Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size

Park, Young‐Ill, Papadopoulou, Theopisti C. · 2012 · Built Environment Project and Asset Management

The DOI matches its Crossref record, with a small difference in title or year; 54 of the 56 references it cites were found in a registry or an index.

Abstract

Purpose: One of the world's largest construction markets is in Asia where construction activity is boosted by investment on transport infrastructure. This paper aims to identify and analyse causes of cost overruns in transport infrastructure projects in Asia and assess their importance and statistical relationship with project size. Design/methodology/approach: The paper pursues the following objectives. First, it identifies factors contributing to cost overruns. Second, using case data and regression analysis, it establishes the statistical relationship between project size and cost overruns. Third, it analyses questionnaire data to rank causes of cost overruns according to their frequency, severity and significance. Last, the paper identifies contract types mostly associated with cost escalation. Findings: The findings confirm a moderate correlation between cost overruns and one indicator of project size. Awarding contracts to the lowest bidder is identified as the most significant cause of cost overruns. Lump‐sum contracts were found to have the greatest influence on the occurrence of cost overruns. Research limitations/implications: Stratified sampling would allow the evaluation of how cost overruns are perceived by different professional groups. Further research can focus on measures for the prevention of cost overruns. Originality/value: The causes of cost overruns have been at the focal point of research however, most studies consider cost overruns in specific Asian countries. Moreover, transport infrastructure projects have received little attention or been underrepresented in datasets comprising general construction projects. The paper seeks to fill this gap by carrying out in‐depth investigation of cost overruns in transport infrastructure in the broader context of Asia.

Overview

Integrity signals

Registry

Crossref · 10.1108/20441241211280873

Cites

54 of 54 references verified0 citation errors · 0 not checkable

Statistics

Recomputing p-values needs the paper’s full text.

Verification

Claims the paper makes

This paper’s full text isn’t openly available, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

2 more claims about this paper

Create a free account to see every claim other papers make about this one.

See all claims — free account

Citations

Cites

Show all 54 references

Research works printed but not linked: 13

  1. Acharya, N.K., Lee, Y.D., Kim, S.Y. and Lee, J.C. (2006), “Analysis of construction delay factor: a Korean perspective”, Industrial Engineering and Management Systems Proceedings of the 7th Asia Pacific Conference, Bangkok, pp. 883‐95.
  2. Ashworth, A. (2004), Cost Studies of Buildings, 4th ed., Pearson Education Limited, Harlow.
  3. Ashworth, A. (2008), Pre‐Contract Studies: Development Economics, Tendering and Estimating, 3rd ed., Blackwell Publishing Limited, Oxford.
  4. Azhar, N., Farooqui, R.U. and Ahmed, S.M. (2008), “Cost overrun factors in construction industry of Pakistan”, Construction in developing countries proceedings of the 1st international conference, Karachi, pp. 499‐508.
  5. Burke, R. (2003), Project Management Planning and Control Techniques, 4th ed., John Wiley and Sons, Chichester.
  6. Chimwaso, D.K. (2000), “An evaluation of cost performance of public projects: a case of Botswana”, Construction in Developing Countries Proceedings of the 2nd International Conference, Gabarone, pp. 81‐91.
  7. Coakes, S.J. and Ong, C. (2011), SPSS Version 18.0 for Windows Analysis without Anguish, John Wiley and Sons, Milton.
  8. Hackett, M., Robinson, I. and Statham, G. (2007), The Aqua Group Guide to Procurement, Tendering and Contract Administration, Blackwell Publishing Limited, Oxford.
  9. Jackson, S. (2002), “Project cost overruns and risk management”, Construction Management Proceedings of the 18th Annual Association of Researchers Conference, Newcastle, pp. 165‐73.
  10. Knight, A. and Ruddock, L. (2008), Advanced Research Methods in the Built Environment, Wiley‐Blackwell, Oxford.
  11. Nega, F. (2008), “Causes and effects of cost overrun on public building construction projects in Ethiopia”, MSc dissertation, Addis Ababa University, Addis Ababa.
  12. Pitcher, R. (1994), Project Cost Control in Construction, 2nd ed., Blackwell Scientific Publications, Oxford.
  13. Russell, R.S. and Taylor, B.W. (2009), Operations Management along the Supply Chain, 6th ed., John Wiley & Sons, Chiehester.

Cited by

See all 91

Metadata

Authors
Park, Y., & Papadopoulou, T. C.
Affiliations
  • Hyundai Engineering (South Korea) (KR)
  • Kingston University London (GB)
Venue
Built Environment Project and Asset Management
Publisher
Emerald
Published
2012-11-16
Volume
2
Issue
2
Pages
195-216
ISSN
2044-124X (ISSN-L)
OpenAlex
W1533006508
Cited by
91
References
56
Citations by year
2026: 4 · 2025: 9 · 2024: 3 · 2023: 9 · 2022: 10 · 2021: 11 · 2020: 10 · 2019: 8 · 2018: 4 · 2017: 7 · 2016: 3 · 2015: 4 · 2014: 7 · 2013: 2
FWCI
5.50
Type
journal article
Language
en
Open access
closed
Licence
www.emerald.com/insight/site-policies (tdm)
Locations
Built Environment Project and Asset Management (publishedVersion)
Topics
  • Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
  • Social Sciences › Business, Management and Accounting › Strategy and Management › Value Engineering and Management
  • Social Sciences › Business, Management and Accounting › Strategy and Management › Public-Private Partnership Projects
Keywords
cost overruns, transport infrastructure, construction projects, project size, fixed-price contracts, contract types, cost escalation, Asia

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size. https://app.cochat.ai/papers/10.1108/20441241211280873
The paper
Park, Y., & Papadopoulou, T. C. (2012). Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size. Built Environment Project and Asset Management. https://doi.org/10.1108/20441241211280873

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.