The DOI matches its Crossref record.
Fuzzy Monte Carlo Simulation and Risk Assessment in Construction
Open accessAbstract
Monte Carlo simulation has been used extensively for addressing probabilistic uncertainty in range estimating for construction projects. However, subjective and linguistically expressed information results in added non‐probabilistic uncertainty in construction management. Fuzzy logic has been used successfully for representing such uncertainties in construction projects. In practice, an approach that can handle both random and fuzzy uncertainties in a risk assessment model is necessary. This article discusses the deficiencies of the available methods and proposes a Fuzzy Monte Carlo Simulation (FMCS) framework for risk analysis of construction projects. In this framework, we construct a fuzzy cumulative distribution function as a novel way to represent uncertainty. To verify the feasibility of the FMCS framework and demonstrate its main features, the authors have developed a special purpose simulation template for cost range estimating. This template is employed to estimate the cost of a highway overpass project.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Machine learning algorithms for construction projects delay risk prediction
Gondia, A., Siam, A., El-Dakhakhni, W., & Nassar, A. H. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001736 · Cited by 327
Smart structures: Part I—Active and semi-active control
Fisco, N. R., & Adeli, H. (2011) · Scientia Iranica · doi:10.1016/j.scient.2011.05.034 · Cited by 270
Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2019-0047 · Cited by 172
Islam, M. S., Nepal, M. P., Skitmore, M., & Attarzadeh, M. (2017) · Advanced Engineering Informatics · doi:10.1016/j.aei.2017.06.001 · Cited by 163
Risk assessment of construction projects using Monte Carlo simulation
Qazi, A., & Simsekler, M. C. E. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-03-2020-0097 · Cited by 41
Metadata
- Authors
- Sadeghi, N., Fayek, A. R., & Pedrycz, W.
- Venue
- Computer-Aided Civil and Infrastructure Engineering
- Publisher
- Elsevier BV
- Published
- 2010-03-19
- Volume
- 25
- Issue
- 4
- Pages
- 238-252
- ISSN
- 1093-9687 (ISSN-L)
- 1467-8667
- OpenAlex
- W2058350584
- Cited by
- 204
- References
- 0
- FWCI
- 11.28
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Fuzzy Monte Carlo Simulation and Risk Assessment in Construction. https://app.cochat.ai/papers/10.1111/j.1467-8667.2009.00632.x
- The paper
- Sadeghi, N., Fayek, A. R., & Pedrycz, W. (2010). Fuzzy Monte Carlo Simulation and Risk Assessment in Construction. Computer-Aided Civil and Infrastructure Engineering. https://doi.org/10.1111/j.1467-8667.2009.00632.x
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.