Selecting and scheduling observations of agile satellites
The DOI matches its Crossref record; 19 of the 20 references it cites were found in a registry or an index.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Citations
Cites
(1979) · Cited by 43,841
Rayward-Smith, V. J. (1991) · Journal of the Operational Research Society · doi:10.1057/jors.1991.155 · Cited by 16,821
Local Search in Combinatorial Optimization
(2003) · Princeton University Press eBooks · doi:10.1515/9780691187563 · Cited by 2,057
Constraint logic programming: a survey
Jaffar, J., & Maher, M. J. (1994) · The Journal of Logic Programming · doi:10.1016/0743-1066(94)90033-7 · Cited by 1,312 · cited 1×
“See for example [11,12,15].”
Local Search in Combinatorial Optimization
(2018) · Princeton University Press eBooks · doi:10.2307/j.ctv346t9c · Cited by 834
Lau, H. T. (1986) · Lecture Notes in Economics and Mathematical Systems · doi:10.1007/978-3-642-61649-5_4 · Cited by 796
Mackworth, A. K., & Freuder, E. C. (1985) · Artificial Intelligence · doi:10.1016/0004-3702(85)90041-4 · Cited by 692 · cited 1×
“See for example [11,12,15].”
Valued constraint satisfaction problems : hard and easy problems
Schiex, T., Fargier, H., & Verfaillie, G. (1995) · Cited by 566
Self-citationHarvey, W. D., & Ginsberg, M. L. (1995) · Cited by 513
Three Scheduling Algorithms Applied to the Earth Observing Systems Domain
Wolfe, W. J., & Sorensen, S. E. (2000) · Management Science · doi:10.1287/mnsc.46.1.148.15134 · Cited by 313 · cited 2×
“Local search (see for example [1]) is a well-known general technique for solving highly combinatorial problems, including EOS selection and scheduling problems [18,23].”
Background
Cited by
Chaff: engineering an efficient SAT solver
Moskewicz, M. W., Madigan, C. F., Zhao, Y., Zhang, L., & Malik, S. (2001) · Proceedings of the 38th conference on Design automation - DAC '01 · doi:10.1145/378239.379017 · Cited by 2,940
Efficient Conflict Driven Learning in a Boolean Satisfiability Solver
Zhang, L., Madigan, C. F., Moskewicz, M. H., & Malik, S. (2001) · Cited by 681
ISSUES IN MULTI AGENT RESOURCE ALLOCATION
Chevaleyre, Y., Dunne, P. E. S., Endriss, U., Lang, J., Lemaître, M., Maudet, N., Padget, J. A., Phelps, S. C., Rodríguez-Aguilar, J. A., & Sousa, P. B. (2005) · Informatica · Cited by 584
Self-citationWang, X., Wu, G., Xing, L., & Pedrycz, W. (2021) · IEEE Systems Journal · doi:10.1109/jsyst.2020.2997050 · Cited by 260
“d works of AEOSSP in Table 1. Table 1: Representatives of real-world AEOSs. Name Launch Country Constellation Resolution (m) Related Work GeoEye-1 2008 USA No 0.46-1.84 { Pleiades 2011 France Yes 1-3 [3, 12, 13, 14, 15] WorldView 2007 USA Yes 0.3-3.7 { HJ-1 2012 China Yes 30-150 [16] JL-1 2015 China Yes 1-5 { SuperVie…”
BackgroundInfluentialBianchessi, N., Cordeau, J.-F., Desrosiers, J., Laporte, G., & Raymond, V. (2007) · European Journal of Operational Research · doi:10.1016/j.ejor.2005.12.026 · Cited by 252
Liu, X., Laporte, G., Chen, Y., & He, R. (2017) · Computers & Operations Research · doi:10.1016/j.cor.2017.04.006 · Cited by 250
An improved adaptive large neighborhood search algorithm for multiple agile satellites scheduling
He, L., Liu, X., Laporte, G., Chen, Y., & Chen, Y. (2018) · Computers & Operations Research · doi:10.1016/j.cor.2018.06.020 · Cited by 200
Wang, P., Reinelt, G., Gao, P., & Tan, Y. (2011) · Computers & Industrial Engineering · doi:10.1016/j.cie.2011.02.015 · Cited by 195
Graph colouring approaches for a satellite range scheduling problem
Zufferey, N., Amstutz, P., & Giaccari, P. (2008) · Journal of Scheduling · doi:10.1007/s10951-008-0066-8 · Cited by 177
“…on satellite range scheduling problems (e.g., Bensana et al. 1999; Harrison et al. 1999; Pemberton 2000; Wolfe and Sorensen 2000; Verfaillie and Lemaitre 2001; Frank et al. 2001; Lemaitre et al. 2002; Gabrel and Murat 2003; Vasquez and Hao 2003; Globus et al. 2003, 2004; Cordeau and Laporte 2005).”
