Development of Lean Model for House Construction Using Value Stream Mapping
The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Abstract
Lean construction has recently attracted considerable attention in the home building industry. Lengthy delivery time and significant waste in the construction process have caused many home builders to seek a more effective production model that will increase process reliability, reduce total lead time, and improve quality. However, although housing construction provides the closest analogy to manufacturing, a high level of variability prevents the direct transplantation of lean paradigm and techniques. In collaboration with a local home builder, a systematic approach based on value stream mapping technique is developed in this research to analyze the current process and to formulate a lean production model. The model has four main features: synchronized first-in, first-out lane-based flow, production leveling at pacemaker, work restructuring, and improved operation reliability. A simulation template is built to verify the model and to assist in the development of interim implementation models. This paper presents data collection and value stream selection, current practice analysis, and specific changes proposed for the lean production model.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Lean Thinking—Banish Waste and Create Wealth in your Corporation
Womack, J. P., & Jones, D. T. (1997) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600967 · Cited by 2,122
Cited by
Lean manufacturing: literature review and research issues
Bhamu, J., & Singh Sangwan, K. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-08-2012-0315 · Cited by 983
Strategies for Applying the Circular Economy to Prefabricated Buildings
Minunno, R., O’Grady, T., Morrison, G. M., Gruner, R. L., & Colling, M. (2018) · Buildings · doi:10.3390/buildings8090125 · Cited by 270
Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization
O’Connor, J. T., O’Brien, W. J., & Choi, J. O. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000842 · Cited by 161
Metadata
- Authors
- Yu, H., Tweed, T., Al-Hussein, M., & Nasseri, R.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2009-08
- Volume
- 135
- Issue
- 8
- Pages
- 782-790
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2009)135:8(782
- OpenAlex
- W2082670337
- Cited by
- 165
- References
- 1
- FWCI
- 22.25
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Development of Lean Model for House Construction Using Value Stream Mapping. https://app.cochat.ai/papers/10.1061/(asce)0733-9364(2009)135:8(782
- The paper
- Yu, H., Tweed, T., Al-Hussein, M., & Nasseri, R. (2009). Development of Lean Model for House Construction Using Value Stream Mapping. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)0733-9364(2009)135%3A8(782
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.