Understanding and managing new risks on the Nile with the Grand Ethiopian Renaissance Dam
Open accessThe DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Abstract
When construction of the Grand Ethiopian Renaissance Dam (GERD) is completed, the Nile will have two of the world’s largest dams—the High Aswan Dam (HAD) and the GERD—in two different countries (Egypt and Ethiopia). There is not yet agreement on how these dams will operate to manage scarce water resources. We elucidate the potential risks and opportunities to Egypt, Sudan and Ethiopia by simulating the filling period of the reservoir; a new normal period after the reservoir fills; and a severe multi-year drought after the filling. Our analysis illustrates how during filling the HAD reservoir could fall to levels not seen in recent decades, although the risk of water shortage in Egypt is relatively low. The new normal will benefit Ethiopia and Sudan without significantly affecting water users in Egypt. Management of multi-year droughts will require careful coordination if risks of harmful impacts are to be minimized.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Prospect Theory: An Analysis of Decision under Risk
Kahneman, D., & Tversky, A. (1979) · Econometrica · doi:10.2307/1914185 · Cited by 48,524
The spread of true and false news online
Vosoughi, S., Roy, D., & Aral, S. (2018) · Science · doi:10.1126/science.aap9559 · Cited by 8,847
Lazer, D. M. J., Baum, M. A., Benkler, Y., Berinsky, A. J., Greenhill, K. M., Menczer, F., Metzger, M. J., Nyhan, B., Pennycook, G., Rothschild, D., et al. (2018) · Science · doi:10.1126/science.aao2998 · Cited by 4,160
Cited by
Global water resources and the role of groundwater in a resilient water future
Scanlon, B. R., Fakhreddine, S., Rateb, A., de Graaf, I., Famiglietti, J., Gleeson, T., Grafton, R. Q., Jobbagy, E., Kebede, S., Kolusu, S. R., et al. (2023) · Nature Reviews Earth & Environment · doi:10.1038/s43017-022-00378-6 · Cited by 1,182
Drivers and impacts of Eastern African rainfall variability
Palmer, P. I., Wainwright, C. M., Dong, B., Maidment, R. I., Wheeler, K. G., Gedney, N., Hickman, J. E., Madani, N., Folwell, S. S., Abdo, G., et al. (2023) · Nature Reviews Earth & Environment · doi:10.1038/s43017-023-00397-x · Cited by 383
“Safely handling severe flooding and drought events requires close communication between managers of different dams, some of which will be across political borders, to avoid harm to co-riparian nations 151 and to avert international conflict 152 .”
BackgroundSelf-citationZisopoulou, K., & Panagoulia, D. (2021) · Water · doi:10.3390/w13121693 · Cited by 45
“The incoming volume of Nile water is constrained by treaties with Soudan [312] and by the Grand Ethiopian Renaissance Dam (GERD), where filling the dam will disrupt the flow into the Egyptian part of the Nile and the post-filling period might include a severe multi-year drought [313].”
BackgroundCross-border troubles? interstate river conflicts and intrastate violence
McLaughlin Mitchell, S. (2024) · Political Geography · doi:10.1016/j.polgeo.2024.103109 · Cited by 6
Metadata
- Authors
- Wheeler, K. G., Jeuland, M., Hall, J. W., Zagona, E., & Whittington, D.
- Venue
- Nature Communications
- Published
- 2020-10-16
- Volume
- 11
- Issue
- 1
- Pages
- 5222-5222
- ISSN
- 2041-1723 (ISSN-L)
- OpenAlex
- W3093318048
- Cited by
- 194
- References
- 3
- FWCI
- 32.72
- Type
- journal article
- Language
- en
- Open access
- gold
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Understanding and managing new risks on the Nile with the Grand Ethiopian Renaissance Dam. https://app.cochat.ai/papers/10.1038/s41467-020-19089-x
- The paper
- Wheeler, K. G., Jeuland, M., Hall, J. W., Zagona, E., & Whittington, D. (2020). Understanding and managing new risks on the Nile with the Grand Ethiopian Renaissance Dam. Nature Communications. https://doi.org/10.1038/s41467-020-19089-x
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.