The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization
Abstract
Modularization is a well-established technique that can improve the construction industry by exporting a portion of site-based work to fabrication shops. However, its application in the industry is limited. The Engineering, Procurement and Construction (EPC) industry needs new approaches to reach higher levels of modularization. The purpose of this study is to determine what changes in current EPC processes are needed to create an optimal environment for a broader and more effective use of modularization. In creating such an nvironment, it is necessary to know the factors that lead to success. The most influential critical success factors (CSFs; 21 total) have been determined by the expertise of a research team who compiled a detailed list by adding CSF enablers. CSF enablers are additional steps that can facilitate accomplishment of the associated CSF. A closer look at the top five CSFs indicates that project teams should pay particular attention to module envelope limitations, team agreement on project drivers, adequate owner-planning resources and processes, timely freeze of scoping and design, and due recognition of possible early completion from modularization. This CSFs analysis and addition of enablers provide guidelines and ways to implement strategies for successful modularization in a project and leverages modularization to benefit capital projects.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Lean Thinking—Banish Waste and Create Wealth in your Corporation
Womack, J. P., & Jones, D. T. (1997) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600967 · Cited by 2,122
Multiagent systems: algorithmic, game-theoretic, and logical foundations
(2009) · Choice Reviews Online · doi:10.5860/choice.46-5662 · Cited by 1,756
Cited by
Key constraints and mitigation strategies for prefabricated prefinished volumetric construction
Hwang, B.-G., Shan, M., & Looi, K.-Y. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.136 · Cited by 318
Metadata
- Authors
- O’Connor, J. T., O’Brien, W. J., & Choi, J. O.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2014-06
- Volume
- 140
- Issue
- 6
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2026229742
- Cited by
- 161
- References
- 2
- FWCI
- 8.82
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0000842
- The paper
- O’Connor, J. T., O’Brien, W. J., & Choi, J. O. (2014). Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0000842
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.