The DOI matches its Crossref record; 88 of the 91 references it cites were found in a registry or an index.
Construction with digital twin information systems
Open accessAbstract
The concept of a “digital twin” as a model for data-driven management and control of physical systems has emerged over the past decade in the domains of manufacturing, production, and operations. In the context of buildings and civil infrastructure, the notion of a digital twin remains ill-defined, with little or no consensus among researchers and practitioners of the ways in which digital twin processes and data-centric technologies can support design and construction. This paper builds on existing concepts of Building Information Modeling (BIM), lean project production systems, automated data acquisition from construction sites and supply chains, and artificial intelligence to formulate a mode of construction that applies digital twin information systems to achieve closed loop control systems. It contributes a set of four core information and control concepts for digital twin construction (DTC), which define the dimensions of the conceptual space for the information used in DTC workflows. Working from the core concepts, we propose a DTC information system workflow—including information stores, information processing functions, and monitoring technologies—according to three concentric control workflow cycles. DTC should be viewed as a comprehensive mode of construction that prioritizes closing the control loops rather than an extension of BIM tools integrated with sensing and monitoring technologies.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Improved management and outcomes through digital twin integration”
From Advancing civil infrastructure with digital twins: a review of applications and challenges (2025) · cites this paper as Sacks et al. (2020)
Citations
Cites
Deming, W. E. (1982) · Medical Entomology and Zoology · Cited by 7,297
The Information Age: Economy, Society and Culture
Castells, M. (1999) · Cited by 6,045
Digital Twin in manufacturing: A categorical literature review and classification
Kritzinger, W., Karner, M., Traar, G., Henjes, J., & Sihn, W. (2018) · IFAC-PapersOnLine · doi:10.1016/j.ifacol.2018.08.474 · Cited by 3,612 · cited 1×
“Although there is no commonly agreed conceptualization or definition of the term (Kritzinger et al., 2018; Gerber et al., 2019), numerous organizations have defined digital twins in terms of their functions and characteristics.”
BackgroundStanford Encyclopedia of Philosophy
Wahlberg, L. (2017) · Lund University Publications (Lund University) · Cited by 1,854
The Information Age: Economy, Society and Culture
Forsyth, A. (1999) · Journal of Planning Education and Research · doi:10.1177/0739456x9901900212 · Cited by 1,801
Axiomatic Design: Advances And Applications
Suh, N. P. (2001) · Cited by 1,694
Oesterreich, T. D., & Teuteberg, F. (2016) · Computers in Industry · doi:10.1016/j.compind.2016.09.006 · Cited by 1,529 · cited 1×
“This idea has spawned broad areas of research, such as Automated Project Performance Control (APPC) (Navon and Sacks, 2007), Construction 4.0 (Oesterreich and Teuteberg, 2016), and construction applications of technologies for acquisition of as-built geometry, including, for example, photogrammetry…”
BackgroundInfluentialTowards a semantic Construction Digital Twin: Directions for future research
Boje, C., Guerriero, A., Kubicki, S., & Rezgui, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103179 · Cited by 1,477
About The Importance of Autonomy and Digital Twins for the Future of Manufacturing
Rosen, R., von Wichert, G., Lo, G., & Bettenhausen, K. D. (2015) · IFAC-PapersOnLine · doi:10.1016/j.ifacol.2015.06.141 · Cited by 1,474 · cited 2×
“…and virtual counterparts, enabled by the development of advanced sensing (e.g., computer vision), internet of things (e.g., interconnected assets), high-speed networking (e.g., 5G internet), and advanced analytics (e.g., machine learning) technologies (Rosen et al., 2015; Gerber et al., 2019).”
BackgroundInfluentialApplication of the New Production Philosophy to Construction
Koskela, L., & Koskela, L. (1992) · Cited by 1,398
Digital twin-driven product design framework
Tao, F., Sui, F., Liu, A., Qi, Q., Zhang, M., Song, B., Guo, Z., Lu, S. C.-Y., & Nee, A. Y. C. (2018) · International Journal of Production Research · doi:10.1080/00207543.2018.1443229 · Cited by 1,290 · cited 2×
“According to Tao et al. (2019a), digital twins have three main elements: a physical artefact, a digital counterpart, and the connection that binds the two together.”