BackgroundDaily imaging scheduling of an earth observation satellite
Lin, W.-C., Liao, D.-Y., Liu, C.-Y., & Lee, Y.-Y. (2005) · IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans · doi:10.1109/tsmca.2005.843380 · Cited by 173
“Lemaitre et al. [ 9 ] consider the problem of managing the new generation of agile earth observing satellites.”
BackgroundTangpattanakul, P., Jozefowiez, N., & Lòpez, P. (2015) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.03.011 · Cited by 179
Xu, R., Chen, H., Liang, X., & Wang, H. (2016) · Expert Systems with Applications · doi:10.1016/j.eswa.2015.12.039 · Cited by 165
A mixed integer linear programming model for multi-satellite scheduling
Chen, X., Reinelt, G., Dai, G., & Spitz, A. (2019) · European Journal of Operational Research · doi:10.1016/j.ejor.2018.11.058 · Cited by 162
He, Y., Xing, L., Chen, Y., Pedrycz, W., Wang, L., & Wu, G. (2022) · IEEE Transactions on Systems, Man, and Cybernetics: Systems · doi:10.1109/tsmc.2020.3020732 · Cited by 159
“Unfortunately, we cannot guarantee the value function reaches its optimal value under the limited iterations of training, because the AEOS scheduling problem is an NP-hard problem, and the optimality of HADRT in the environment of the MDP cannot be guaranteed under all circumstances.”
BackgroundInfluentialWu, G., Jin, L., Ma, M., & Qiu, D. (2013) · Computers & Operations Research · doi:10.1016/j.cor.2013.02.009 · Cited by 155
Planning and scheduling algorithms for the COSMO-SkyMed constellation
Bianchessi, N., & Righini, G. (2008) · Aerospace Science and Technology · doi:10.1016/j.ast.2008.01.001 · Cited by 148
“Lemaitre et al. (2002) illustrated several algorithmic techniques for the planning and scheduling problem of the Pleiades constellation.”
MethodReinforcement learning in spacecraft control applications: Advances, prospects, and challenges
Tipaldi, M., Iervolino, R., & Massenio, P. R. (2022) · Annual Reviews in Control · doi:10.1016/j.arcontrol.2022.07.004 · Cited by 141
A Data-Driven Parallel Scheduling Approach for Multiple Agile Earth Observation Satellites
Du, Y., Wang, T., Xin, B., Wang, L., Chen, Y., & Xing, L. (2020) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2019.2934148 · Cited by 114
“[6] proposed the AEOS scheduling problem for the first time and constructed a heuristic rule to obtain a fast but reasonable result.”
BackgroundMethodOnline scheduling of image satellites based on neural networks and deep reinforcement learning
WANG, H., YANG, Z., ZHOU, W., & LI, D. (2019) · Chinese Journal of Aeronautics · doi:10.1016/j.cja.2018.12.018 · Cited by 112
Habet, D., Vasquez, M., & Vimont, Y. (2008) · Computational Optimization and Applications · doi:10.1007/s10589-008-9220-7 · Cited by 122
“Readers interested in a full description of the the AEOS management problem can refer to [ 15 ].”
