes.2023.025452 · Cited by 2
Liu, Y., JAUBERT, J., Haiyan, W. U., Zhun, F. E. N. G., & Hu, L. I. (2020) · Chinese Journal of Space Science · doi:10.11728/cjss2020.03.401 · Cited by 2
Minimum Weighted Vertex Cover Approach to Task Allocation of Multiple Satellites
Sun, C., Zhang, X., Zhou, Q., & Qiu, H. (2024) · Chinese Control Conference (CCC) · doi:10.23919/ccc63176.2024.10662544 · Cited by 2
“For instance, Lemaˆıtre focused on observation scheduling of agile satellites and compared the performances of typical solvers by recasting the problem as a constraint satisfaction problem (CSP) [14, 15].”
BackgroundLili, Z., Yongge, M., Xueqian, W., & Gang, L. (2025) · Journal of Systems Engineering and Electronics · doi:10.23919/jsee.2024.000121 · Cited by 2
VTWSAR: A Fast Calculation Method for Visible Time Window of SAR Satellite to Regional Target
Shi, X., Xing, W., Liu, H., Wang, Y., & Xing, M. (2025) · IEEE Journal of Selected Topics in Applied Earth Observations and Remote Sensing · doi:10.1109/jstars.2025.3574518 · Cited by 2
“Currently, there are many studies on mission optimization technology [11], [12], [13], [14], [15], [16].”
Zuo, Y., Chen, M., Liu, X., Du, Y., Qamar, A., & Shang, Y. (2025) · Tsinghua Science & Technology · doi:10.26599/tst.2024.9010164 · Cited by 2
Liu, X., 国防科学技术大学信息系统与管理学院, Gao, P., 陈盈果, & 陈英武 (2010) · National Remote Sensing Bulletin · doi:10.11834/jrs.20100514 · Cited by 2
On the Selection of Multi Optimal Imaging Frames in Single Time Slot for Earth Observation Satellite
Zhang, G., Yin, J., Zhu, E., & Mao, L. (2008) · International Conference for Young Computer Scientists · doi:10.1109/icycs.2008.123 · Cited by 2
“Literature [2] considers the problem of finding a trajectory that will maximally cover the requested zones for the camera which has a three-axis robotic that can be The 9th International Conference for Young Computer Scientists”
BackgroundChen, S.-J., Li, Z., & Hu, M. (2019) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/608/1/012030 · Cited by 2
RETRACTED: Resource satellite intelligent management and control mode based on mission planning
Lu, H. M., Xue, H., & Xiong, J. (2019) · International Journal of Electrical Engineering Education · doi:10.1177/0020720919883807 · Cited by 2
RetractedScheduling an Agile Multipayload Earth-Observing Satellite
Zhang, W., & Zheng, G. (2023) · Journal of Spacecraft and Rockets · doi:10.2514/1.a35726 · Cited by 2
Proportional Partition of Holed Rectilinear Region amongst Multiple URAVs
Agarwal, A., Lim, M., & Er, M. J. (2006) · Proceedings - IEEE International Conference on Robotics and Automation/Proceedings · doi:10.1109/robot.2005.1570371 · Cited by 2
“Robotic coverage applications include moving a tool over a surface as in surface milling or lawn mowing [15], [16] or moving the sensor footprint over a region as in capturing images using a satellite [17] or region surveillance [18].”
BackgroundSatellite Image Tasking Under Orbit Prediction UncertaintyPreprint
Eddy, D., & Kochenderfer, M. J. (2019) · arXiv (Cornell University) · doi:10.48550/arxiv.1905.01417 · Cited by 2
Roy-Singh, S., Li, A., Ravindra, V., Lammers, R. W., & Net, M. S. (2025) · arXiv (Cornell University) · doi:10.48550/arxiv.2506.16537 · Cited by 2
“Constellation planning and scheduling for re-orientable imaging [3-5], using static or dynamic [6,7] assumptions on transition time, and downlink [8] have been done separately, or co-optimized for imaging and downlink [9-11].”