BackgroundAn exploration towards a production theory and its application to construction
Koskela, L. (2000) · Aaltodoc (Aalto University) · Cited by 1,236
THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL
Ballard, H. G. (2000) · University of Birmingham Institutional Research Archive (University of Birmingham) · Cited by 1,229
Floridi, L. (2011) · Oxford University Press eBooks · doi:10.1093/acprof:oso/9780199232383.001.0001 · Cited by 1,094
Emerging Artificial Intelligence Methods in Structural Engineering
Salehi, H., & Burgueño, R. (2018) · Engineering Structures · doi:10.1016/j.engstruct.2018.05.084 · Cited by 1,068
The conundrum of sharing research data
Borgman, C. L. (2012) · Journal of the American Society for Information Science and Technology · doi:10.1002/asi.22634 · Cited by 1,013 · cited 1×
“” Data-Centric Engineering e14-13 Kitchin (2014) reasoned that data refer to those elements that are “ taken ” (derived from the Latin “ capere ” ), for example, “ extracted through observations, computations, experiments, and record keeping ” (Borgman, 2012).”
BackgroundThe Digital Twin: Realizing the Cyber-Physical Production System for Industry 4.0
Uhlemann, T. H.-J., Lehmann, C., & Steinhilper, R. (2017) · Procedia CIRP · doi:10.1016/j.procir.2016.11.152 · Cited by 994 · cited 1×
“Digital twins are considered by some to represent a step in the evolution of manufacturing, capable of facilitating the implementation of Industry 4.0 principles (Rosen et al., 2015; Uhlemann et al., 2017).”
BackgroundInfluentialStanford encyclopedia of philosophy
(2000) · Choice Reviews Online · doi:10.5860/choice.37sup-195 · Cited by 976
(2003) · Cited by 969
Sacks, R., Eastman, C. M., Lee, G., & Teicholz, P. M. (2018) · Wiley eBooks · doi:10.1002/9781119287568 · Cited by 898 · cited 3×
“BIM encompasses the workflows and the technology for digital, object-oriented modeling of construction products and processes (Sacks et al., 2018).”
BackgroundMethodSelf-citationThe Data Revolution: Big Data, Open Data, Data Infrastructures and Their Consequences
(2015) · Online Information Review · doi:10.1108/oir-01-2015-0011 · Cited by 792 · cited 4×
“Broadly speaking, information is compiled by interpreting data , information is processed to create knowledge , and knowledge supports decisions and actions (Kitchin, 2014).”
BackgroundInfluentialGiere, R. N., & Laudan, L. (1978) · The American Historical Review · doi:10.2307/1861852 · Cited by 722
Interaction of Lean and Building Information Modeling in Construction
Sacks, R., Koskela, L., Dave, B. A., & Owen, R. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000203 · Cited by 691 · cited 1×
“This is one of the key potential synergies of lean construction and BIM (Sacks et al., 2010).”
BackgroundSelf-citationDigital Twin: Vision, Benefits, Boundaries, and Creation for Buildings
Khajavi, S. H., Motlagh, N. H., Jaribion, A., Werner, L. C., & Holmström, J. (2019) · IEEE Access · doi:10.1109/access.2019.2946515 · Cited by 677 · cited 1×
“For example, in addition to listing five differentiators between BIM models and digital twins, Khajavi et al. (2019) observed that the use of digital twins of buildings is restricted to building operation.”
Background(2014) · CERN Document Server (European Organization for Nuclear Research) · Cited by 608
Computer vision techniques for construction safety and health monitoring
Seo, J., Han, S., Lee, S. H., & Kim, H. (2015) · Advanced Engineering Informatics · doi:10.1016/j.aei.2015.02.001 · Cited by 563 · cited 1×
“Some notable exceptions prove the rule: for example, some collision alert systems employ separate technologies to locate heavy machinery (e.g., GPS) and workers (e.g., computer vision), merging the data to generate actionable information (Seo et al., 2015; Fang et al., 2018).”
BackgroundMaterial Waste in Building Industry: Main Causes and Prevention
Formoso, C. T., Soibelman, L., Cesare, C. M. D., & Isatto, E. L. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:4(316 · Cited by 434
Designing for Situation Awareness: An Approach to User-Centered Design, Second Edition
Endsley, M. R. (2016) · doi:10.1201/b11371 · Cited by 424
Cheng, T., & Teizer, J. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.10.017 · Cited by 398 · cited 1×
“Technologies that sound alarms to alert workers to imminent potential collisions or falls belong to this category (e.g., Cheng and Teizer, 2013).”