BackgroundMethodInfluentialOptimization-Based Scheduling for the Single-Satellite, Multi-Ground Station Communication Problem
Spangelo, S., Cutler, J., Gilson, K., & Cohn, A. (2015) · Computers & Operations Research · doi:10.1016/j.cor.2014.11.004 · Cited by 120
Niu, X., Tang, H., & Wu, L. (2018) · International Journal of Disaster Risk Reduction · doi:10.1016/j.ijdrr.2018.02.013 · Cited by 101
Wei, L., Chen, Y., Chen, M., & Chen, Y. (2021) · Applied Soft Computing · doi:10.1016/j.asoc.2021.107607 · Cited by 117
Peng, G., Dewil, R., Verbeeck, C., Gunawan, A., Xing, L., & Vansteenwegen, P. (2019) · Computers & Operations Research · doi:10.1016/j.cor.2019.05.030 · Cited by 113
“Liao and Yang (2007) developed an imaging order scheduler for the FORMOSAT-2 satellite considering weather uncertainty.”
An anytime branch and bound algorithm for agile earth observation satellite onboard scheduling
Chu, X., Chen, Y., & Tan, Y. (2017) · Advances in Space Research · doi:10.1016/j.asr.2017.07.026 · Cited by 110
Wang, J., Demeulemeester, E. L., & Qiu, D. (2016) · Computers & Operations Research · doi:10.1016/j.cor.2016.04.014 · Cited by 104
“Metaheuristics: A large number of metaheuristics were proposed for EOS scheduling, which primarily contain tabu search algorithms [4, 8, 10, 34, 36, 46, 57], genetic algorithms [29, 44, 45, 55], ant colony algorithms [30, 50, 56], local search algorithms [27, 28, 48] and simulated annealing algorithms [17, 18].”
Task scheduling and attitude planning for agile earth observation satellite with intensive tasks
Wang, S., Zhao, L., Cheng, J., Zhou, J., & Wang, Y. (2019) · Aerospace Science and Technology · doi:10.1016/j.ast.2019.04.007 · Cited by 95
Han, C. S., Gu, Y., Wu, G., & Wang, X. (2022) · IEEE Transactions on Systems Man and Cybernetics Systems · doi:10.1109/tsmc.2022.3220534 · Cited by 102
“[6] indicated that the AEOS scheduling problem, although simplified, is NP-hard.”
BackgroundOptimization-Based Scheduling Method for Agile Earth-Observing Satellite Constellation
Cho, D.-H., Kim, J.-H., Choi, H.-L., & Ahn, J. (2018) · Journal of Aerospace Information Systems · doi:10.2514/1.i010620 · Cited by 98
An exact algorithm for agile earth observation satellite scheduling with time-dependent profits
Peng, G., Song, G., Xing, L., Gunawan, A., & Vansteenwegen, P. (2020) · Computers & Operations Research · doi:10.1016/j.cor.2020.104946 · Cited by 93
Hierarchical scheduling for real-time agile satellite task scheduling in a dynamic environment
He, L., Liu, X.-L., Chen, Y.-W., Xing, L.-N., & Liu, K. (2019) · Advances in Space Research · doi:10.1016/j.asr.2018.10.007 · Cited by 91
Understanding the power of clause learning
Beanie, P., Kautz, H., & Sabharwal, A. (2003) · International Joint Conference on Artificial Intelligence · Cited by 91
Onboard Mission Planning for Agile Satellite Using Modified Mixed-Integer Linear Programming
She, Y., Li, S., & Zhao, Y. (2018) · Aerospace Science and Technology · doi:10.1016/j.ast.2017.11.009 · Cited by 88
Scheduling algorithms for rapid imaging using agile Cubesat constellations
Nag, S., Li, A. S., & Merrick, J. H. (2018) · Advances in Space Research · doi:10.1016/j.asr.2017.11.010 · Cited by 87
“Nonetheless, MILP has been successfully formulated for EOS in flight missions - PLEIADES and the SPOT series (Lemaı̂tre et al., 2002), GEO-CAPE (Frank et al., 2016) - and adapted as Constraint-based Interval Planning in the EUROPA planner for Deep Space 1 (Frank et al., 2001).”
BackgroundMethodInfluentialPeng, G., Song, G., He, Y., Yu, J., Xiang, S., Xing, L., & Vansteenwegen, P. (2020) · IEEE Transactions on Systems Man and Cybernetics Systems · doi:10.1109/tsmc.2020.3031738 · Cited by 86
“In contrast, the new generation of EOSs, Agile EOSs (AEOSs) are mobile on three axes (roll, pitch, and yaw), thus allowing observations before or after its upright pass (the nadir point) [3].”
