Predicting Industrial Construction Labor Productivity Using Fuzzy Expert Systems
The DOI matches its Crossref record.
Abstract
The objective of this technical note is to illustrate the application of fuzzy expert systems to the modeling of a practical problem—that of predicting the labor productivity of two common industrial construction activities: rigging pipe and welding pipe. This note illustrates how to develop and test such a model, given the realistic constraints of subjective assessments, multiple contributing factors, and limitations on data sets. The factors that affect the productivity of each activity are identified, and fuzzy membership functions and expert rules are developed. The models are validated using data collected from an actual construction project. The resulting models are found to have high linguistic prediction accuracies. This note is of relevance to researchers by demonstrating how a fuzzy expert system can be developed and tested. It is of relevance to industry practitioners by illustrating how fuzzy logic and expert systems modeling can be exploited to help them solve real world problems.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Baduge, S. K., Thilakarathna, S., Perera, J. S., Arashpour, M., Sharafi, P., Teodosio, B., Shringi, A., & Mendis, P. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104440 · Cited by 1,007
Critical Review of Labor Productivity Research in Construction Journals
Yi, W., & Chan, A. P. C. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000194 · Cited by 366
Li, X., Chow, K. H., Zhu, Y., & Lin, Y. (2016) · Building and Environment · doi:10.1016/j.buildenv.2015.09.005 · Cited by 211
Fuzzy Monte Carlo Simulation and Risk Assessment in Construction
Sadeghi, N., Fayek, A. R., & Pedrycz, W. (2010) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/j.1467-8667.2009.00632.x · Cited by 204
“…modeling risk allocation in privately financed infrastructure projects (Jin and Doloi, 2009), predicting industrial construction labor productivity (Fayek and Oduba, 2005), saving energy in domestic heating systems (Villar et al., 2009), cost and life-cycle cost optimization of steel structures…”
BackgroundSelf-citationOverview of the Application of “Fuzzy Techniques” in Construction Management Research
Chan, A. P. C., Chan, D. W. M., & Yeung, J. F. Y. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000099 · Cited by 178
Metadata
- Authors
- Fayek, A. R., & Oduba, A.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2005-08
- Volume
- 131
- Issue
- 8
- Pages
- 938-941
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2005)131:8(938
- OpenAlex
- W2016010091
- Cited by
- 119
- References
- 0
- FWCI
- 0.69
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Predicting Industrial Construction Labor Productivity Using Fuzzy Expert Systems. https://app.cochat.ai/papers/10.1061/(asce)0733-9364(2005)131:8(938
- The paper
- Fayek, A. R., & Oduba, A. (2005). Predicting Industrial Construction Labor Productivity Using Fuzzy Expert Systems. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)0733-9364(2005)131%3A8(938
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.