BackgroundBallard, G., & Howell, G. A. (2003) · Building Research & Information · doi:10.1080/09613210301997 · Cited by 366 · cited 1×
“As project production systems (Ballard and Howell, 2003), all significant construction projects require intense collaboration among large groups of independent designers, consultants, contractors, suppliers, and public agencies.”
BackgroundFang, W., Ding, L., Zhong, B., Love, P. E. D., & Luo, H. (2018) · Advanced Engineering Informatics · doi:10.1016/j.aei.2018.05.003 · Cited by 365 · cited 1×
“Some notable exceptions prove the rule: for example, some collision alert systems employ separate technologies to locate heavy machinery (e.g., GPS) and workers (e.g., computer vision), merging the data to generate actionable information (Seo et al., 2015; Fang et al., 2018).”
BackgroundA historical introduction to the philosophy of science
Losee, J. P. (1972) · Cited by 318
Borrmann, A. (2018) · Springer eBooks · doi:10.1007/978-3-319-92862-3 · Cited by 296
Yang, J., Park, M.-W., Vela, P. A., & Golparvar‐Fard, M. (2015) · Advanced Engineering Informatics · doi:10.1016/j.aei.2015.01.011 · Cited by 296 · cited 1×
“…(APPC) (Navon and Sacks, 2007), Construction 4.0 (Oesterreich and Teuteberg, 2016), and construction applications of technologies for acquisition of as-built geometry, including, for example, photogrammetry and laser scanning (Brilakis et al., 2010; Yang et al., 2015; Han and Golparvar-Fard, 2017).”
BackgroundInfluentialDigital Twin Driven Smart Manufacturing
Tao, F., Zhang, M., & Nee, A. Y. C. (2019) · Elsevier eBooks · doi:10.1016/c2018-0-02206-9 · Cited by 284 · cited 3×
“According to Tao et al. (2019a), digital twins have three main elements: a physical artefact, a digital counterpart, and the connection that binds the two together.”
BackgroundThe Poverty of Management Control Philosophy
Hofstede, G. (1978) · Academy of Management Review · doi:10.5465/amr.1978.4305727 · Cited by 277 · cited 1×
“First, it applied the reactive “ thermostat model ” of control (Hofstede, 1978).”
MethodBuilding Information Modelling, Artificial Intelligence and Construction Tech
Sacks, R., Girolami, M., & Brilakis, I. (2020) · Developments in the Built Environment · doi:10.1016/j.dibe.2020.100011 · Cited by 271 · cited 3×
“The results of other research suggest that property graph representations with late binding schema objects are apparently most appropriate (Sacks et al., 2020).”
BackgroundResultSelf-citationErgen, E., Akinci, B., & Sacks, R. (2006) · Automation in Construction · doi:10.1016/j.autcon.2006.07.004 · Cited by 263
Self-citationForbes, L. H., & Ahmed, S. M. (2010) · CRC Press eBooks · doi:10.1201/b10260 · Cited by 257 · cited 1×
“Modern construction planning and control can be understood as a sequence of concentric PDCA cycles because production in construction is recognized as executed in short-term project production systems amenable to continuous improvement (Koskela, 1992; Forbes and Ahmed, 2011).”
Automated project performance control of construction projects
Navon, R. (2004) · Automation in Construction · doi:10.1016/j.autcon.2004.09.006 · Cited by 248 · cited 1×
“Navon (2005) proposed a system termed “ APPC ” (Navon, 2005; Navon and Sacks, 2007), as shown in Figure 1.”