BackgroundInfluentialRevising the Observation Satellite Scheduling Problem Based on Deep Reinforcement Learning
Huang, Y., Mu, Z., Wu, S., Cui, B., & Duan, Y. (2021) · Remote Sensing · doi:10.3390/rs13122377 · Cited by 73
“Therefore, an effective EOS scheduling algorithm plays an important role to improve high-quality space-based information services, and not only guides the corresponding EOSs on how to perform the following actions, but also controls the time to start the observations [5].”
InfluentialHe, L., de Weerdt, M., & Yorke-Smith, N. (2020) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-019-01518-4 · Cited by 77
“Besides, the transition time for the satellite to change its observation angle between two adjacent jobs is time/sequence-dependent (Lemaître et al. 2002).”
BackgroundQuantum Algorithms Applied to Satellite Mission Planning for Earth Observation
Rainjonneau, S., Tokarev, I., Iudin, S., Rayaprolu, S., Pinto, K., Lemtiuzhnikova, D., Koblan, M., Barashov, E., Kordzanganeh, M., Pflitsch, M., et al. (2023) · IEEE Journal of Selected Topics in Applied Earth Observations and Remote Sensing · doi:10.1109/jstars.2023.3287154 · Cited by 83
“3287154 solutions have been suggested [5], [6], [7] as a remedy to the planning problem.”
BackgroundScheduling for single agile satellite, redundant targets problem using complex networks theory
Wang, X., Chen, Z., & Han, C. S. (2015) · Chaos Solitons & Fractals · doi:10.1016/j.chaos.2015.12.003 · Cited by 81
A new multi-satellite autonomous mission allocation and planning method
Du, B., & Li, S. (2018) · Acta Astronautica · doi:10.1016/j.actaastro.2018.11.001 · Cited by 81
Mansour, M., & Dessouky, M. M. (2009) · Computers & Industrial Engineering · doi:10.1016/j.cie.2009.11.012 · Cited by 79
Li, Z., & Li, X. (2019) · Advances in Space Research · doi:10.1016/j.asr.2019.01.043 · Cited by 70
Dynamic Scheduling for Emergency Tasks on Distributed Imaging Satellites with Task Merging
Wang, J., Zhu, X., Qiu, D., & Yang, L. T. (2014) · IEEE Transactions on Parallel and Distributed Systems · doi:10.1109/tpds.2013.156 · Cited by 72
Imaging Order Scheduling of an Earth Observation Satellite
Liao, D.-Y., & Yang, Y.-T. (2007) · IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews) · doi:10.1109/tsmcc.2007.900668 · Cited by 71
“Lemaitre et al. [ 13 ] deal with the problem of managing new-generation Earth-observing satellites.”
BackgroundA Branch and Bound Algorithm for Agile Earth Observation Satellite Scheduling
Chu, X., Chen, Y., & Xing, L. (2017) · Discrete Dynamics in Nature and Society · doi:10.1155/2017/7345941 · Cited by 59
“So the critical constraint is the time-dependent temporal constraint, which means the minimum transition time taken by a maneuver between the end of the former acquisition and the start of the following one is not constant and depends on the precise time at which the transition is triggered [1].”
BackgroundInfluentialChang, Z., Chen, Y., Yang, W., & Zhou, Z. (2020) · Advances in Space Research · doi:10.1016/j.asr.2020.09.002 · Cited by 73
A two-phase genetic annealing method for integrated Earth observation satellite scheduling problems
Zhu, W., Hu, X., Xia, W., & Jin, P. (2017) · Soft Computing · doi:10.1007/s00500-017-2889-8 · Cited by 72
“Due to the complexity of EOSS, the development of proven exact optimization algorithms is difficult, although research regarding methods such as branch and bound (Verfaillie et al. 1996), dynamic programming (Lemaître et al. 2002), and enumeration (Gabrel and Vanderpooten 2002) has been conducted.”
