Cited by 48BIM and Construction IntegrationConstruction Management and SustainabilitySustainable Building Design and Assessment

Sustainability by information and communication technology: A paradigm shift for construction projects in Iran

Open access
Hosseini, M. Reza, Banihashemi, Saeed, Rameezdeen, Raufdeen, Golizadeh, Hamed, Arashpour, Mehrdad, Ma, Le·2017·Journal of Cleaner Production

Integrity signals

Registry

Crossref · 10.1016/j.jclepro.2017.08.200

Cites

70 of 70 references verified0 citation errors · 0 not checkable

Statistics

Recomputing p-values needs the paper’s full text.

Claims the paper makes

We couldn’t retrieve this paper’s full text, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Cites

Flagged first, then by citations

Cited by

Sorted by citations

Authors
Hosseini, M. R., Banihashemi, S., Rameezdeen, R., Golizadeh, H., Arashpour, M., & Ma, L.
Affiliations
  • Deakin University (AU)
  • University of Canberra (AU)
  • University of South Australia (AU)
  • Queensland University of Technology (AU)
  • RMIT University (AU)
Corresponding author
Hosseini, M. Reza
Venue
Journal of Cleaner Production
Publisher
Elsevier BV
Published
2017-12
Volume
168
Pages
1-13
ISSN
0959-6526 (ISSN-L)
OpenAlex
W2752529576
Cited by
48
References
70
Citations by year
2025: 7 · 2024: 10 · 2023: 3 · 2022: 7 · 2021: 7 · 2020: 4 · 2019: 8 · 2018: 2
FWCI
3.58
Type
journal article
Language
en
Open access
Locations
  • Journal of Cleaner Production (publishedVersion)
  • RMIT Research Repository (RMIT University Library) (submittedVersion)
  • Adelaide Research & Scholarship (AR&S) (University of Adelaide) (submittedVersion)
  • Figshare (submittedVersion, cc-by)
  • UTS ePRESS (University of Technology Sydney) (submittedVersion)
Topics
  • Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
  • Physical Sciences › Engineering › Building and Construction › Construction Management and Sustainability
  • Physical Sciences › Engineering › Building and Construction › Sustainable Building Design and Assessment
Keywords
information and communication technologies, sustainable construction, construction project delivery, project managers, process optimization, media substitution, ICT adoption, developing countries, Iran

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review