MethodSawhney, A., Riley, M., & Irizarry, J. (2020) · Routledge eBooks · doi:10.1201/9780429398100 · Cited by 230
Assessing research issues in Automated Project Performance Control (APPC)
Navon, R., & Sacks, R. (2006) · Automation in Construction · doi:10.1016/j.autcon.2006.08.001 · Cited by 225 · cited 5×
“This idea has spawned broad areas of research, such as Automated Project Performance Control (APPC) (Navon and Sacks, 2007), Construction 4.0 (Oesterreich and Teuteberg, 2016), and construction applications of technologies for acquisition of as-built geometry, including, for example, photogrammetry…”
BackgroundMethodInfluentialSelf-citationImplications of Construction 4.0 to the workforce and organizational structures
de Soto, B. G., Agustí-Juan, I., Joss, S., & Hunhevicz, J. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2019.1616414 · Cited by 218 · cited 1×
“Many authors have suggested that the same concept is applicable to the construction industry (e.g., García de Soto et al., 2019; Klinc and Turk, 2019; Sawhney et al., 2020).”
BackgroundHan, K. K., & Golparvar‐Fard, M. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.11.004 · Cited by 217 · cited 1×
“…(APPC) (Navon and Sacks, 2007), Construction 4.0 (Oesterreich and Teuteberg, 2016), and construction applications of technologies for acquisition of as-built geometry, including, for example, photogrammetry and laser scanning (Brilakis et al., 2010; Yang et al., 2015; Han and Golparvar-Fard, 2017).”
BackgroundInfluentialToward automated generation of parametric BIMs based on hybrid video and laser scanning data
Brilakis, I., Lourakis, M., Sacks, R., Savarese, S., Christodoulou, S. E., Teizer, J., & Makhmalbaf, A. (2010) · Advanced Engineering Informatics · doi:10.1016/j.aei.2010.06.006 · Cited by 206 · cited 1×
“…(APPC) (Navon and Sacks, 2007), Construction 4.0 (Oesterreich and Teuteberg, 2016), and construction applications of technologies for acquisition of as-built geometry, including, for example, photogrammetry and laser scanning (Brilakis et al., 2010; Yang et al., 2015; Han and Golparvar-Fard, 2017).”
BackgroundInfluentialSelf-citationOgunbiyi, O., Goulding, J. S., & Oladapo, A. A. (2013) · Construction Innovation · doi:10.1108/ci-08-2012-0045 · Cited by 200 · cited 1×
“…production planning and detailed product design during construction, based on well-informed and reliable “ what-if ” scenario assessments, can greatly reduce the waste that is inherent in construction (Formoso et al., 2002; Horman and Kenley, 2005; Gonzalez et al., 2007; Ogunbiyi et al., 2014).”
BackgroundHow Digital Information Transforms Project Delivery Models
Whyte, J. K. (2019) · Project Management Journal · doi:10.1177/8756972818823304 · Cited by 190 · cited 1×
“The deepening transformative impact of digital information on project delivery models in construction is already clearly evident (Whyte, 2019).”
BackgroundBuilding Information Modeling: Why? What? How?
Borrmann, A., König, M., Koch, C., & Beetz, J. (2018) · Springer eBooks · doi:10.1007/978-3-319-92862-3_1 · Cited by 188 · cited 1×
“For the purpose of their operation and maintenance, based largely on the BIM models produced through their design and construction (Aengenvoort and Krämer, 2018; Borrmann et al., 2018; Arup, 2019).”
MethodBuchmann, A., & Koldehofe, B. (2009) · it - Information Technology · doi:10.1524/itit.2009.9058 · Cited by 184 · cited 1×
“As construction progresses and data accumulate, the Interpret function applies complex event processing (CEP) to deduce what was done and what resources were consumed in doing it (Buchmann and Koldehofe, 2009).”
BackgroundA Historical Introduction to the Philosophy of Science
Landsberg, P. T., & Losee, J. P. (1975) · Leonardo · doi:10.2307/1573195 · Cited by 175 · cited 1×
“From the traditional perspective, functions of knowledge include description, explanation, and prediction of the behavior of phenomena (Losee, 2001).”
BackgroundLuo, X., Li, H., Cao, D., Yu, Y., Yang, X., & Huang, T. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.07.011 · Cited by 159
Park, J., Marks, E., Cho, Y. K., & Suryanto, W. (2015) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001031 · Cited by 159
Modern Construction: Lean Project Delivery and Integrated Practices
Sacks, R. (2013) · Construction Management and Economics · doi:10.1080/01446193.2013.763999 · Cited by 158
Self-citationWireless sensor networks for temperature and humidity monitoring within concrete structures
Barroca, N., Borges, L. M., Velez, F. J. D. S., Monteiro, F., Górski, M., & Castro-Gomes, J. P. (2013) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2012.11.087 · Cited by 156
Teicholz, P. M. (2013) · Wiley eBooks · doi:10.1002/9781119572633 · Cited by 154
Activity analysis of construction equipment using audio signals and support vector machines
Cheng, C.-F., Rashidi, A., Davenport, M. A., & Anderson, D. V. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.06.005 · Cited by 142
Costin, A. M., Pradhananga, N., & Teizer, J. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.02.015 · Cited by 139 · cited 1×
“This manual work is time-consuming and error-prone (Costin et al., 2012; Zhao et al., 2019).”
