The DOI matches its Crossref record; 8 of the 8 references it cites were found in a registry or an index.
Measuring the Impact of Rework on Construction Cost Performance
Abstract
Rework continues to affect both cost and schedule performance throughout the construction industry. The direct costs alone often tally to 5% of the total construction costs. Using the data obtained from 359 construction projects in the Construction Industry Institute database, this paper assesses the impacts of rework on construction cost performance for projects in various categories. In addition, it identifies the sources of this rework, permitting further analyses and the development of rework reduction initiatives. The results of this study establish that the impacts of rework differ according to project characteristics and that the sources of rework having the greatest impact are not significantly different among project categories. By recognizing the impacts of rework and its sources, the construction industry can reduce rework and ultimately improve project cost performance.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Quantifying the causes and costs of rework in construction
Love, P. E. D., & Li, H. (2000) · Construction Management and Economics · doi:10.1080/01446190050024897 · Cited by 486
Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects
Love, P. E. D. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:1(18 · Cited by 463
The causes and costs of defects in construction
Josephson, P.-E., & Hammarlund, Y. (1999) · Automation in Construction · doi:10.1016/s0926-5805(98)00114-9 · Cited by 410
Quality failure costs in civil engineering projects
Barber, P., Graves, A., Hall, M., et al. (2000) · International Journal of Quality & Reliability Management · doi:10.1108/02656710010298544 · Cited by 213
Determining the causal structure of rework influences in construction
LOVE, P. E. D., MANDAL, P., & LI, H. (1999) · Construction Management and Economics · doi:10.1080/014461999371420 · Cited by 211
Rework: a symptom of a dysfunctional supply-chain
Love, P. E. D., Li, H., & Mandal, P. (1999) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(98)00017-3 · Cited by 134
Auditing the indirect consequences of rework in construction: a case based approach
Love, P. E. D. (2002) · Managerial Auditing Journal · doi:10.1108/02686900210419921 · Cited by 119
Love, P. E. D., Zahir Irani, A., & Edwards, D. J. (2003) · Project Management Journal · doi:10.1177/875697280303400303 · Cited by 100
Cited by
Computer vision applications in construction: Current state, opportunities & challenges
Paneru, S., & Jeelani, I. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103940 · Cited by 287
Eybpoosh, M., Dikmen, I., & Talat Birgonul, M. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000382 · Cited by 217
Critical Management Practices Influencing On-Site Waste Minimization in Construction Projects
Ajayi, S. O., Oyedele, L. O., Bilal, M., Akinade, O. O., Alaka, H. A., & Owolabi, H. A. (2017) · Waste Management · doi:10.1016/j.wasman.2016.10.040 · Cited by 200
Metadata
- Authors
- Hwang, B.-G., Thomas, S. R., Haas, C. T., & Caldas, C. H.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2009-03
- Volume
- 135
- Issue
- 3
- Pages
- 187-198
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2009)135:3(187
- OpenAlex
- W2098368104
- Cited by
- 352
- References
- 8
- FWCI
- 12.18
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Measuring the Impact of Rework on Construction Cost Performance. https://app.cochat.ai/papers/10.1061/(asce)0733-9364(2009)135:3(187
- The paper
- Hwang, B.-G., Thomas, S. R., Haas, C. T., & Caldas, C. H. (2009). Measuring the Impact of Rework on Construction Cost Performance. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)0733-9364(2009)135%3A3(187
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.