The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Integrating Construction Process Documentation into Building Information Modeling
Abstract
The research described in this paper extends the use of building information modeling (BIM) throughout the construction phase of the project life cycle. The owner is a military base that uses three-dimensional (3D) modeling for underground services and the footprints of the buildings. They were interested in determining the feasibility of capturing the construction process and related documents into a similar format. The research was conducted in parallel with traditional methods. The objectives of this project were to create a 3D as-built model, a four-dimensional as-built model, and attach the construction process information to the model for the owner to use after construction. A literature review indicates that BIM application stops at the preconstruction phase with a limited amount of research regarding data collection of the construction process. Significant contributions include practical 3D data collection methods and extending the BIM software products to accommodate construction process documentation. Results indicate that BIM software is not specifically prepared to accomplish these objectives and some modification to procedures as well as software were necessary for the BIM to capture the construction process documentation.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Cost Analysis of Inadequate Interoperability in the U.S. Capital Facilities Industry
Gallaher, M. P., O'Connor, A. C., Dettbarn, Jr., & Gilday, L. T. (2004) · doi:10.6028/nist.gcr.04-867 · Cited by 663
Feasibility Study of 4D CAD in Commercial Construction
Koo, B., & Fischer, M. A. (2000) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2000)126:4(251 · Cited by 485
ELECTRONIC DOCUMENT MANAGEMENT IN CONSTRUCTION - RESEARCH ISSUES AND RESULTS
Björk, B. (2003) · Journal of Information Technology in Construction · Cited by 66
Cited by
BIM implementation throughout the UK construction project lifecycle: An analysis
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.09.001 · Cited by 749
Big Data in the construction industry: A review of present status, opportunities, and future trends
Bilal, M., Oyedele, L. O., Qadir, J., Munir, K., Ajayi, S. O., Akinade, O. O., Owolabi, H. A., Alaka, H. A., & Pasha, M. (2016) · Advanced Engineering Informatics · doi:10.1016/j.aei.2016.07.001 · Cited by 734
Yeheyis, M., Hewage, K., Alam, M. S., Eskicioglu, C., & Sadiq, R. (2013) · Clean Technologies and Environmental Policy · doi:10.1007/s10098-012-0481-6 · Cited by 640
Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
Irizarry, J., Karan, E. P., & Jalaei, F. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.005 · Cited by 481
A scientometric review of global BIM research: Analysis and visualization
Zhao, X. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.04.002 · Cited by 434
Metadata
- Authors
- Goedert, J. D., & Meadati, P.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2008-07
- Volume
- 134
- Issue
- 7
- Pages
- 509-516
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2008)134:7(509
- OpenAlex
- W2162298694
- Cited by
- 273
- References
- 3
- FWCI
- 20.35
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Integrating Construction Process Documentation into Building Information Modeling. https://app.cochat.ai/papers/10.1061/(asce)0733-9364(2008)134:7(509
- The paper
- Goedert, J. D., & Meadati, P. (2008). Integrating Construction Process Documentation into Building Information Modeling. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)0733-9364(2008)134%3A7(509
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.