BackgroundToward a richer view of the scientific method: The role of conceptual analysis
Machado, A., & Silva, F. J. (2007) · American Psychologist · doi:10.1037/0003-066x.62.7.671 · Cited by 138 · cited 2×
“…with systematic observation/experimentation and quantification/mathematization, conceptual analysis forms an important part of the scientific method (Machado and Silva, 2007) and is focused on breaking down the concepts into elementary parts and studying their interdependencies (Beaney, 2018).”
BackgroundMethodRapid Automated Monitoring of Construction Site Activities Using Ultra-Wide Band
Teizer, J., Lao, D., & Sofer, M. (2007) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2007/0008 · Cited by 136
Location-Based Management for Construction: Planning, scheduling and control
Kenley, R., & Seppänen, O. (2006) · Swinburne figshare (Swinburne University of Technology) · Cited by 125
Supporting smart construction with dependable edge computing infrastructures and applications
Kochovski, P., & Stankovski, V. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.10.008 · Cited by 123
Construction 4.0 – Digital Transformation of One of the Oldest Industries
Klinc, R., & Turk, Ž. (2019) · Economic and business review · doi:10.15458/ebr.92 · Cited by 120
Quantifying Levels of Wasted Time in Construction with Meta-Analysis
Horman, M. J., & Kenley, R. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:1(52 · Cited by 113
Architecture-Based Comparative Advantage — A Design Information View of Manufacturing
Fujimoto, T. (2007) · Evolutionary and Institutional Economics Review · doi:10.14441/eier.4.55 · Cited by 102 · cited 2×
“Fujimoto considered manufacturing a flow of design information, in which productive assets are seen as information carriers, embodying design information (Fujimoto, 2007, 2019).”
BackgroundLévy, P. (2013) · doi:10.1002/9781118601471.part1 · Cited by 101
Location‐Based Management for Construction: Planning, Scheduling and Control
Gravitt, D. D. (2011) · Construction Management and Economics · doi:10.1080/01446193.2010.542469 · Cited by 101
What constitutes good production flow in construction?
Sacks, R. (2016) · Construction Management and Economics · doi:10.1080/01446193.2016.1200733 · Cited by 100 · cited 3×
“The primary flow is the flow of work itself, which is usually embodied as locations in a building (Kenley and Seppänen, 2010; Sacks, 2016).”
BackgroundMethodInfluentialSelf-citationA cyber-physical system approach for building efficiency monitoring
Bonci, A., Carbonari, A., Cucchiarelli, A., Messi, L., Pirani, M., & Vaccarini, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.02.010 · Cited by 86 · cited 1×
“In this context, most of the self-declared implementations of digital twins are limited to exploiting BIM as information stores and for visualizing information (Teicholz, 2013; Bonci et al., 2019).”
BackgroundPlatform use in systems building
Jansson, G., Johnsson, H., & Engström, D. (2013) · Construction Management and Economics · doi:10.1080/01446193.2013.793376 · Cited by 86 · cited 1×
“…been proposed (Mosca et al., 2020), including adoption of platform organizations in the context of construction management services delivered by startup companies as “ software-as-a-service ” solutions (e.g., Laine et al., 2017), and product platform models in house building (Jansson et al., 2014).”
BackgroundReal-time resource tracking for analyzing value-adding time in construction
Zhao, J., Seppänen, O., Peltokorpi, A., Badihi, B., & Olivieri, H. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.04.003 · Cited by 83 · cited 1×
“This manual work is time-consuming and error-prone (Costin et al., 2012; Zhao et al., 2019).”
BackgroundHow can ‘tasks made ready’ during lookahead planning impact reliable workflow and project duration?
