Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near Optimum
The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Abstract
In the situation where a number of items must pass through a number of processes in the same order, it is suggested that the optimum (minimum total time) scheduling may be approximated by giving priority to items according to the extent to which process time increases with process number in order; this criterion is put in arithmetical form. This is confirmed by (a) a simple geometrical argument; (b) comparison with the known optimum schedules of a number of published three-process cases; (c) experiments on larger cases; it is not practical here to find the exact optimum.Methods are given for obtaining lower bounds which all scheduling times must equal or exceed; besides placing limits on the amount of effort to be expended, these bounds support the suggested approximate method.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Tables of random sampling numbers
Kendall, M. G., & Smith, B. B. (1946) · Medical Entomology and Zoology · Cited by 73
Cited by
Chapter 9 Sequencing and scheduling: Algorithms and complexity
Lawler, E. L., Lenstra, J. K., Rinnooy Kan, A. H. G., & Shmoys, D. B. (1993) · Handbooks in Operations Research and Management Science · doi:10.1016/s0927-0507(05)80189-6 · Cited by 761
Simulated annealing for permutation flow-shop scheduling
Osman, I., & Potts, C. (1989) · Omega · doi:10.1016/0305-0483(89)90059-5 · Cited by 614
A comprehensive review and evaluation of permutation flowshop heuristics
Ruiz, R., & Maroto, C. (2005) · European Journal of Operational Research · doi:10.1016/j.ejor.2004.04.017 · Cited by 579
Tasgetiren, M. F., Liang, Y.-C., Sevkli, M., & Gencyilmaz, G. (2007) · European Journal of Operational Research · doi:10.1016/j.ejor.2005.12.024 · Cited by 557
The job shop scheduling problem: Conventional and new solution techniques
Błażewicz, J., Domschke, W., & Pesch, E. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00362-2 · Cited by 536
Hybrid flow shop scheduling considering machine electricity consumption cost
Luo, H., Du, B., Huang, G. Q., Chen, H., & Li, X. (2013) · International Journal of Production Economics · doi:10.1016/j.ijpe.2013.01.028 · Cited by 381
Flowshop-scheduling problems with makespan criterion: a review
Reza Hejazi *, S., & Saghafian, S. (2005) · International Journal of Production Research · doi:10.1080/0020754050056417 · Cited by 342
Scheduling flow shops using differential evolution algorithm
Onwubolu, G., & Davendra, D. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2004.08.043 · Cited by 328
Ogbu, F. A., & Smith, D. K. (1990) · Computers & Operations Research · doi:10.1016/0305-0548(90)90001-n · Cited by 310
A discrete differential evolution algorithm for the permutation flowshop scheduling problem
Pan, Q.-K., Tasgetiren, M. F., & Liang, Y.-C. (2008) · Computers & Industrial Engineering · doi:10.1016/j.cie.2008.03.003 · Cited by 295
Abdel-Basset, M., Manogaran, G., El-Shahat, D., & Mirjalili, S. (2018) · Future Generation Computer Systems · doi:10.1016/j.future.2018.03.020 · Cited by 262
RetractedAn ant colony system for permutation flow-shop sequencing
Ying, K.-C., & Liao, C.-J. (2004) · Computers & Operations Research · doi:10.1016/s0305-0548(03)00038-8 · Cited by 178
“The idea of the length we use comes from the Palmer’s method [8], a quick method to obtain a near optimum solution of n=m=P=Cmax.”
MethodAnt colony optimization for multi-objective flow shop scheduling problem
Yagmahan, B., & Yenisey, M. M. (2008) · Computers & Industrial Engineering · doi:10.1016/j.cie.2007.08.003 · Cited by 160
“Several heuristic approaches for the flow shop scheduling problem have been developed (e.g. Dannenbring, 1977; Gupta, 1971; Hundal & Rajgopal, 1988; Nawaz, Enscore, & Ham, 1983; Palmer, 1965; Smith & Dudek, 1967; Widmer & Hertz, 1989).”
MethodAdaptive Simulation-Based Optimization for Production Scheduling: A Comparative Study
Quadras, D., Frazzon, E. M., Mendes, L. G., Pires, M. C., & Rodriguez, C. M. T. (2022) · IFAC-PapersOnLine · doi:10.1016/j.ifacol.2022.09.430 · Cited by 9
Metadata
- Authors
- Palmer, D. S.
- Venue
- Journal of the Operational Research Society
- Publisher
- Informa UK Limited
- Published
- 1965-03
- Volume
- 16
- Issue
- 1
- Pages
- 101-107
- ISSN
- 0160-5682 (ISSN-L)
- 1476-9360
- OpenAlex
- W2092732888
- Cited by
- 547
- References
- 1
- FWCI
- 48.50
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.