CoChat

Using Risk Analysis to Determine Construction Project Contingencies

Mak, Stephen, Picken, David · 2000 · Journal of Construction Engineering and Management
DOI 10.1061/(asce)0733-9364(2000)126:2(130
Cited by 165

The DOI matches its Crossref record.

Abstract

A contingency allowance is an amount of money used to provide for uncertainties associated with a construction project. Traditionally, it is a percentage addition on top of the base estimate. Estimating using risk analysis (ERA) is a methodology that can be used to substantiate the contingency by identifying uncertainties and estimating their financial implications. A study of the effect of ERA was carried out to compare the variability and consistency of the contingency estimates between non-ERA and ERA projects. This paper presents results of a survey that compares a total of 287 non-ERA and 45 ERA projects. The results show a highly significant difference in variation and consistency between these groups. It indicates successful use of the ERA method for public works projects to reduce unnecessary and exaggerated allowance for risk. However, the contingency allowance for ERA projects was still considered high. Improvement and refinement of the ERA method as well as recommendations on capital budgeting policy are suggested.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1061/(asce)0733-9364(2000)126:2(130)

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 165

Metadata

Authors
Mak, S., & Picken, D.
Venue
Journal of Construction Engineering and Management
Published
2000-03
Volume
126
Issue
2
Pages
130-136
ISSN
  • 0733-9364 (ISSN-L)
  • 1943-7862
DOI
10.1061/(asce)0733-9364(2000)126:2(130
OpenAlex
W2007278410
Cited by
165
References
0
FWCI
5.85
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Using Risk Analysis to Determine Construction Project Contingencies. https://app.cochat.ai/papers/10.1061/(asce)0733-9364(2000)126:2(130
The paper
Mak, S., & Picken, D. (2000). Using Risk Analysis to Determine Construction Project Contingencies. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)0733-9364(2000)126%3A2(130

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.