Hamzeh, F., Zankoul, E., & Rouhana, C. (2015) · Construction Management and Economics · doi:10.1080/01446193.2015.1047878 · Cited by 78 · cited 1×
“Obtaining this information is especially difficult at the look ahead level (Hamzeh et al., 2015), and it is here that automated monitoring can be of particular benefit.”
BackgroundLongitudinal Study of BIM Adoption by Public Construction Clients
Gurevich, U., & Sacks, R. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000797 · Cited by 72 · cited 1×
“Obtaining this information is especially difficult at the look ahead level (Hamzeh et al., 2015), and it is here that automated monitoring can be of particular benefit.”
BackgroundSelf-citationScan-to-graph: Semantic enrichment of existing building geometry
Werbrouck, J., Pauwels, P., Bonduel, M., Beetz, J., & Bekers, W. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103286 · Cited by 62 · cited 1×
“Many researchers are currently tackling these problems (e.g., Wagner et al., 2020; Werbrouck et al., 2020).”
BackgroundConstruction Manager's BIM Handbook
Eynon, J. (2016) · Wiley eBooks · doi:10.1002/9781119163404 · Cited by 50
Lee, Y.-C., Scarpiniti, M., & Uncini, A. (2020) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000911 · Cited by 50
Zomer, T. T. D. S., Neely, A. D., Sacks, R., & Parlikad, A. K. (2020) · Construction Management and Economics · doi:10.1080/01446193.2020.1792522 · Cited by 41 · cited 1×
“This has been the experience of innovations such as lean construction and BIM (Zomer et al., 2020).”
BackgroundSelf-citationAction Research and Design in Information Systems
de Figueiredo, A. D., & da Cunha, P. R. (2007) · Integrated series on information systems/Integrated series in information systems · doi:10.1007/978-0-387-36060-7_4 · Cited by 40 · cited 1×
“However, in the context of productive sciences, knowledge also has a prescriptive function (de Figueiredo and da Cunha, 2007).”
BackgroundRepresenting construction-related geometry in a semantic web context: A review of approaches
Wagner, A., Bonduel, M., Pauwels, P., & Rüppel, U. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103130 · Cited by 40 · cited 1×
“Many researchers are currently tackling these problems (e.g., Wagner et al., 2020; Werbrouck et al., 2020).”
BackgroundDevelopments in the Built Environment
Aggelis, D. G. (2020) · Cited by 40
Koskela, L. (2020) · Routledge eBooks · doi:10.1201/9780429203732-1 · Cited by 35 · cited 1×
“This is manifested in the PDCA cycle, embodied in the different functions of production management, including production system design, production system operation (planning, execution, and control), and production system improvement (Koskela, 2020).”
BackgroundMonitoring concrete by means of embedded sensors and electromechanical impedance technique
Annamdas, V. G. M., & Rizzo, P. (2010) · Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE · doi:10.1117/12.847687 · Cited by 23
Linking Production-Level Workflow With Materials Supply
Arbulu, R., Koerckel, A., & España, F. (2005) · Cited by 23
Me, F. (2021) · Cited by 21
Platform Ecosystems: Unlocking the Subcontractors’ Business Model Opportunities
Laine, E., Alhava, O., Peltokorpi, A., & Seppänen, O. (2017) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2017/0325 · Cited by 17 · cited 1×
“…been proposed (Mosca et al., 2020), including adoption of platform organizations in the context of construction management services delivered by startup companies as “ software-as-a-service ” solutions (e.g., Laine et al., 2017), and product platform models in house building (Jansson et al., 2014).”
BackgroundRoadmap for delivering the information management framework for the built environment
Enzer, M., Bolton, A., Boulton, C., Byles, D., Cook, A., Dobbs, L., Hajj, P. A. E., Keaney, E., Kemp, A., Makri, C., et al. (2019) · Apollo (University of Cambridge) · doi:10.17863/cam.38227 · Cited by 14 · cited 1×
“…Digital Twin ” (NDT) — an interconnected ecosystem of digital twins, each modeling a component, a system, or a system of systems of buildings and infrastructure, connected via securely shared data — reflects the view of the nature of digital twins in the built environment (Enzer et al., 2019).”