BackgroundMethodGu, Y., Han, C. S., Chen, Y., Liu, S., & Wang, X. (2022) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2022.3205565 · Cited by 73
“Existing algorithms to solve the Earth observation scheduling problem can be divided into three types: the exact algorithm [24], [25], [26], heuristic [27], [28], [29], [30], and multiobjective evolutionary algorithm (MOEA) [31].”
MethodRobust earth observation satellite scheduling with uncertainty of cloud coverage
Wang, X., Song, G., Leus, R., & Han, C. (2020) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2019.2947978 · Cited by 70
“Agile EOSs with strong attitude maneuvering ability can generate more candidate missions, but the scheduling complexity is obviously significantly increased by this agile character [53], [54].”
BackgroundA Maximum Independent Set Method for Scheduling Earth-Observing Satellite Constellations
Eddy, D., & Kochenderfer, M. J. (2021) · Journal of Spacecraft and Rockets · doi:10.2514/1.a34931 · Cited by 69
Multi-satellite scheduling framework and algorithm for very large area observation
Xu, Y., Liu, X., He, R., & Chen, Y. (2020) · Acta Astronautica · doi:10.1016/j.actaastro.2019.10.041 · Cited by 57
Zhao, X., Wang, Z., & Zheng, G. (2020) · Journal of Aerospace Information Systems · doi:10.2514/1.i010754 · Cited by 53
Robust scheduling for multiple agile Earth observation satellites under cloud coverage uncertainty
Wang, X., Gu, Y., Wu, G., & Woodward, J. R. (2021) · Computers & Industrial Engineering · doi:10.1016/j.cie.2021.107292 · Cited by 64
Markov Decision Processes For Multi-Objective Satellite Task Planning
Eddy, D., & Kochenderfer, M. J. (2020) · IEEE Aerospace Conference (AERO) · doi:10.1109/aero47225.2020.9172258 · Cited by 64
“Time constrained task-sequencing has been shown to be NP-complete [3]; consequently, various formulations and heuristics have been introduced over the years [4], [5], [6], [7].”
BackgroundSatellite Scheduling Problems: A survey of applications in Earth and outer space observation
Ferrari, B., Cordeau, J., Delorme, M., Iori, M., & Orosei, R. (2024) · Computers & Operations Research · doi:10.1016/j.cor.2024.106875 · Cited by 62
“Lemaître et al. (2002) describe the problem of selecting and scheduling observations of an agile EOS during a single orbit, considering both spot and area targets, the latter ranging from 20 to 100 km in length.”
BackgroundAugenstein, S., Estanislao, A., Guere, E., & Blaes, S. (2016) · Proceedings of the International Conference on Automated Planning and Scheduling · doi:10.1609/icaps.v26i1.13784 · Cited by 62
“Maximizing imaging productivity has been a topic of heavy focus, with research into optimizing the imaging schedule of a single satellite (Bensana et al. 1996; Gabrel et al. 1997; Vasquez and Hao 2001; Gabrel and Vanderpooten 2002; Lemaitre et al. 2002; Gabrel and Murat 2003; Vasquez and Hao 2003; Lin et al. 2005; Tan…”
BackgroundMethodHe, Y., Chen, Y., Lu, J.-M., Chen, C., & Wu, G. (2019) · Journal of Systems Architecture · doi:10.1016/j.sysarc.2019.03.005 · Cited by 62
E., Z., Shi, R., Gan, L., Baoyin, H., & Li, J. (2021) · Acta Astronautica · doi:10.1016/j.actaastro.2020.08.041 · Cited by 54
Mission planning optimization of video satellite for ground multi-object staring imaging
Cui, K., Xiang, J., & Zhang, Y. (2017) · Advances in Space Research · doi:10.1016/j.asr.2017.10.056 · Cited by 60
“The mission planning optimization problem of an agile satellite is much more complicated than that of a conventional non-agile satellite, and it has been shown to be an NP-hard problem (Lemaitre et al., 2002).”
BackgroundScheduling Observations of Agile Satellites with Combined Genetic Algorithm
Li, Y., Xu, M., & Wang, R. (2007) · Third International Conference on Natural Computation (ICNC 2007) · doi:10.1109/icnc.2007.652 · Cited by 44
“On the other hand, the selection and scheduling of observations for an AEOS becomes significantly more difficult, because the search space is considerably larger [3].”