Flexible Scheduling for Agile Earth Observing Satellites
Maillard, A. (2015) · theses.fr (ABES) · doi:10.70675/84285b92zff8fz484ezbdcezfeabd8681001 · Cited by 2
Co-optimisation charge utile satellite et système télécom
Camino, J. (2017) · theses.fr (ABES) · doi:10.70675/703dc179zce69z42e8zb88ez2acc676e95d0 · Cited by 2
Scheduling and Rescheduling of Imaging Satellite Based on Ant Colony Optimization ⋆
Li, Y., Wang, R., & Xu, M. (n.d.) · Cited by 2
Gao, X., Zhang, H., Yu, T., Ma, G., & Gao, D. (2020) · 2020 Chinese Automation Congress (CAC) · doi:10.1109/cac51589.2020.9326860 · Cited by 1
“In[1], countries around the world have begun to study satellite mission planning and re-planning issues.”
BackgroundShan, Y., Wang, X.-P., Cheng, S., Zhang, M., & Xing, L. (2024) · Symmetry · doi:10.3390/sym16070813 · Cited by 1
Reactive Planning Strategy for Event-Driven Observation in Heterogeneous Sensor Webs
Gorr, B., Jaramillo, A. A., Erwin, C., & Selva, D. (2024) · IEEE International Geoscience and Remote Sensing Symposium (IGARSS) · doi:10.1109/igarss53475.2024.10641116 · Cited by 1
“The satellite observation planning problem was formally introduced by Lemaˆıtre et al. [3], where they provided several solution methods, such as heuristic methods and constraint programming.”
MethodAutonomous Agile Earth Observation Satellite Mission Planning with Task Clustering
Xiaohe, H. E., Li, Z., Huang, W., XIANG, J., Zhang, C., Xie, Z., & Liang, X. (2024) · IEICE Transactions on Fundamentals of Electronics Communications and Computer Sciences · doi:10.1587/transfun.2024eal2106 · Cited by 1
“Since its initial formulation by Lemaitre [2], the satellite mission planning problem has been the subject of extensive research.”
Yang, J., & He, L. (2024) · International Conference on Artificial Intelligence and Automation Control (AIAC) · doi:10.1109/aiac63745.2024.10899555 · Cited by 1
“The feature of time-dependence lies in that the angles is dependent on the observation start time through a linear process[4].”
Metadata
- Authors
- Lemaı̂tre, M., Verfaillie, G., Jouhaud, F., Lachiver, J.-M., & Bataille, N.
- Affiliations
- Office National d'Études et de Recherches Aérospatiales (FR)
- Centre National d'Études Spatiales (FR)
- Corresponding author
- Lemaı̂tre, Michel
- Venue
- Aerospace Science and Technology
- Publisher
- Elsevier BV
- Published
- 2002-09
- Volume
- 6
- Issue
- 5
- Pages
- 367-381
- ISSN
- 1270-9638 (ISSN-L)
- OpenAlex
- W2110599800
- Cited by
- 472
- References
- 20
- Citations by year
- 2026: 39 · 2025: 55 · 2024: 60 · 2023: 34 · 2022: 19 · 2021: 29 · 2020: 27 · 2019: 35 · 2018: 30 · 2017: 20 · 2016: 16 · 2015: 15 · 2014: 11 · 2013: 13 · 2012: 11
- FWCI
- 15.43
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.elsevier.com/tdm/userlicense/1.0/ (tdm)
- Locations
- Aerospace Science and Technology (publishedVersion)
- Topics
- Physical Sciences › Engineering › Aerospace Engineering › Satellite Communication Systems
- Physical Sciences › Engineering › Aerospace Engineering › Spacecraft Dynamics and Control
- Physical Sciences › Engineering › Aerospace Engineering › Spacecraft Design and Technology
- Keywords
- AGILE satellite, Earth observation satellites, observation scheduling, observation selection, Pleiades, combinatorial optimization, greedy algorithm, dynamic programming, constraint programming, local search
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.