Cost Overrun and Cause in Korean Social Overhead Capital Projects: Roads, Rails, Airports, and Ports
The DOI matches its Crossref record.
Abstract
Changes during the life cycle of a project promote cost overrun due to cost increases, time schedule delays, and benefit shortfalls. Specifically, cost overruns are usually due to inefficient budget usage by the national government for social overhead capital (SOC) investments. This paper aims to establish the cost overrun relating to transport policy in an institutional context, discuss the general causes and identify possibilities for their reduction in Korean SOC project preparation and decision making. The establishment of cost overrun probability distributions for a number of reference classes requires access to credible data for a sufficient number of projects within the same reference classes for statistically meaningful conclusions to be drawn. Cost data were available for a total of 161 completed projects. The results indicated that 95 and 100% of road and rail projects, respectively, had a maximum cost overrun of 50%. The causes of cost overruns can be grouped into several major categories: Changes in the scope, delays during construction, unreasonable estimation and adjustment of project costs, and no practical use of the earned value management system.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Cantarelli, C. C., Flyvbjerg, B., Molin, E. J. E., & Wee, B. V. (2010) · European Journal of Transport and Infrastructure Research · doi:10.18757/ejtir.2010.10.1.2864 · Cited by 251
“Lastly, a more recent study by Lee (2008) examined cost overruns in Korean social overhead capital projects.”
Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2019-0047 · Cited by 172
Park, Y., & Papadopoulou, T. C. (2012) · Built Environment Project and Asset Management · doi:10.1108/20441241211280873 · Cited by 91
The cost performance and causes of overruns in infrastructure development projects in Asia
Andrić, J. M., Mahamadu, A.-M., Wang, J., Zou, P. X. W., & Zhong, R. (2019) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2019.8646 · Cited by 61
Metadata
- Authors
- Lee, J.-K.
- Venue
- Journal of Urban Planning and Development
- Published
- 2008-06
- Volume
- 134
- Issue
- 2
- Pages
- 59-62
- ISSN
- 0733-9488 (ISSN-L)
- 1943-5444
- DOI
- 10.1061/(asce)0733-9488(2008)134:2(59
- OpenAlex
- W2120076141
- Cited by
- 141
- References
- 0
- FWCI
- 4.61
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Cost Overrun and Cause in Korean Social Overhead Capital Projects: Roads, Rails, Airports, and Ports. https://app.cochat.ai/papers/10.1061/(asce)0733-9488(2008)134:2(59
- The paper
- Lee, J.-K. (2008). Cost Overrun and Cause in Korean Social Overhead Capital Projects: Roads, Rails, Airports, and Ports. Journal of Urban Planning and Development. https://doi.org/10.1061/(asce)0733-9488(2008)134%3A2(59
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.