Determinants of Successful Design-Build Projects
The DOI matches its Crossref record; 21 of the 21 references it cites were found in a registry or an index.
Abstract
A construction project is mostly initiated by the needs of the client. In order to satisfy the client’s requirements in terms of time, cost, and quality, various procurement methods are recommended for selection to increase the chance of success for the complex sequence of activities. Design-build (D&B) integrates design and construction to overcome some of the hurdles inherent in the traditional design-bid-build method. It has been extensively used worldwide and its distinctive features are claimed to deal with the problems of the traditional design-bid-build method. An investigation into the determinants of successful D&B projects can therefore help set a benchmark study for industry practitioners to compare their project performance. To better indicate the success level of D&B projects, the writers developed a project success index for D&B projects in the Hong Kong context, which is assessed by the key project performance indicators of time, cost, quality, and functionality. Multiple regression analysis is then applied to show that the project nature, the effective project management action, and the adoption of innovative management approaches are the critical success factors for D&B projects. The identification of success criteria can furnish project participants with indicators to attain success for their D&B projects for benchmarking and control purposes. The predictors for D&B project success were also determined to enrich the knowledge base for the D&B procurement system.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1997) · Chemometrics in Environmental Analysis · doi:10.1002/352760216x.ch5 · Cited by 18,653
An Index of Factorial Simplicity
Kaiser, H. F. (1974) · Psychometrika · doi:10.1007/bf02291575 · Cited by 14,898
Regression Diagnostics: Identifying Influential Data and Sources of Collinearity
Belsley, D. A., Kuh, E., & Welsch, R. E. (1980) · Wiley Series in Probability and Statistics · doi:10.1002/0471725153 · Cited by 7,297
Regression Diagnostics -- Identifying Influential Data and Sources of Collinearity
Beaumont, C. D., Belsley, D. A., Kuh, E., & Welsch, R. E. (1981) · The Journal of the Operational Research Society · doi:10.2307/2581267 · Cited by 6,359
Sample size in factor analysis.
MacCallum, R. C., Widaman, K. F., Zhang, S., & Hong, S. (1999) · Psychological Methods · doi:10.1037/1082-989x.4.1.84 · Cited by 5,497
Factor Analysis: Statistical Methods and Practical Issues
Kim, J.-O., & Mueller, C. W. (1978) · Cited by 2,778
A tutorial on Principal Components Analysis
Smith, L. I. (2002) · Otago University Research Archive (University of Otago) · Cited by 1,636
SPSS 13.0 : Guide to data analysis
Norušis, M. J. (1995) · Cited by 1,418
Nederlandse samenvatting en bewerking van 'Multivariate data analysis, 4th Edition, 1995'
Groenland, E. A. G., Hair, J. F., Anderson, R., Tatham, R. L., & Black, W. C. (1998) · Data Archiving and Networked Services (DANS) · Cited by 1,030
Business Statistics: Contemporary Decision Making
Carbno, C. (2007) · Technometrics · doi:10.1198/tech.2007.s691 · Cited by 566
Cited by
Alzahrani, J. I., & Emsley, M. W. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.06.006 · Cited by 344
Critical Project Management Factors of AEC Firms for Delivering Green Building Projects in Singapore
Li, Y. Y., Chen, P.-H., Chew, D. A. S., Teo, C. C., & Ding, R. G. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000370 · Cited by 174
Evaluation of project success: a structured literature review
Albert, M., Balve, P., & Spang, K. (2017) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-01-2017-0004 · Cited by 166
Metadata
- Authors
- Lam, E. W., Chan, A. P., & Chan, D. W.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2008-05
- Volume
- 134
- Issue
- 5
- Pages
- 333-341
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2008)134:5(333
- OpenAlex
- W1985519090
- Cited by
- 166
- References
- 21
- FWCI
- 12.81
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.