BackgroundWang, J., Demeulemeester, E., Hu, X., Qiu, D., & Liu, J. (2019) · IEEE Systems Journal · doi:10.1109/jsyst.2018.2874223 · Cited by 56
Kim, H., & Chang, Y.-K. (2020) · Aerospace Science and Technology · doi:10.1016/j.ast.2020.106287 · Cited by 59
Game theoretic self-organization in multi-satellite distributed task allocation
Sun, C., Wang, X., Qiu, H., & Zhou, Q. (2021) · Aerospace Science and Technology · doi:10.1016/j.ast.2021.106650 · Cited by 58
Chen, M., Du, Y., Tang, K., Xing, L., Chen, Y., & Chen, Y. (2024) · IEEE Transactions on Systems Man and Cybernetics Systems · doi:10.1109/tsmc.2024.3411640 · Cited by 59
“Lemaître et al. [1] were the first to comprehensively introduce the overall AEOSSP.”
BackgroundMethodInfluentialMulti-satellite Mission Planning Using a Self-Adaptive Multi-agent System
Bonnet, J., Gleizes, M.-P., Kaddoum, E., Rainjonneau, S., & Flandin, G. (2015) · IEEE International Conference on Self-Adaptive and Self-Organizing Systems (SASO) · doi:10.1109/saso.2015.9 · Cited by 57
“As shown in [16], when applying the algorithm linearly, the execution will quickly use most of the memory resources making the approach inapplicable in case of complex linked requests, as it is the case of stereoscopic imaging.”
InfluentialAgile Earth Observation Satellite Scheduling With a Quantum Annealer
Stollenwerk, T., Michaud, V., Lobe, E., Picard, M., Basermann, A., & Botter, T. (2021) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2021.3088490 · Cited by 56
“The satellite can therefore manoeuvre during image acquisitions and during transitions between images [11].”
Computing leximin-optimal solutions in constraint networks
Bouveret, S., & Lemaître, M. (2008) · Artificial Intelligence · doi:10.1016/j.artint.2008.10.010 · Cited by 55
“This first application concerns the common exploitation of a constellation of agile Earth observation satellites, as described in [ 25 ].”
MethodSelf-citationA new hybrid genetic algorithm for the collection scheduling problem for a satellite constellation
Barkaoui, M., & Berger, J. (2019) · Journal of the Operational Research Society · doi:10.1080/01605682.2019.1609891 · Cited by 54
Wei, L., Xing, L., Wan, Q., Song, Y., & Chen, Y. (2021) · Computers & Industrial Engineering · doi:10.1016/j.cie.2021.107530 · Cited by 54
Cui, J., & Zhang, X. (2019) · Sensors · doi:10.3390/s19061430 · Cited by 52
“The methods used to solve this problem include priority-based heuristics [4], local search [5], tabu search [6,7], genetic algorithms [2] and ant colony algorithms [8].”
MethodTangpattanakul, P., Jozefowiez, N., & Lòpez, P. (2012) · Lecture notes in computer science · doi:10.1007/978-3-642-32964-7_12 · Cited by 53
Deep Reinforcement Learning for Agile Satellite Scheduling Problem
Chen, M., Chen, Y., Chen, Y., & Qi, W. (2019) · IEEE Symposium Series on Computational Intelligence (SSCI) · doi:10.1109/ssci44817.2019.9002957 · Cited by 52
Wang, X., Jian, W., Zhong, S. S., Zhao, F., & Jin, Z. (2022) · Advances in Space Research · doi:10.1016/j.asr.2022.08.016 · Cited by 56
Wei, L., Chen, M., Xing, L., Wan, Q., Song, Y., Chen, Y., & Chen, Y. (2024) · Swarm and Evolutionary Computation · doi:10.1016/j.swevo.2023.101460 · Cited by 51
Reward Factor-Based Multiple Agile Satellites Scheduling With Energy and Memory Constraints
Chatterjee, A., & Tharmarasa, R. (2022) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2022.3146115 · Cited by 51
Zhou, Z., Chen, E., Wu, F., Chang, Z., & Xing, L. (2022) · Computers & Industrial Engineering · doi:10.1016/j.cie.2022.108890 · Cited by 50
Deep Reinforcement Learning for the Agile Earth Observation Satellite Scheduling Problem
Chun, J., Yang, W., Liu, X., Wu, G., He, L., & Xing, L. (2023) · Mathematics · doi:10.3390/math11194059 · Cited by 49
“For AEOSSP, Lemaˆtre et al. [2] proposed four heuristics: a greedy algorithm, dynamic programming, a constraint planning algorithm, and a local search algorithm.”
