AHP-Based Equipment Selection Model for Construction Projects
The DOI matches its Crossref record; 16 of the 16 references it cites were found in a registry or an index.
Abstract
Selection of equipment for construction projects, a key factor in the success of the project, is a complex process. Current models offered by the literature fail to provide adequate solutions for two major issues: the systematic evaluation of soft factors, and the weighting of soft benefits in comparison with costs. This paper presents a selection model based on analytic hierarchy process (AHP), a multiattribute decision analysis method, with a view to providing solutions for these two issues. The model has the capacity to handle a great number of different criteria in a way that truly reflects the complex reality, to incorporate the context and unique conditions of the project, and to allow for manifestation of user experience and subjective perception. The model was implemented in an in-house developed system that was improved and validated through testing by senior professionals. The main academic contribution of the study is in the modification of AHP to correspond with the nature of equipment selection and in its utilization as an effective means for the formalization of knowledge possessed by competent, experienced practitioners. On the practical side, the proposed model offers an efficient, convenient tool that forces the users into orderly, methodical thinking, guides them in making logical, consistent decisions, and provides a facility for all necessary computations.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The Analytic Hierarchy Process
SAATY, T. L., & KEARNS, K. P. (1985) · Analytical Planning · doi:10.1016/b978-0-08-032599-6.50008-8 · Cited by 15,357
Remarks on the Analytic Hierarchy Process
Dyer, J. S. (1990) · Management Science · doi:10.1287/mnsc.36.3.249 · Cited by 1,130
Application of the AHP in project management
Al-Harbi, K. M. A.-S. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00038-1 · Cited by 1,125
On a short-coming of Saaty's method of analytic hierarchies
Belton, V., & Gear, T. E. (1983) · Omega · doi:10.1016/0305-0483(83)90047-6 · Cited by 936
An Exposition of the AHP in Reply to the Paper “Remarks on the Analytic Hierarchy Process”
Saaty, T. L. (1990) · Management Science · doi:10.1287/mnsc.36.3.259 · Cited by 857
Saaty, T. L., & Vargas, L. G. (1982) · Springer eBooks · doi:10.1007/978-94-017-3383-0 · Cited by 415
Final contractor selection using the analytical hierarchy process
Fong, P. S. W., & Choi, S. K.-Y. (2000) · Construction Management and Economics · doi:10.1080/014461900407356 · Cited by 335
Evaluation of Advanced Construction Technology with AHP Method
Skibniewski, M. J., & Chao, L. (1992) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1992)118:3(577 · Cited by 244
An analytical hierarchy process based procurement selection method
Cheung, S.-O., Lam, T.-I., Leung, M.-Y., & Wan, Y.-W. (2001) · Construction Management and Economics · doi:10.1080/014461901300132401 · Cited by 166
An Experiment on the Numerical Modelling of Verbal Ratio Statements
Pöyhönen, M., Hämäläinen, R. P., & Salo, A. A. (1997) · Journal of Multi-Criteria Decision Analysis · doi:10.1002/(sici)1099-1360(199701)6:1 · Cited by 110
Gomes, M. I., & Martins, N. C. (2022) · CRC Press eBooks · doi:10.1201/9781003015154-5 · Cited by 86
Assessment of Life-Cycle Benefit-Cost of Composites in Construction
Hastak, M., & Halpin, D. W. (2000) · Journal of Composites for Construction · doi:10.1061/(asce)1090-0268(2000)4:3(103 · Cited by 73
Construction Methods and Planning
(2002) · Routledge eBooks · doi:10.4324/9780203478578 · Cited by 72
Advanced automation or conventional construction process?
Hastak, M. (1998) · Automation in Construction · doi:10.1016/s0926-5805(98)00047-8 · Cited by 67
Remarks on the application of the analytic hierarchy process to judgmental forecasting
Belton, V., & Goodwin, P. B. (1996) · International Journal of Forecasting · doi:10.1016/0169-2070(95)00643-5 · Cited by 63
Multiattribute decision analysis method for evaluating buildings and building systems
Norris, G. A., & Marshall, H. E. (1995) · doi:10.6028/nist.ir.5663 · Cited by 43
Cited by
Review of application of analytic hierarchy process (AHP) in construction
Darko, A., Chan, A. P. C., Ameyaw, E. E., Owusu, E. K., Pärn, E., & Edwards, D. J. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2018.1452098 · Cited by 721
A review of application of multi-criteria decision making methods in construction
Jato-Espino, D., Castillo-Lopez, E., Rodriguez-Hernandez, J., & Canteras-Jordana, J. C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.05.013 · Cited by 510
A review of multi-criteria decision-making methods for infrastructure management
Kabir, G., Sadiq, R., & Tesfamariam, S. (2014) · Structure and Infrastructure Engineering · doi:10.1080/15732479.2013.795978 · Cited by 437
Multi-criteria evaluation model for the selection of sustainable materials for building projects
Akadiri, P. O., Olomolaiye, P. O., & Chinyio, E. A. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.10.004 · Cited by 386
AMEYAW, E. E., HU, Y., SHAN, M., CHAN, A. P. C., & LE, Y. (2016) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/13923730.2014.945953 · Cited by 307
Metadata
- Authors
- Shapira, A., & Goldenberg, M.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2005-12
- Volume
- 131
- Issue
- 12
- Pages
- 1263-1273
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2005)131:12(1263
- OpenAlex
- W2084246129
- Cited by
- 184
- References
- 16
- FWCI
- 6.80
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.