Management’s Perception of Key Performance Indicators for Construction
The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Abstract
There is a great need in the construction industry for identifying a set of common indicators to be used by construction executive and project managers in measuring construction performance at the project level. The focus of this research was to collect management perceptions of the key performance indicators currently utilized in the construction industry. Both quantitative performance indicators and qualitative performance indicators are represented. A literature search was used to generate the initial set of perceived key performance indicators, which were administered to the construction industry via a survey. A statistical analysis of the collected survey responses provided information for the identification of a common set of perceived Key Performance Indicators (KPIs) by construction sector, management level, and experience level. Correlations were performed for both the quantitative and qualitative indicators to determine which type of indicator is used most extensively. Basic statistical analyses and frequency distributions provided evidence in support of some of the hypotheses of the research. The results of the survey data analysis support the hypothesis that KPIs vary according to management’s perspective. Further analysis displayed a substantial difference between construction executive and project management’s perceptions. However, six indicators were reported as being most useful by every segment of the construction industry involved in this study. The correlation between quantitative indicators and qualitative indicators proved to be inconclusive.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Utilization-Focused Evaluation
(2018) · The SAGE Encyclopedia of Educational Research, Measurement, and Evaluation · doi:10.4135/9781506326139.n729 · Cited by 2,308
Productivity improvement in construction
Oglesby, C. H., Parker, H. W., & Howell, G. A. (1988) · Medical Entomology and Zoology · Cited by 510
Cited by
Toor, S.-U.-R., & Ogunlana, S. O. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.05.005 · Cited by 619
Critical success criteria for mass house building projects in developing countries
Ahadzie, D. K., Proverbs, D. G., & Olomolaiye, P. O. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.09.006 · Cited by 304
Building information modeling and safety management: A systematic review
Martínez-Aires, M. D., López-Alonso, M., & Martínez-Rojas, M. (2018) · Safety Science · doi:10.1016/j.ssci.2017.08.015 · Cited by 252
“In a recent survey (Issa and Suermann, 2009), questions collected data regarding perceptions about the effects of BIM on commonly accepted construction Key Performance Indicators (KPIs) that were defined by Cox et al. (2003): quality control, on time completion, cost, safety, $/unit, units/manhour.”
BackgroundFuture criteria for success of building projects in Malaysia
Al-Tmeemy, S. M. H. M., Abdul-Rahman, H., & Harun, Z. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.03.003 · Cited by 228
“As a consequence, there is a great need for identifying the key success criteria that address the construction industry projects to be used by construction executives and project managers to plan their resource allocation appropriately (Cox et al., 2003).”
BackgroundCritical Management Practices Influencing On-Site Waste Minimization in Construction Projects
Ajayi, S. O., Oyedele, L. O., Bilal, M., Akinade, O. O., Alaka, H. A., & Owolabi, H. A. (2017) · Waste Management · doi:10.1016/j.wasman.2016.10.040 · Cited by 200
Using Mixed Reality for electrical construction design communication
Chalhoub, J., & Ayer, S. K. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.10.028 · Cited by 189
Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia
Ali, H. A. E. M., Al-Sulaihi, I. A., & Al-Gahtani, K. S. (2013) · Journal of King Saud University - Engineering Sciences · doi:10.1016/j.jksues.2012.03.002 · Cited by 164
“KPIs are compilations of data measures used to assess the performance of a construction operation (Cox et al., 2003).”
Lee, W., Lin, K.-Y., Seto, E., & Migliaccio, G. C. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.06.012 · Cited by 163
Digital Literacy Key Performance Indicators for Sustainable Development
Radovanović, D., Holst, C., Belur, S. B., Srivastava, R., Houngbonon, G. V., Le Quentrec, E., Miliza, J., Winkler, A. S., & Noll, J. (2020) · Social Inclusion · doi:10.17645/si.v8i2.2587 · Cited by 161
Metadata
- Authors
- Cox, R. F., Issa, R. R. A., & Ahrens, D.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2003-04
- Volume
- 129
- Issue
- 2
- Pages
- 142-151
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2003)129:2(142
- OpenAlex
- W2072310756
- Cited by
- 336
- References
- 2
- FWCI
- 7.24
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.