Impact of Change Orders on Labor Efficiency for Electrical Construction
The DOI matches its Crossref record.
Abstract
Change orders are a source of many disputes in today's construction industry. The issue at hand is whether or not the execution of change orders work has a negative impact on overall labor efficiency on a construction project. Previous literature demonstrates evidence that change orders affect labor efficiency. Attempts have been made to quantify these impacts by many researchers, with limited success. Using the electrical construction industry, a research study has been conducted to quantify the impacts of change orders on labor efficiency. In this paper, results of hypothesis testing and regression analysis are presented. A linear regression model that estimates the loss of efficiency, based on a number of independent variables, is also presented. The independent variables used in this model are (1) qualitative and quantitative criteria used to determine whether projects are impacted by changes or not; (2) the estimate of change order hours for the project as a percentage of the original estimate of work hours; (3) the estimate of change order hours for the project; and (4) the total number of years that the project manager had worked in the construction industry. Additional projects were used to validate the model, with an average error rate of 5%. The results of this research study are useful for owners, construction managers, general contractors, and electrical specialty contractors, because they provide a means to estimate the impact of a change order under certain project conditions. This research also identifies factors, which, when understood and effectively managed, may be used to mitigate the impact of a change order on project costs and efficiency.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects
Love, P. E. D. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:1(18 · Cited by 463
Critical Review of Labor Productivity Research in Construction Journals
Yi, W., & Chan, A. P. C. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000194 · Cited by 366
Taxonomy for change causes and effects in construction projects
Sun, M., & Meng, X. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.10.005 · Cited by 331
A quantitative assessment of the cost and time impact of variation orders on construction projects
Oladapo, A. A. (2007) · Journal of Engineering, Design and Technology · doi:10.1108/17260530710746597 · Cited by 93
Metadata
- Authors
- Hanna, A. S., Russell, J. S., Nordheim, E. V., & Bruggink, M. J.
- Venue
- Journal of Construction Engineering and Management
- Published
- 1999-08
- Volume
- 125
- Issue
- 4
- Pages
- 224-232
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(1999)125:4(224
- OpenAlex
- W2075839400
- Cited by
- 175
- References
- 0
- FWCI
- 3.52
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Impact of Change Orders on Labor Efficiency for Electrical Construction. https://app.cochat.ai/papers/10.1061/(asce)0733-9364(1999)125:4(224
- The paper
- Hanna, A. S., Russell, J. S., Nordheim, E. V., & Bruggink, M. J. (1999). Impact of Change Orders on Labor Efficiency for Electrical Construction. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)0733-9364(1999)125%3A4(224
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.