BackgroundMethodHu, X., Zhu, W., An, B., Jin, P., & Xia, W. (2018) · Computers & Operations Research · doi:10.1016/j.cor.2018.12.007 · Cited by 49
Onboard coordination and scheduling of multiple autonomous satellites in an uncertain environment
Yang, W., He, L., Liu, X., & Chen, Y. (2021) · Advances in Space Research · doi:10.1016/j.asr.2021.09.003 · Cited by 49
Multiple super-agile satellite collaborative mission planning for area target imaging
Lu, Z., Shen, X., Li, D., Li, D., Chen, Y., Wang, D., & Shen, S. (2023) · International Journal of Applied Earth Observation and Geoinformation · doi:10.1016/j.jag.2023.103211 · Cited by 49
Song, Y., Zhang, Z., Song, B., & Chen, Y. (2018) · Sustainable Computing Informatics and Systems · doi:10.1016/j.suscom.2018.11.009 · Cited by 48
Wu, G., Xiang, Z., Wang, Y., Gu, Y., & Witold Pedrycz, C. (2024) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2024.3416427 · Cited by 47
“Currently, there is limited research on super-agile satellites, with major studies still focusing on scheduling for traditional EOSs [12], [13], [14],[15],[16]andagilesatellites[17],[18],[19],[20],[21], [22].”
BackgroundPreference-Based Evolutionary Many-Objective Optimization for Agile Satellite Mission Planning
Li, L., Chen, H., Li, J., Jing, N., & Emmerich, M. (2018) · IEEE Access · doi:10.1109/access.2018.2859028 · Cited by 46
“The profit of each target (pr) is randomly generated in the range [1, 10] and the requested time of observation (rt) is a random value from 3 seconds to 6 seconds.”
BackgroundWu, X., Yang, Y., Sun, Y., Xie, Y., Song, X., & Huang, B. S. (2022) · Acta Astronautica · doi:10.1016/j.actaastro.2022.09.020 · Cited by 46
Robust Satellite Scheduling Approach for Dynamic Emergency Tasks
Zhai, X., Niu, X., Tang, H., Wu, L., & Shen, Y. (2015) · Mathematical Problems in Engineering · doi:10.1155/2015/482923 · Cited by 39
“Without loss of generality, the weights of all tasks are randomly distributed in [1, 10].”
Rescheduling of observing spacecraft using fuzzy neural network and ant colony algorithm
Li, Y., Wang, R., & Xu, M. (2014) · Chinese Journal of Aeronautics · doi:10.1016/j.cja.2014.04.027 · Cited by 42
Skobelev, P. O., Simonova, E., Zhilyaev, A., & Travin, V. (2017) · Procedia Computer Science · doi:10.1016/j.procs.2017.01.127 · Cited by 45
QUEST – A new quadratic decision model for the multi-satellite scheduling problem
Berger, J., Lo, N., & Barkaoui, M. (2020) · Computers & Operations Research · doi:10.1016/j.cor.2019.104822 · Cited by 37
Chang, Z., Zhou, Z., Xing, L., & Yao, F. (2021) · Memetic Computing · doi:10.1007/s12293-021-00333-w · Cited by 45
“The first category, known as the observation scheduling problem for earth observation satellite (OSPFEOS), mainly focuses on data acquisition [6, 19–21, 27, 31, 32, 38, 39, 57, 64].”
BackgroundMethodWang, M., Zhou, Z., Chang, Z., Chen, E., & Li, R. (2024) · Applied Soft Computing · doi:10.1016/j.asoc.2024.112575 · Cited by 43
Metaheuristics for a scheduling problem with rejection and tardiness penalties
Thevenin, S., Zufferey, N., & Widmer, M. (2014) · Journal of Scheduling · doi:10.1007/s10951-014-0395-8 · Cited by 46
“Examples of satellite scheduling problem can be found in Harrison et al. (1999), Lemaitre et al. (2002), Wei-Cheng and Chang (2005), and Zufferey et al. (2008).”
