Student or educator? Sign up with your school email and get 6 months of Pro free.
CoChat
Cited by 166

The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.

Determinants of Successful Design-Build Projects

Lam, Edmond W., Chan, Albert P., Chan, Daniel W. · 2008 · Journal of Construction Engineering and Management
DOI 10.1061/(asce)0733-9364(2008)134:5(333

Abstract

A construction project is mostly initiated by the needs of the client. In order to satisfy the client’s requirements in terms of time, cost, and quality, various procurement methods are recommended for selection to increase the chance of success for the complex sequence of activities. Design-build (D&B) integrates design and construction to overcome some of the hurdles inherent in the traditional design-bid-build method. It has been extensively used worldwide and its distinctive features are claimed to deal with the problems of the traditional design-bid-build method. An investigation into the determinants of successful D&B projects can therefore help set a benchmark study for industry practitioners to compare their project performance. To better indicate the success level of D&B projects, the writers developed a project success index for D&B projects in the Hong Kong context, which is assessed by the key project performance indicators of time, cost, quality, and functionality. Multiple regression analysis is then applied to show that the project nature, the effective project management action, and the adoption of innovative management approaches are the critical success factors for D&B projects. The identification of success criteria can furnish project participants with indicators to attain success for their D&B projects for benchmarking and control purposes. The predictors for D&B project success were also determined to enrich the knowledge base for the D&B procurement system.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1061/(asce)0733-9364(2008)134:5(333)

Cites

3 of 3 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 3 references

Cited by

See all 166

Metadata

Authors
Lam, E. W., Chan, A. P., & Chan, D. W.
Venue
Journal of Construction Engineering and Management
Published
2008-05
Volume
134
Issue
5
Pages
333-341
ISSN
  • 0733-9364 (ISSN-L)
  • 1943-7862
DOI
10.1061/(asce)0733-9364(2008)134:5(333
OpenAlex
W1985519090
Cited by
166
References
3
FWCI
12.81
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Determinants of Successful Design-Build Projects. https://app.cochat.ai/papers/10.1061/(asce)0733-9364(2008)134:5(333
The paper
Lam, E. W., Chan, A. P., & Chan, D. W. (2008). Determinants of Successful Design-Build Projects. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)0733-9364(2008)134%3A5(333

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.