The DOI matches its Crossref record; 4 of the 4 references it cites were found in a registry or an index.
Design and Build Project Success Factors: Multivariate Analysis
Abstract
This study aimed to identify a set of project success factors for design and build (D&B) projects and examine the relative importance of these factors on project outcome. Six project success factors (project team commitment, contractor's competencies, risk and liability assessment, client's competencies, end-users' needs, and constraints imposed by end-users) were extracted from factor analysis of data provided by 53 participants of public-sector D&B projects through a questionnaire survey. Project team commitment, client's competencies, and contractor's competencies were found to be important to bring successful project outcome from the multiple regression findings. Contractor's competencies also contributed to project time performance. Project team members should also recognize that time and cost performance as well as quality of design and workmanship represent the key elements of overall success of D&B projects. Practitioners are advised to focus on teamwork and partnering for successful project completion. More research should be conducted to further explore the relationship between procurement method and project success factors.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Critical Success Factors for Construction Projects
Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M., & Coyle, M. (1992) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1992)118:1(94 · Cited by 478
CRITICAL SUCCESS FACTORS ACROSS THE PROJECT LIFE CYCLE
Al-Fahdawi, M. S., Rawi, O. S. A., & Hassan, A. S. (2025) · Journal of Al-Azhar University Engineering Sector · doi:10.21608/auej.2025.336575.1735 · Cited by 259
Project Characteristics for Successful Public-Sector Design-Build
Songer, A. D., & Molenaar, K. R. (1997) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1997)123:1(34 · Cited by 254
Optimal Allocation of Project Management Resources for Achieving Success
Jaselskis, E. J., & Ashley, D. B. (1991) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1991)117:2(321 · Cited by 158
Cited by
The Role of Trust and Contractual Safeguards on Cooperation in Non-equity Alliances
Lui, S. S., & Ngo, H.-Y. (2004) · Journal of Management · doi:10.1016/j.jm.2004.02.002 · Cited by 512
Factors affecting cost performance: evidence from Indian construction projects
Iyer, K. C., & Jha, K. N. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.10.003 · Cited by 504
Olawale, Y. A., & Sun, M. (2010) · Construction Management and Economics · doi:10.1080/01446191003674519 · Cited by 478
EXPLORING CRITICAL SUCCESS FACTORS FOR STAKEHOLDER MANAGEMENT IN CONSTRUCTION PROJECTS
Yang, J., Shen, G. Q., Ho, M., Drew, D. S., & Chan, A. P. C. (2009) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/1392-3730.2009.15.337-348 · Cited by 264
Self-citationBuvik, M. P., & Tvedt, S. D. (2017) · Project Management Journal · doi:10.1177/875697281704800202 · Cited by 99
Metadata
- Authors
- Chan, A. P. C., Ho, D. C. K., & Tam, C. M.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2001-04
- Volume
- 127
- Issue
- 2
- Pages
- 93-100
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2001)127:2(93
- OpenAlex
- W2157842787
- Cited by
- 316
- References
- 4
- FWCI
- 8.31
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Design and Build Project Success Factors: Multivariate Analysis. https://app.cochat.ai/papers/10.1061/(asce)0733-9364(2001)127:2(93
- The paper
- Chan, A. P. C., Ho, D. C. K., & Tam, C. M. (2001). Design and Build Project Success Factors: Multivariate Analysis. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)0733-9364(2001)127%3A2(93
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.