BackgroundBIM in the Operation of Buildings
Aengenvoort, K., & Krämer, M. (2018) · Springer eBooks · doi:10.1007/978-3-319-92862-3_29 · Cited by 10 · cited 1×
“For the purpose of their operation and maintenance, based largely on the BIM models produced through their design and construction (Aengenvoort and Krämer, 2018; Borrmann et al., 2018; Arup, 2019).”
MethodInvestigating the Relationship Between Planning Reliability and Project Performance
Gonzalez, V., Alarcón, L. F., & Mundaca, F. (2007) · Cited by 5
Bew, M. (2016) · doi:10.1002/9781119163404.ch16 · Cited by 1 · cited 1×
“…provided through use of BIM in the procurement process of infrastructure assets has value in that it can provide the cornerstone for information systems for optimal operation of individual assets, of systems of assets, and indeed of systems of systems (Bew, 2016; Gurevich and Sacks, 2020).”
Method
Research works printed but not linked: 8
- Fujimoto, 2019, Key Concepts for Improving Supply Chain Robustness (Number 511; Discussion Paper Series, p. 21)
- Whyte, J , Fitzgerald, J , Mayfield, M , Coca, D , Pierce, K and Shah, N (2019) Projects as Interventions in Infrastructure Systems-of-systems, International Committee on Systems Engineering (INCOSE) International Symposium 2019, July 20–25, Orlando, USA.
- 2016, Virtual Construction 2007
- Bolton, 2018, Gemini Principles
- Eastman, 2011, BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Architects, Engineers, Contractors, and Fabricators
- Steup, 2018, The Stanford Encyclopedia of Philosophy
- Laudan, 1978, Progress and Its Problems: Towards a Theory of Scientific Growth, 282
- Floridi, 2019, The Stanford Encyclopedia of Philosophy
Cited by
Sorted by citations
Digital twin: benefits, use cases, challenges, and opportunities
Attaran, M., & Celik, B. G. (2023) · Decision Analytics Journal · doi:10.1016/j.dajour.2023.100165 · Cited by 704
Digital twin application in the construction industry: A literature review
Opoku, D.-G. J., Perera, S., Osei-Kyei, R., & Rashidi, M. (2021) · Journal of Building Engineering · doi:10.1016/j.jobe.2021.102726 · Cited by 753
Digital Twin applications toward Industry 4.0: A Review
Javaid, M., Haleem, A., & Suman, R. (2023) · Cognitive Robotics · doi:10.1016/j.cogr.2023.04.003 · Cited by 466
Shahzad, M., Shafiq, M. T., Douglas, D., & Kassem, M. (2022) · Buildings · doi:10.3390/buildings12020120 · Cited by 356
Delgado, J. M. D., & Oyedele, L. O. (2021) · Advanced Engineering Informatics · doi:10.1016/j.aei.2021.101332 · Cited by 272
Metadata
- Authors
- Sacks, R., Brilakis, I., Pikas, E., Xie, H. S., & Girolami, M.
- Affiliations
- Technion – Israel Institute of Technology (IL)
- University of Cambridge (GB)
- Aalto University (FI)
- Corresponding author
- Sacks, Rafael
- Venue
- Data-Centric Engineering
- Publisher
- Cambridge University Press (CUP)
- Published
- 2020
- Volume
- 1
- ISSN
- 2632-6736 (ISSN-L)
- OpenAlex
- W3107782157
- Cited by
- 609
- References
- 91
- Citations by year
- 2026: 133 · 2025: 129 · 2024: 128 · 2023: 106 · 2022: 73 · 2021: 40
- FWCI
- 29.01
- Type
- journal article
- Language
- en
- Open access
- gold
- doi.org
- Locations
- Data-Centric Engineering (publishedVersion, cc-by)
- DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion)
- Cambridge University Engineering Department Publications Database (submittedVersion)
- Apollo (University of Cambridge) (submittedVersion, cc-by)
- Apollo (cc-by)
- Funders
- Department for Business, Energy and Industrial Strategy, UK Government
- UK Research and Innovation
- University of Cambridge
- Engineering and Physical Sciences Research Council (EP/R034710/1)
- Innovate UK
- Topics
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Digital Transformation in Industry
- Physical Sciences › Engineering › Building and Construction › Construction Management and Sustainability
- Keywords
- digital twin, construction, building information modeling, lean construction, feedback control, construction information systems, construction monitoring, data acquisition, artificial intelligence in construction, civil infrastructure
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review