Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 268

The DOI matches its Crossref record; 13 of the 13 references it cites were found in a registry or an index.

Lean Processes for Sustainable Project Delivery

Lapinski, Anthony R., Horman, Michael J., Riley, David R.·2006·Journal of Construction Engineering and Management
DOI 10.1061/(asce)0733-9364(2006)132:10(1083

Abstract

Facility owners and project teams often struggle to engage “green” or “sustainable” requirements on building projects and can incur additional project costs as a result. Although “investments” in high performance building features can be paid back through operational savings, the project delivery methods currently adopted by most teams are laden with process waste. Lean production principles have been proven to reduce waste and improve process performance in highly complex development and production environments. Adopting these lean principles, this paper reports a study that identified the presence of value and waste in a sustainable building project. Through an empirical investigation of the Real Estate and Facilities Division of Toyota Motor Sales, Toyota’s capital facility delivery process was mapped to identify both the steps in project delivery critical for success (value) and those that are waste. The investigation focused on the South Campus Facility, which received U.S. Green Building Council’s Leadership in Energy and Environmental Design Gold certification at a project cost equivalent to a conventional facility. Through post hoc process-based analysis, insight about what added value and waste in sustainable project delivery at Toyota was obtained. The results also identify further improvement opportunities to Toyota’s delivery process. For corporate facility owners and the Architecture Engineering Construction industry, the results unearth insights about how to successfully and economically deliver sustainable facilities.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1061/(asce)0733-9364(2006)132:10(1083)

Cites

13 of 13 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 13 references

Cited by

See all 268

Metadata

Authors
Lapinski, A. R., Horman, M. J., & Riley, D. R.
Venue
Journal of Construction Engineering and Management
Published
2006-10
Volume
132
Issue
10
Pages
1083-1091
ISSN
  • 0733-9364 (ISSN-L)
  • 1943-7862
DOI
10.1061/(asce)0733-9364(2006)132:10(1083
OpenAlex
W2056084810
Cited by
268
References
13
FWCI
19.73
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Lean Processes for Sustainable Project Delivery. https://app.cochat.ai/papers/10.1061/(asce)0733-9364(2006)132:10(1083
The paper
Lapinski, A. R., Horman, M. J., & Riley, D. R. (2006). Lean Processes for Sustainable Project Delivery. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)0733-9364(2006)132%3A10(1083

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.