BackgroundDamiani, S., Verfaillie, G., & Charmeau, M. (2005) · Adaptive Agents and Multi-Agents Systems · doi:10.1145/1082473.1082543 · Cited by 43
“This setting is strongly different from the one of Earth observation, which has been extensively studied for many years, in the setting of individual satellites and in the one of fleets or constellations of satellites [21, 2, 26, 18, 23, 11, 15, 12].”
BackgroundSelf-citationTask Scheduling of Agile Satellites with Transition Time and Stereoscopic Imaging Constraints
Kim, J., Ahn, J., Choi, H., & Cho, D.-H. (2020) · Journal of Aerospace Information Systems · doi:10.2514/1.i010775 · Cited by 42
Area targets observation mission planning of agile satellite considering the drift angle constraint
(2018) · Journal of Astronomical Telescopes, Instruments, and Systems · doi:10.1117/1.jatis.4.4.047002 · Cited by 33
Nano-satellite swarm for SAR applications: design and robust scheduling
Pang, C. K., Kumar, A., Goh, C. H., & Le, C. V. (2015) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2014.140077 · Cited by 35
“On the contrary, the low mass of nanosats restricts their functionalities, including restrictions on power budget, system reliability, radar bandwidth, and onboard computational capability [7].”
BackgroundMultiobjective evolutionary algorithms based on target region preferences
Li, L., Wang, Y., Trautmann, H., Jing, N., & Emmerich, M. (2018) · Swarm and Evolutionary Computation · doi:10.1016/j.swevo.2018.02.006 · Cited by 41
Kandepi, R., Saini, H., George, R. K., Konduri, S., & Karidhal, R. (2024) · Acta Astronautica · doi:10.1016/j.actaastro.2024.03.027 · Cited by 39
Local Search on SAT-encoded Colouring Problems
Prestwich, S. (2004) · Lecture notes in computer science · doi:10.1007/978-3-540-24605-3_9 · Cited by 39
(2005) · Cited by 38
Wang, X., Han, C. S., Zhang, R., & Gu, Y. (2019) · IEEE Access · doi:10.1109/access.2019.2925704 · Cited by 38
“The intelligence algorithms including genetic algorithm [9], [16], [17], local search algorithm [18] and ant colony optimization [19] have been widely applied for the EOS scheduling.”
BackgroundMethod
Metadata
- Authors
- Lemaı̂tre, M., Verfaillie, G., Jouhaud, F., Lachiver, J.-M., & Bataille, N.
- Affiliations
- Office National d'Études et de Recherches Aérospatiales (FR)
- Centre National d'Études Spatiales (FR)
- Corresponding author
- Lemaı̂tre, Michel
- Venue
- Aerospace Science and Technology
- Publisher
- Elsevier BV
- Published
- 2002-09
- Volume
- 6
- Issue
- 5
- Pages
- 367-381
- ISSN
- 1270-9638 (ISSN-L)
- OpenAlex
- W2110599800
- Cited by
- 472
- References
- 20
- Citations by year
- 2026: 39 · 2025: 55 · 2024: 60 · 2023: 34 · 2022: 19 · 2021: 29 · 2020: 27 · 2019: 35 · 2018: 30 · 2017: 20 · 2016: 16 · 2015: 15 · 2014: 11 · 2013: 13 · 2012: 11
- FWCI
- 15.43
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.elsevier.com/tdm/userlicense/1.0/ (tdm)
- Locations
- Aerospace Science and Technology (publishedVersion)
- Topics
- Physical Sciences › Engineering › Aerospace Engineering › Satellite Communication Systems
- Physical Sciences › Engineering › Aerospace Engineering › Spacecraft Dynamics and Control
- Physical Sciences › Engineering › Aerospace Engineering › Spacecraft Design and Technology
- Keywords
- AGILE satellite, Earth observation satellites, observation scheduling, observation selection, Pleiades, combinatorial optimization, greedy algorithm, dynamic programming, constraint programming, local search
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.